Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 32401 - 32410 of 38765

Finance Committee - Agenda - 3/17/2021 - P513

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
513
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Section 01310 - Project Coordination and Meetings Page 2 of 2

January 2021

3066.21

not conscientious, or not industrious, then CONTRACTOR shall replace the
supervisory representative upon written request of OWNER or ENGINEER.

CONTRACTOR shall only employ competent individuals on the job. Whenever
OWNER or ENGINEER notifies CONTRACTOR in writing that, in his/her
opinion, any individual on the job, whether employed by CONTRACTOR or any
of the subcontractors imperils the safety of others or is incompetent,
unfaithful, disorderly, or otherwise unsatisfactory, such individual shall be
discharged from the Contract work and shall not be employed on it, except
with the written consent of OWNER.

PART 2 - PRODUCTS

Not used.

PART 3 - EXECUTION

Not used.

[END OF SECTION 01310]

P:\3000s\3066.21\Source Files\Tech Specs\Division 1 Specifications\01310 Meetings.docx

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P513

Finance Committee - Agenda - 3/17/2021 - P514

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
514
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

SECTION 01320

SURVEY CONTROL

PART 1 - GENERAL

1.1 SURVEY REFERENCE POINTS

A.

OWNER has established survey control points around the Site for construction
horizontal and vertical control. OWNER shall provide survey control point
information to the CONTRACTOR once the contact is awarded.

CONTRACTOR shall safeguard all survey control points. Should any of these
points be destroyed, then the replacement cost will be borne by CONTRACTOR.
CONTRACTOR shall assume the entire expense of rectifying work improperly
constructed due to failure to maintain and protect established survey control
points.

12 QUALIFICATIONS

A.

CONTRACTOR shall employ competent personnel to provide the surveying
functions necessary for the proper construction of the Work. CONTRACTOR
shall be responsible for the layout of all grid coordinate locations, lines, grades,
and levels necessary for the proper construction and testing of the Work called
for in the Drawings and Specifications, at no additional cost to OWNER.

13 SURVEY REQUIREMENTS

A.

CONTRACTOR shall make all measurements and check all dimensions
necessary for proper construction in accordance with the Drawings and
Specifications. During the execution of the Work, CONTRACTOR shall make all
necessary measurements to prevent misalignment of said Work, and shall be
responsible therefore for the accurate construction of the Project.

CONTRACTOR shall be responsible for providing a surveyor to measure
quantities for payment. Prior to submitting an application for payment,
OWNER’s field representative shall approve measured quantities for payment.
OWNER reserves the right to employ a surveyor to check CONTRACTOR’s
measurements prior to payment.

CONTRACTOR and/or CONTRACTOR’s surveyor shall keep and update Record
Drawings throughout the project, which shall be available to view by OWNER
and ENGINEER.

PART 2 - PRODUCTS

Not used.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P514

Finance Committee - Agenda - 3/17/2021 - P515

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
515
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Section 01320- Survey Control Page 2 of 2

January 2021

3066.21

PART 3 - EXECUTION

3.1

GENERAL

A.

CONTRACTOR shall obtain as-built elevation information using the site
coordinate system and datum (in the New Hampshire State Plane coordinate
system, vertical datum NAVD-88, as indicated on the Drawings).

The survey equipment used shall have a precision to the 0.01 feet.

As-built information shall include horizontal and vertical coordinate

information for the following:

1. All gas collection and control system pipes (solid and perforated) at 50
foot increments, at all changes in grade, and at all fitting locations;

2. All vertical gas extraction wells installed;

3, Pipe connection locations; and

4. Road crossing culverts.

As-built drawings shall be prepared using computer aided drafting software
and saved in .dwg format. The electronic file shall contain the survey points
used to generate the drawing.

As-built drawings are to be provided within 30 days of issuance of a
“Certificate of Substantial Completion.”

CONTRACTOR will provide ENGINEER with required as-built survey data with
progress payment requests. ENGINEER will not approve applications for
progress payments for payment, if the required as-built data does not reflect
site conditions through the requisition period. Final payment will not be made
until the as-built survey data has been reviewed and approved by ENGINEER.

[END OF SECTION 01320]

P:\3000s\ 3066.2 1\Source Files\Tech Specs\ Division 1 Specifications\01320 Survey.docx

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P515

Finance Committee - Agenda - 3/17/2021 - P516

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
516
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

SECTION 01330

SUBMITTALS

PART 1 - GENERAL

1.1

1.2

1.3

DESCRIPTION

A.

