Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 5/30/2018 - P4

Board Of Aldermen - Agenda - 5/30/2018 - P4

By dnadmin on Sun, 11/06/2022 - 22:20
Document Date
Mon, 05/28/2018 - 11:32
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 05/30/2018 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__053020…

AMENDED
ORDINANCE

O-18-012

(12) Re-inspection of the same work due to the failure to pass an initial inspection or
the unavailability of the premises at the time of initial inspection: $3075.

(13) Phased construction (foundation permits, interior demolition permits or shell
Pp
permits): Phased construction shall be charged a 25% surcharge on the original
permit fee for each upgrade phase.

(14) Surcharge for permits issued after construction started without a permit: 100% of
applicable fee, but not to exceed $250$275 Residential / $500 Commercial.

(15) Expedite-service fee for special processing and after-hours service: $75 per hour
per staff member, with a minimum of $459200 (4ve-heurs) for weekends or time
not contiguous with normal work hours.

B. Mechanical permit fee schedule.

(1) Residential mechanicalneludine multfamily (1 & 2 Family and Townhouses).

(a)
(b)

(c)

(d)

Nonrefundable application processing fee: $2530.

Delivery system:

[1]

[2]
[3]

Gas supply piping (base fee downstream of meter or regulator set;
test witnessed) (each): $49— 0-99k BTU - $25; 100-199k BTU -
$40; 200k BTU and above - $50 plus $0.22 per 1,000 BTU.

Gas supply outlets (each branch): $3396.50.

Installation of Fuel oil storage tanks less than 499 gallons, fuel oil
(each): $6-5015.

Equipment:

[1]

[2]

43]
Bi4l
4415]
Pie]
to1Z]

FAILS]
£8419]

Furnace: $3850940.

Water Heater: $15.

Refrigeration system piping, coil, or condensing unit: $6-5015.
Boiler, water or steam: $38-5040.

Boiler, water or steam, with domestic hot-water generator: $4445.
Burner, conversion or replacement, oil or gas: $6-3015.

Heater, vented or unvented, floor, wall, room or gas log (each):
$650925.

Dryer, exhaust or ventilation fan er-baseboardteep(each): $36.
Baseboard loop (each): $10.

Wood or pellet stove and associated chimney: $4940.

Page Image
Board Of Aldermen - Agenda - 5/30/2018 - P4

Footer menu

  • Contact