12. The Decontamination Facility shall be wet cleaned using approved methods upon
completion of any waste removal.

13. Thecarts or drums may be temporarily stored in a holding area outside the Work
Area until a transport vehicle arrives, but such storage areas must be acceptable to
the Engineer.

14. Routes through the work area to be used for the transportation of contaminated
wastes shall be acceptable to the Engineer.

Finance Committee - Agenda - 5/17/2017 - P339

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P339

10.

11.

cycling of air outward through the Shower and Clean Room when used for waste
removal.

Finance Committee - Agenda - 5/17/2017 - P338

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P338

3.08

ASBESTOS WASTE DISPOSAL PROCEDURES

This Subsection specifies requirements for the removal, handling, and disposal of all
asbestos-containing materials from the site except for non-friable asbestos-containing
transite pipe that shall be disposed of in accordance with Subsection 3.06. All costs
associated with complying with this Subsection and any other applicable Federal, State,
or local regulations regarding packaging and disposal of ACM shall be included in
payment items in this Subsection.

Finance Committee - Agenda - 5/17/2017 - P337

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P337

8. Cut the insulation sharply for neat sealing of exposed insulation. Leave 4-inch
minimum margin at the bag seal point for safety.

9. After removal of all asbestos, wash down all surfaces to below the levels where
the bag will be sealed, and saturate the waste. Ensure the absence of residue in
folds, on the back side of pipe, ete.

10. Glove bags shall be used for only one operation and then be disposed of. Glove
bag shall not be slid down the pipe and/or reused.

F. Post Removal Procedures:

Finance Committee - Agenda - 5/17/2017 - P336

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P336

The Contractor shall provide and utilize all equipment necessary to perform glove bag
work.

Maximum temperature of components (pipe, ducts, stacks, etc.) allowable for glove bag
Work shall be as specified by glove bag manufacturer.

If pipe insulation is in damaged condition, then this material must be repaired prior to
removal.

Removal Procedure:

Finance Committee - Agenda - 5/17/2017 - P335

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P335

3.07

b. Asbestos-Containing Electrical Cable Wrap:

Wet and cut cable using mechanical cutting tool, such as bolt cutters.
Encapsulate cut ends, place cut sections into Disposal Bags, and place
packaged waste into an acceptable waste transportation vehicle.

Should the Contractor remove any Non-Friable Asbestos-Containing Material in a
manner which makes the material friable, the Contractor shall be responsible for
handling and disposing of this material as friable Asbestos-Containing Waste at
no additional cost.

Finance Committee - Agenda - 5/17/2017 - P334

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P334

the section to fill the area of the removed insulation and seal the insulation within
the section. Allow the mortar to adequately dry.

As each section of material is cut free and properly prepared, remove the sections
from the trench.

Prepared component sections will immediately be placed into an acceptable waste
transport vehicle. No stockpiling of removed components will be allowed outside
of a locked, secure waste transport vehicle.

D. For the removal of Non-Friable Asbestos Materials, the Contractor shall:

1.

Finance Committee - Agenda - 5/17/2017 - P333

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P333

work without containment structures. The Contractor shall not begin any Work until he
has verified that the excavation (trench) has been adequately shored and that all
pertinent life safety systems are in place. It is the Contractor's responsibility to select the
means and methods to ensure that the release of asbestos fibers into the environment
does not occur and that the procedures are in compliance with governing regulations.

B. For the removal of Friable Asbestos Materials, the Contractor shall:

Finance Committee - Agenda - 5/17/2017 - P332

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P332

3.06

10.

11.

After large areas of Asbestos-Containing Materials have been fully wetted and
tested, the asbestos shall be carefully removed in small sections by hand using
suitable tools

Finance Committee - Agenda - 5/17/2017 - P331

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P331

3.04

3.05

9. Where space allows, provide a separate Decontamination Facility consisting of a
serial arrangement of rooms, holding area, and Wash Room for removal of
equipment and material from the Work Area. Do not allow personnel to enter or
exit Work Area through the Equipment/Waste Decontamination Facility.