Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 34311 - 34320 of 38765

Board Of Aldermen - Minutes - 5/24/2016 - P13

By dnadmin on Sun, 11/06/2022 - 21:35
Document Date
Tue, 05/24/2016 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 05/24/2016 - 00:00
Page Number
13
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__052420…

Board of Aldermen Page 13
May 24, 2016

UNFINISHED BUSINESS — ORDINANCES

O-16-011
Endorsers: Alderman Don LeBrun
Alderman Ken Siegel
Alderman David Schoneman
Alderman Tom Lopez
ADOPTING PROVISIONS FOR REDUCED TAXATION FOR CERTAIN CHARTERED
PUBLIC SCHOOL FACILITIES
e Tabled at Full Board Level — 5/10/16

NEW BUSINESS — RESOLUTIONS

R-16-035
Endorsers: Mayor Jim Donchess
Alderman Ken Siegel
Alderman-at-Large Daniel T. Moriarty
RELATIVE TO THE RESCINDING OF AUTHORIZED UNISSUED DEBT
Given its first reading; assigned to the Budget Review Committee by President McCarthy
R-16-036
Endorser: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderman June M. Caron
Alderman-at-Large Mark S. Cookson
Alderman Tom Lopez
Alderman-at-Large Michael B. O’Brien, Sr.
Alderwoman Mary Ann Melizzi-Golja
UPDATING THE FINANCIAL STANDARDS FOR THE CITY’S WELFARE GUIDELINES
Given its first reading; assigned to the Personnel/Administrative Affairs Committee by President McCarthy

R-16-037
Endorsers: Alderman Richard A. Dowd
Alderman-at-Large Lori Wilshire
Alderman June M. Caron
Alderman Ken Siegel
Alderwoman Mary Ann Melizzi-Golja
Alderman-at-Large Michael B. O’Brien, Sr.
Alderman Tom Lopez
Alderman-at-Large Brian S. McCarthy
AUTHORIZING THE TRANSFER OF UP TO $1,146,336 FROM THE SCHOOL CAPITAL
RESERVE FUND INTO CAPITAL PROJECT ACTIVITY “SCHOOL HVAC IMPROVEMENTS”
FOR THE PURPOSE OF IMPROVING HVAC SYSTEMS AT VARIOUS SCHOOLS
Given its first reading; assigned to the Budget Review Committee by President McCarthy

Page Image
Board Of Aldermen - Minutes - 5/24/2016 - P13

Board Of Aldermen - Agenda - 5/30/2018 - P2

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
2
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
O-18-012

ORDINANCE

AMENDING THE FEE SCHEDULE OF THE CITY BUILDING REGULATIONS

CITY OF NASHUA

In the Year Two Thousand and Eighteen

The City of Nashua ordains that Part II “General Legislation”, Chapter 105 “Building
Construction”, Article VI “Fees”, Section 105-22 “Fee Schedule” of the Nashua Revised
Ordinances, as amended, be hereby further amended by deleting the struck-through language and
adding the new underlined language as follows:

“§ 105-22. Fee Schedule.

A.

Building permit fee schedule.

(1)

(2)

(3)

A nonrefundable application processing fee shall be paid at the time of filing of
any application:

(a) Building permit: $2535.

New buildings, additions, alterations, mobile homes, in-ground swimming pools,
basements, connecting structures, future expansion areas and areas capable of
being used as living or occupiable space shall be included to calculate aggregate
floor area:

(a) Residential — 1 & 2 Family and Townhouses (per square foot of area
affected): $0.4415.

(b) Commercial — including Multi-Family (per square foot of area affected):
$0.2025.

Structures designed and certified to LEED standards shall be eligible for the
following reduction in their building permit fee:

(a) LEED standard certification: 5%.
(b) LEED silver certification: 10%.
(c) LEED gold certification: 15%.

