personnel training; performing QC testing during Geomembrane installation;
and maintaining records documenting installation.
G. Subgrade Surface: The soil surface that immediately underlies geosynthetic
material.
13 SUBMITTALS
A. CONTRACTOR shall submit the following information to ENGINEER:
1. ‘Installation Contractor qualifications, including project descriptions with
references.
2. Brand of Geomembrane to be used, and a statement from the
Geomembrane Manufacturer detailing its properties and composition, and
a description of the GGomembrane Manufacturer’s QC program.
3. Draft warranties regarding quality of workmanship, materials, and long-
term performance of the GGomembrane.
4. Shop Drawings showing extent, sizes, panel identification numbers, and
details of the GGomembrane installation, including recommendations for
terminating the material and proposed methods of sealing around
penetrations if different from those shown on the Drawings.
5. |The Geomembrane Manufacturer’s certification that the resin used meets
the Specifications. The QA/QC certificates issued by the Geomembrane
Manufacturer and the resin supplier shall be provided.
D. Prior to shipping the Geomembrane from the factory, CONTRACTOR shall
provide the roll certifications to the CQA Consultant.
E. Prior to deploying Geomembrane, the Installation Contractor shall allow
ENGINEER to review the Subgrade Surface.
14 QUALIFICATIONS OF INSTALLATION CONTRACTOR AND MANUFACTURER
A. To perform the work of this Specification, the Installation Contractor shall have
demonstrated by previous experience its ability to do the Work.
B. The Installation Contractor shall provide the services of a competent field
technical representative throughout the installation of the Gomembrane. The
field technical representative shall remain on-site throughout the installation of
the Geomembrane for Gcomembrane layout, seaming, patching, testing, repairs,
and other activities of the Installation Contractor.
D. All personnel performing seaming operations shall be qualified by experience
and by successfully passing seaming tests.
E. All field seams shall be inspected over their full length in accordance with these
Specifications by the Installation Contractor in the presence of the CQA
Consultant or the CQA Consultant’s representative.
File No. 3066.21 Geomembrane 02550 - 2 of 10 January 2021