This section specifies the general requirements and procedures for preparing
and transmitting data to ENGINEER for their information or review.
CONTRACTOR shall deliver all submittals to ENGINEER in a form acceptable to
ENGINEER.

CONTRACTOR'S DRAWINGS

A.

D.

The Drawings shall show the general arrangement and details as necessary to
provide a comprehensive description of the work to be performed.

As indicated below, CONTRACTOR shall prepare shop and working drawings,
for temporary and permanent work, and for the proposed methods of
construction as required under the applicable sections of the Specifications,
complete with all relevant calculations, descriptions, technical, and
performance data, as necessary to adequately perform the Work.
CONTRACTOR shall take responsibility for such drawings and for the safe and
successful construction of the Work.

Shop drawings shall be presented in a clear and thorough manner, complete
with respect to dimensions, design criteria, materials of construction,
manufacturer, and like information to enable ENGINEER to review information
as required.

Sheet size: 8% inches x 11 inches or larger, as required.

CONSTRUCTION PROGRESS SCHEDULES

A.

CONTRACTOR shall submit progress schedules in a format that displays the
timeframes for each Work item using individual horizontal bars. The schedule
shall include a separate bar for each major operation, identifying the first and
last workday of each operation. The schedule shall show the complete
sequence of construction activities, identify the Work of separate stages, the
projected percentage of completion for each item of Work at the time of each
Application for Payment, submittal dates for shop drawings, product data, and
samples, and product delivery dates, including those furnished by OWNER (if

any).
CONTRACTOR shall update the construction progress schedule every two

weeks during the project to reflect the Work completed and any changes in the
schedule.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P516

Finance Committee - Agenda - 3/17/2021 - P517

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
517
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Section 01330 - Submittals Page 2 of 4
January 2021 3066.21

1.4

1.5

1.6

1.7

1.8

C. The schedule shall account for ENGINEER’s Contract Administration and
quality control responsibilities.

PRODUCT DATA

A. CONTRACTOR shall submit copies of product data sheets as required in the
Specifications. CONTRACTOR shall clearly mark each copy of product data
sheets to identify applicable products, models, options, and other data.

MANUFACTURER'S INSTRUCTIONS

A. Where required in individual Specifications, CONTRACTOR shall submit the
manufacturer’s printed instructions for delivery, storage, assembly,
installation, adjusting, and finishing, in quantities specified for the product
data.

SAMPLES

A. Samples shall be clearly identified as to material, manufacturer, and pertinent
catalog numbers, and use for which intended, and shall be of sufficient size and
quantity to clearly illustrate functional characteristics of item, with integrally
related parts and attachment devices.

CONTRACTOR RESPONSIBILITIES
A. Review shop drawings and samples prior to distribution.

B. Determine and verify:
1. Field measurements;
2. Field construction criteria;
3. Catalog numbers and similar data; and
4. Conformance to Specifications.

C. Coordinate each submittal with the requirements of the Work and of the
Contract Documents.

D. Notify ENGINEER in writing, at time of submission, of any deviations in the
submittal from the requirements of Contract Documents. Any such deviations
permitted by ENGINEER will require modifications to the Contract Documents.

E. Begin no fabrication or Work that requires submittals until submittals have
been reviewed and accepted by ENGINEER.

SUBMISSION REQUIREMENTS

A. Submittals should be provided electronically. If a paper copy must be
submitted, then one copy may be submitted to ENGINEER promptly in
accordance with approved schedule and in such sequence as to cause no delay
in Work.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P517

Finance Committee - Agenda - 3/17/2021 - P518

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
518
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Section 01330 - Submittals Page 3 of 4
January 2021 3066.21
B. CONTRACTOR shall complete all of the following items no later than the

specified number of calendar days.

Associated shipping, work, and use of

materials by CONTRACTOR shall not begin until ENGINEER’s review of each
respective submittal is complete and where resubmission by CONTRACTOR is
not required by ENGINEER. ENGINEER shall reply to CONTRACTOR within 7
calendar days of receipt of each submittal and state whether or not

CONTRACTOR must resubmit.

Submittal

Due (Calendar Days)

Site Specific Health and Safety Plan.

10 days from the Notice
of Award

Construction Schedule. With Bid and every two
weeks during the
project.