(d) LEED platinum certification: 20%.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P2

Board Of Aldermen - Agenda - 5/30/2018 - P3

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
ORDINANCE O-18-012

(4) Alterations, repairs, fire damage:
(a) Residential (per square foot of area affected): $0.0610.
(b) Commercial (per square foot of area affected): $0.4415.

(5) Additional plan review for minor modifications of previously approved drawings,
including commercial tenant fit-up:

(a) Residential (per square foot of area affected): $0.90305.
(b) Commercial (per square foot of area affected): $0.0710.

(c) When, in the Building Official's opinion, the nature of the work is not
related to floor area, the permit fee may be based on a construction cost of

9-006-mills-per-delar$0.60 per $100.
(6) Moving a building from lot to lot: $455180.

(7) | Demolition — the total removal and disposal of a structure:
(a) Up to 1,000 square feet: $2230.

(b) Excess beyond 1,000 square feet (fee for each additional 100 square feet
or part thereof of aggregate floor area): $2593.

(8) Hlevaters—$88- Certificate of Occupancy — existing space/owner change: $50.

(9) Special construction — not including signs, but including and not limited to
membrane structures, temporary structures, canopies and awnings, pedestrian
walkways, radio and television towers, radio and television antennas, elevators,

commercial solar energy systems, commercial wind energy systems and
commercial (other than asphalt roofing shingles) re-roofing:

(a) Fee shall be based on a construction or installation cost of 9-006-m#Hls-per
dettar$0.60 per $100.

(10) Retaining walls over four feet in height above grade G@vhicheveris-sreater):

(a) Minimunm—355—or Residential: minimum $25 or $0.10 per linear foot
(whichever is greater).

(b) Pertnearfeet—$020- Commercial: minimum $50 or $0.25 per linear foot
(whichever is greater).

(11) Minimum fee for miscellaneous equipment (each), excluding the application fee,
where not otherwise provided for by this section [for example: residential
antennas, small sheds (less than $90200 square feet), or construction trailers] or as
deemed appropriate by the Building Official or his or her designee:

(a) Residential: $4020.
(b) Commercial: $3545.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P3

Board Of Aldermen - Agenda - 5/30/2018 - P4

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
ORDINANCE

O-18-012

(12) Re-inspection of the same work due to the failure to pass an initial inspection or
the unavailability of the premises at the time of initial inspection: $3075.

(13) Phased construction (foundation permits, interior demolition permits or shell
Pp
permits): Phased construction shall be charged a 25% surcharge on the original
permit fee for each upgrade phase.

(14) Surcharge for permits issued after construction started without a permit: 100% of
applicable fee, but not to exceed $250$275 Residential / $500 Commercial.

(15) Expedite-service fee for special processing and after-hours service: $75 per hour
per staff member, with a minimum of $459200 (4ve-heurs) for weekends or time
not contiguous with normal work hours.

B. Mechanical permit fee schedule.

(1) Residential mechanicalneludine multfamily (1 & 2 Family and Townhouses).

(a)
(b)

(c)

(d)

Nonrefundable application processing fee: $2530.

Delivery system:

[1]

[2]
[3]

Gas supply piping (base fee downstream of meter or regulator set;
test witnessed) (each): $49— 0-99k BTU - $25; 100-199k BTU -
$40; 200k BTU and above - $50 plus $0.22 per 1,000 BTU.

Gas supply outlets (each branch): $3396.50.

Installation of Fuel oil storage tanks less than 499 gallons, fuel oil
(each): $6-5015.

Equipment:

[1]

[2]

43]
Bi4l
4415]
Pie]
to1Z]

FAILS]
£8419]

Furnace: $3850940.

Water Heater: $15.

Refrigeration system piping, coil, or condensing unit: $6-5015.
Boiler, water or steam: $38-5040.

Boiler, water or steam, with domestic hot-water generator: $4445.
Burner, conversion or replacement, oil or gas: $6-3015.

