12. The Decontamination Facility shall be wet cleaned using approved methods upon
completion of any waste removal.
13. Thecarts or drums may be temporarily stored in a holding area outside the Work
Area until a transport vehicle arrives, but such storage areas must be acceptable to
the Engineer.
14. Routes through the work area to be used for the transportation of contaminated
wastes shall be acceptable to the Engineer.
The container used for the storage of bagged contaminated waste shall be an enclosed
canister. Canisters shall have a solid metal roof and a solid metal door with padlock.
Line the cargo area with two layers of 6 mil polyethylene sheeting to prevent
contamination from damaged or leaking containers. Polyethylene floor sheeting shall be
installed first and shall extend up the sidewalls 24 inches minimum. Polyethylene wall
sheeting shall be overlapped and taped securely into place. No unbagged contaminated
waste or non-asbestos waste shall be stored in these containers. Ensure that bags placed
in containers are undamaged. Warning signs shall be posed on the container in
accordance with Sections 29 CFR 1926.1101 of the OSHA regulations.
The Contractor must pre-schedule and obtain the agreement of the Engineer for all time
periods Contractor desires to remove Disposal Bags from the facility. The Engineer
must observe removal of all waste containers to verify their condition and the total
volume of waste material (to the nearest cubic yard).
It 1s the responsibility of the Contractor to determine and insure that Contractor is
complying with: 1) the current waste handling regulations applicable to each Work
Area, and 2) the current regulations for transporting and disposing waste at each ultimate
disposal landfill. The Contractor must comply fully with these regulations; and with all
U.S. Department of Transportation, state, local, and EPA requirements.
Where required, the Contractor's waste hauler and disposal subcontractor shall maintain
a valid hazardous waste transporter's permit and identification number; and obtain,
complete, and fully comply with any other local waste manifesting requirements.
Waste Shipment Records (WSR): The Contractor shall be responsible for supplying,
preparing and signing all WSRs using a multi-part carbonless form set in the form
specified in 40 CFR 61.149 Figure 4 as required by 40 CFR 61.150 (d)(1). Blank forms
are available from the Engineer.