SECTION 01014
SCOPE AND SEQUENCE OF WORK
PART 1 - GENERAL
1.01 WORK INCLUDED
A. This section of the specification covers the scope and sequence of work for the “2017
Sewer Replacement Project" project in the City of Nashua, NH.
B. The Contractor shall furnish all labor, materials, equipment, and incidentals required to
compete the work as shown on the drawings and as specified herein.
C. The Scope of Work includes cut and cover sewer replacement, cured-in-place pipe, sewer
service connections, manholes, catch basins, street restoration and all work incidental to these
items as shown on the drawings and specified herein
D. Work includes the reconnection of all sewer connections, saw cutting driveways and
intersecting streets, temporary pavement for the trench width, and the
replacement/installation of manholes and catch basins.
E. Work may include excavation through, and removal of, soils potentially containing
undocumented asbestos-containing materials.
1.02 RELATED WORK
A. SECTION 01110- CONTROL OF WORK AND MATERIALS PART
2- PRODUCTS (NOT APPLICABLE)
PART 3 -EXECUTION3.01 GENERAL
A. The Contractor shall be responsible for scheduling its activities and the activities of any
subcontractors involved, to meet the completion date, or milestones, established for the
contract. Scheduling of the work shall be coordinated with the Owner and Engineer.
B. The Construction Sequence Requirements shall be used by the Contractor to form a
complete schedule for the project, which shall be coordinated with the Owner and
Engineer. Prior to performing any work at the site, the Contractor shall submit a
detailed plan to the Engineer for review. The plan shall describe the proposed
sequence, methods, and timing of the work.
C. The Contractor shall coordinate with all utilities to insure complete coordination of other
ongoing construction projects within the project area.
END OF SECTION
01014-1