Heater, vented or unvented, floor, wall, room or gas log (each):
$650925.

Dryer, exhaust or ventilation fan er-baseboardteep(each): $36.
Baseboard loop (each): $10.

Wood or pellet stove and associated chimney: $4940.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P4

Board Of Aldermen - Agenda - 5/30/2018 - P5

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
ORDINANCE O-18-012

(e) Factory-built fireplace and associated chimney, gas or solid fuel (each):
$2440.

(f) Masonry fireplace and associated chimney: $49-5975.
(g) Manufactured Chimney: $2430.

(h) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.

(i) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5075.

Qj) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $250275.

(2) Commercial mechanical (including Multi-Family).

(a) Nonrefundable application processing fee: $2530.
(b) Delivery system:

[1] Gas pipe (per +900 BTU}-$0-22 Graximum $309): 0-100k BTU -
$50: over 100k - $50 plus $0.25 per 1,000 BTU.

[2] Fuel oil pipe (per 1,000 BTU): $0.2225. Gaaxtmuns$300)-

[3] Installation of Fuel oil storage tanks less than 499 gallons, fuel oil
(each): $6-5015.

(c) Equipment:
[1] Furnace: $4450.
[2] _ Water Heater: $20.
f24[3] Boiler: $49:5055.

34[4] Single-package (includes rooftops) air handlers: $4925.

f4H[5] Chiller, evaporator, condenser or cooling tower (each): $4925.

{54[6] Duct work (per 10 square feet of area served): $0.03340 (minimum
$25).

f6}[7] Fire and smoke dampers: $6598.
(d) Chimney (masonry or metal): $4475.
(e) Vented unit heater: $4940.
(f) Fans: $4925.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P5

Board Of Aldermen - Agenda - 5/30/2018 - P6

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
6
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED

ORDINANCE O-18-012
(g) Kitchen exhaust systems:
[1] Hoods (each): $3375.
[2] Fans associated with hoods — replacement (each): $359010.
(h) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.
(i) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
(j) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $259500.
C. Electrical permit fee schedule.
(1) Residential electricalinehidine multtfamily (1 & 2 Family and Townhouses).

(a)

Nonrefundable application processing fee: $2530.

Note: If the items in Subsection C(2) through (6) are included with any other
work listed in those sections, there is no additional fee. (Example: if doing new
construction, there is no charge for the house meter.) The higher price will
prevail.

(b)

(c)
(d)

(e)
(f)
(g)
(h)
(i)

New construction, additions, renovations (per square feet of habitable
area): $0.06575.

[1] Service entrance (new dwelling only): $245030.
House meter: $4450.

Service change:

[1] Up to three two units: $4450.

[2] Each additional unit: $910.

Adding subpanel(s) (each): $4925.

Adding or relocating meter(s): $4450.

Pools (in-ground): $4450.

Temporary service (each): $38-5045.

Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P6

Board Of Aldermen - Agenda - 5/30/2018 - P7

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
7
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED

ORDINANCE
(j)
(k)
(2)

O-18-012

Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5075.

Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $259275.

Commercial electrical Gancluding Multi-Family).

(a)
(b)
(c)
(d)
(e)

(f)
(g)
(h)

(i)
i)
(k)
(1)
(m)

(n)

Nonrefundable application processing fee: $2530.

Electrical service entrance and service change (per amp): $0.3340.
Temporary service (each): $38-5045.

Panels and subpanels (each): $63925.

Outlets:

[1] For switches, receptacles, and fire and smoke detectors (each):
$0.8895.

[2] For lighting and lighting fixtures, except as otherwise provided
(each four feet of continuous fluorescent lighting shall be deemed a
separate lighting fixture) (each): $0.8895.

[3] For ranges, dryers, and similar heating devices (each): $5598.

[4] For high-intensity lighting and fixtures (each) (250 watt and
above): $910.

