SECTION 02350
ODOR CONTROL DURING CONSTRUCTION
PART 1 - GENERAL
11 SCOPE OF WORK
A.
The Contractor shall perform its work so that odors are limited to the
immediate working area during construction activities involving excavation
in waste.
Should the Contractor fail to control odors, additional methods to prevent
off-site detection of odors shall be performed by the Contractor at no cost to
the Owner.
Additional odor controls methods include using neutralizing agents and a
portable misting system.
PART 2 - PRODUCTS
2.1 MATERIALS
A.
B.
Odor controls neutralizing agents shall be proposed by the Contractor for
approval by the Owner.
The portable misting system (if needed) shall be proposed by the Contractor
for approval by the Owner.
PART 3 - EXECUTION
3.1 GENERAL
A.
The Contractor shall implement odor control measures during construction
activities that involve excavation in waste.
The area of exposed waste as a result of the work shall be limited to the
degree practical. Trench excavations shall be limited to the length of trench
that may be backfilled in the same day.
If directed by the Owner, the Contractor shall apply odor neutralizing agent
directly onto odorous spoils.
Excavated waste shall be hauled promptly from the work area to the working
face for disposal. All excavated waste must be hauled to the working face
before the end of each working day. Work involving excavation in waste
shall cease when the working face is closed for the day unless other
arrangements have been made to cover the exposed waste.
File No. 3066.21
Odor Control During Construction 02350 - Page 1 of 2 January 2021