Shop Drawings, Product Data and Samples, Material Specifications/ | 15 days prior to

Submittals related to but not necessarily limited to:

=» Wellheads;

= Geomembrane;

"= Nonwoven Geotextile;

« Aggregate and soil materials;
= Wellhead assemblies;

= Well Caps;

» Submersible pumps and appurtenances;

» Air Line Isolation Valves; and

" HDPE pipe, fittings and appurtenances.

placement and/or use.

Pipe pressure test report.

Within 7 days following
the test

Final Record Document Submittal.

No more than 14 days
from demobilization
from the site and prior
to application for final
payment.

Contractor’s Written Certification of Substantial Completion.

Prior to application for
final payment.

C.

Submittals shall contain:
1. Date of submission;

2. Project title and number;

3. Names of:
a. Contractor

b. Manufacturer/Supplier;

Identification of product, with specification section number;
Field dimensions, clearly identified as such;

Relation to adjacent or critical features of work or materials;

DO

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P518

Finance Committee - Agenda - 3/17/2021 - P519

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
519
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Section 01330 - Submittals Page 4 of 4
January 2021 3066.21

7. Applicable standards, such as ASTM or Federal Specification numbers;
8. Identification of deviations from Contract Documents; and
9. Identification of revisions on resubmittals.

19 RESUBMISSION REQUIREMENTS

A. CONTRACTOR shall make any and all corrections or changes in submittals
required by ENGINEER, and resubmit revised versions. Submittals shall not be
accepted until ENGINEER reviews and approves of revised versions.

B. Shop drawings:
1. Revise initial shop drawings and resubmit as requested by ENGINEER;
and
2. Indicate any changes that were made other than those requested by
ENGINEER.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION

Not used.

[END OF SECTION 01330]

P:\3000s\3066.21\ Source Files\Tech Specs\ Division 1 Specifications\01330 Submittals.docx

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P519

Finance Committee - Agenda - 3/17/2021 - P520

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
520
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

SECTION 01450

QUALITY CONTROL

PART 1 - GENERAL

1.1 GENERAL QUALITY CONTROL

A.

CONTRACTOR - shall maintain quality control over the _ suppliers,
manufacturers, products, services, site conditions, and workmanship to
produce Work of specified quality.

CONTRACTOR shall comply with industry standards except when more
restrictive tolerances or specified requirements indicate more rigid standards
or more precise workmanship.

CONTRACTOR shall account for quality control practices in his/her bid pricing
and schedule. No adjustments to the Contract price or schedule will be made
for CONTRACTOR’s failure to provide the requisite quality control.

12 OBSERVATION AND TESTING

A.

The Work shall, at all times, be subject to the observation of OWNER and/or
ENGINEER. Observation or non-observation of OWNER and/or ENGINEER
shall not relieve CONTRACTOR from his/her contractual obligation to furnish
work and material as required, and properly complete the Work in accordance
with the Drawings and Specifications. If OWNER or ENGINEER considers that
the Work is not properly accomplished, then he/she may condemn or reject all
or any part of the Work and any materials or equipment incorporated in it. If
any material, equipment, or work is condemned or rejected by OWNER or
ENGINEER, then CONTRACTOR shall bear all expenses for removal and proper
replacement of such material, equipment, or work, and replacing any Work by
others that is adversely affected by removal and proper replacement of
improper Work by CONTRACTOR.

OWNER shall retain ENGINEER to perform limited construction observation.
These services will be performed in accordance with the requirements of
governing authorities to establish whether the Work is completed in
accordance with the Drawings and Specifications.

CONTRACTOR shall cooperate with ENGINEER during all testing and sampling
activities and furnish tools, equipment, samples of materials, and assistance as
requested.

CONTRACTOR shall allow ENGINEER ample time and opportunity for observe

the materials used in the Work. CONTRACTOR shall advise ENGINEER
promptly upon placing orders for materials so that arrangements may be

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P520

Board Of Aldermen - Minutes - 9/26/2017 - P15

By dnadmin on Sun, 11/06/2022 - 21:54
Document Date
Tue, 09/26/2017 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 09/26/2017 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__092620…

Board of Aldermen — 9/26/17 Page 15

Alderman Siegel

I’m sensitive too to Alderman Lopez’s concerns, but | don’t think anything in the amended legislation precludes
that. | think the good sense of the Board President the Mayor going forward, they will appoint people to consider
that.