Fixed multi-outlet receptacle assemblies (for each six feet): $4506.
Track lighting (each 10 feet): $4596.

Motor control centers (each), automatic transfer switches (each), wiring of
HVAC units (per unit): $28-5932.

Water heaters (each): $912.

Electric baseboard heat (per unit): $3598.

Buss ducts (each section): $65910.

Transformers, generators, motors, x-ray machines (each): $4922.
Paging and sound systems:

[1] Per speaker: $23.

[2] Per console: $4922.

Signs (each): $275032.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P7

Board Of Aldermen - Agenda - 5/30/2018 - P8

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
8
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
ORDINANCE

(0)

(p)

(q)

(r)

O-18-012

Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.

Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.

Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $259500.

Annual permit fee: $465250.

[1] In lieu of an individual permit for each alteration to an already
approved electrical installation, the Code Official shall issue an
annual permit, upon application therefor, to any person, firm or
corporation regularly employing one or more certified electricians
in the building, structure or on the premises owned or operated by
the applicant for the permit.

[2] Annual records. The person to whom an annual permit is issued
shall keep a detailed record of all alterations to an approved
electrical installation made under such annual permit, and such
records shall be accessible to the Code Official at all times or shall
be filed with the Code Official as designated.

D. Plumbing permit fee schedule.
(1) Residential plumbing-inehidine- multifamily (1 & 2 Family & Townhouses).

(a)
(b)

(c)
(d)
(e)

Nonrefundable application processing fee: $2530.

Per fixture (tub, shower, sink, water closet, lavatory, dishwasher, garbage
grinder, outside faucet, clothes-washing machine, backflow preventer,
etc.): $6507.50.

Irrigation system (includes backflow preventer): $912.
Pumps and ejectors (each): $4215.
Water heaters (each): $65015.

(e\(f) Water pipes (per 100 feet or part thereof): $4215.
(2)
)(h)
Pa

Sanitary sewer connection: $4215.
Drainage, waste and vent pipes: (per 100 feet or part thereof): $4215.

Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P8

Board Of Aldermen - Agenda - 5/30/2018 - P9

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
9
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED

ORDINANCE

(2)

90)

@(k)

O-18-012

Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5075.

Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $259275.

Commercial plumbing (including Multi-Family).

(a)
(b)

(c)
(d)

Nonrefundable application processing fee: $2530.

Per fixture (tub, shower, sink, water closet, lavatory, floor drain, drinking
fountain, urinal, dishwasher, garbage grinder, outside faucet, clothes-
washing machine, washdown station, etc.): $6508.

Pumps and ejectors (each): $245030.
Grease interceptor: $4925.
Water heaters (each): $4218.

(2)

ch)
€5)
0)

Irrigation system (includes backflow preventer): $4415.

Backflow preventer (each):

[1] Atmospheric vacuum breakers: $4214.

[2] Pressure vacuum breakers: $4214.

[3] Dual check valve: $4214.

[4] Reduced-pressure principle: $4214.
Water pipes: (per 100 feet or part thereof): $4215.
Sanitary sewer connection: $4215.

Drainage, waste and vent pipes: (per 100 feet or part thereof): $4215.

4(k) Storm (drain) sewer connection: $4215.

e()

Storm piping: (per 100 feet or part thereof): $4215.

¢e)(m) Roof drains (each): $4215.

p(n) Minimum fee for miscellaneous equipment (each), excluding the

application fee, where not otherwise provided for by this section: $3335.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P9

Board Of Aldermen - Agenda - 5/30/2018 - P10

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
10
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
ORDINANCE O-18-012

€q\(0) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5075.

*(p) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $259500.”

All other ordinances or parts of ordinances inconsistent herewith are hereby repealed.

This ordinance shall become effective 30 days after passage.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P10

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3428
  • Page 3429
  • Page 3430
  • Page 3431
  • Current page 3432
  • Page 3433
  • Page 3434
  • Page 3435
  • Page 3436
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact