Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P246

Finance Committee - Agenda - 5/17/2017 - P246

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
246
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

CNAME WN

\O

10.
11.
12.
13.
14.
15.

SECTION 01110

CONTROL OF WORK AND MATERIALS

General

Hauling, Handling and Storage of Materials
Easements

Open Excavations

Maintenance of Traffic

Care and Protection of Property

Protection and Relocation of Existing Structures and Utilities
Maintenance of Flow

Rejected Materials and Defective Work

Sanitary Regulations

Safety and Health Regulations

Site Investigation

Electric Service

Hazardous Waste

Disposal of Excess Material and/or Hazardous Material

General A.

Scope:

The requirements under this section are applicable to all work completed under this
Contract.

Hauling, Handling and Storage of Materials

A.

B.

The Contractor shall, at his own expense, handle and haul all materials furnished by
him and shall remove any of his surplus materials at the completion of the work.

The Contractor shall provide suitable and adequate storage for equipment and
materials furnished by him that are liable to injury and shall be responsible for any
loss of or damage to any equipment or materials by theft, breakage, or otherwise.

All excavated materials and equipment to be incorporated in the Work shall be placed
so as not to injure any part of the Work or existing facilities and so that free access
can be had at all times to all parts of the Work and to all public utility installations in
the vicinity of the work. Materials and equipment shall be kept neatly piled and
compactly stored in such location as will cause a minimum of inconvenience to
public travel and adjoining owners, tenants and occupants.

The Contractor shall be responsible for all damages to the work under construction

during its progress and until final completion and acceptance even though partial
payments have been made under the Contract.

01110-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P246

Footer menu

  • Contact