President McCarthy

Alderman Lopez, | would appreciate it if you would find for me the name of someone who fits that category who
you believe would be a proper appointee to the committee.

Alderman Lopez

| would be happy to do so.
Ordinance O-17-044 declared duly adopted as amended.
NEW BUSINESS — RESOLUTIONS

R-17-132
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderwoman Mary Ann Melizzi-Golja
RELATIVE TO THE ACCEPTANCE AND APPROPRIATION OF $78,273 FROM THE DEPARTMENT
OF HOMELAND SECURITY INTO FIRE GRANT ACTIVITY “FY2016 ASSISTANCE TO FIREFIGHTERS
GRANT”
Given its first reading; assigned to the HUMAN AFFAIRS COMMITTEE by President McCarthy

R-17-133
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderman Ben Clemons
Alderman Richard A. Dowd
Alderwoman Mary Ann Melizzi-Golja
Alderman-at-Large Michael B. O’Brien, Sr.
Alderman Tom Lopez
Alderman-at-Large Brian S. McCarthy
AUTHORIZING THE CITY TO ENTER INTO A MEMORANDUM OF UNDERSTANDING WITH THE
BOSTON SURFACE RAILROAD COMPANY, INC.
Given its first reading; assigned to the PLANNING & ECONOMIC DEVELOPMENT COMMITTEE by President
McCarthy

R-17-134
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderman-at-Large Michael B. O’Brien, Sr.
AUTHORIZING THE SALE OF LAND ON THE EAST SIDE OF MEDICAL CENTER DRIVE (SHEET
31, LOT 12) TO SOUTHERN NEW HAMPSHIRE MEDICAL CENTER FOR $300,000, ESTABLISHING
AN EXPENDABLE TRUST FUND FOR DOWNTOWN REDEVELOPMENT INITIATIVES, AND
APPROPRIATING THE $300,000 OF PROCEEDS INTO THE EXPENDABLE TRUST FUND
Given its first reading; assigned to the COMMITTEE ON INFRASTRUCTURE, the BUDGET REVIEW
COMMITTEE and the NASHUA CITY PLANNING BOARD by President McCarthy

Page Image
Board Of Aldermen - Minutes - 9/26/2017 - P15

Finance Committee - Agenda - 3/17/2021 - P521

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
521
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Section 01450 - Quality Control Page 2 of 2

January 2021

3066.21

made, if desired, for observation before shipment from the place of
manufacture. CONTRACTOR must anticipate that possible delays may occur
due to the necessity of materials being inspected and accepted for use.

1.3 SUBSTANDARD WORK OR MATERIALS

A.

Any defective or substandard Work or materials furnished by CONTRACTOR
that is discovered before the final acceptance of the Work, as established by
ENGINEER, or during the subsequent guarantee period, shall be removed
immediately by CONTRACTOR even if it had been initially overlooked by
ENGINEER and recommended for payment. Equipment or materials
condemned or rejected by ENGINEER shall be tagged as such and shall be
immediately removed from the site by CONTRACTOR. Satisfactory Work or
materials shall be substituted by CONTRACTOR for that rejected.

ENGINEER may order tests on substandard or damaged Work, equipment, or
materials to determine the required functional capability for possible
acceptance, if there is no other reason for rejection. The cost of such tests shall
be borne solely by CONTRACTOR and the nature, extent, and supervision of the
tests will be as determined by ENGINEER. If the results of the tests indicate
that the required functional capability of the Work, equipment, or material is
not impaired, consistent with the final general appearance of same, then the
Work, equipment, or materials may be deemed acceptable. If the results of
such tests reveal that the required functional capability of the questionable
Work or materials has been impaired, then such Work or materials shall be
deemed substandard and shall be replaced by CONTRACTOR at no additional
cost to OWNER. CONTRACTOR may elect to replace the substandard Work or
material in lieu of performing the tests.

Schedule adjustments will not be made for correcting substandard or damaged
Work.

PART 2 - PRODUCTS

Not used.

PART 3 - EXECUTION

Not used.

[END OF SECTION 01450]

P:\3000s\3066.21\Source Files\Tech Specs \ Division 1 Specifications\01450 Control.docx

SANBORN HEAD

Page Image
Finance Committee - Agenda - 3/17/2021 - P521

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3237
  • Page 3238
  • Page 3239
  • Page 3240
  • Current page 3241
  • Page 3242
  • Page 3243
  • Page 3244
  • Page 3245
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact