Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 27871 - 27880 of 38765

Finance Committee - Agenda - 6/6/2018 - P161

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
161
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 401

Paving operations shall not resume until the Engineer determines that material meeting the Contract requirements can be

produced. Corrective action will be considered acceptable by the Engineer if the pay factor for the failing property increases. If

it is determined that the resumption of production involves a significant change to the production process, the current lot will be

terminated and a new lot will begin.
3.17.3.6.3 Remeasure and Retest. All requests to the Engineer to remeasure and retest a sublot shall be in writing.

Method of Measurement

4.1 Asphalt pavement mixture will be measured by the ton to the nearest 0.1 ton, and in accordance with 109.01. Batch weights
will be permitted as a method of measurement only when the provisions of 3.8.3 are met, in which case, payment will be based
on the cumulative weight of all the batches. The quantity will be the weight used in the accepted pavement, and no deduction
will be made for the weight of asphalt binder or additives in the mixture.

4.1.1 Hot bituminous pavement, machine or hand method (night) will be measured in the same manner as 4.1. No separate
measurement will be made for lighting necessary or overtime required due to night operations at the plant or at the site.

4.1.2 Due to possible variations in the specific gravity of the aggregates, and to possible field changes in areas to be paved,
the quantity used may vary from the proposal quantities, and no adjustment in Contract unit price will be made because of such
variations.

4.2 Asphalt pavement, removed because of faulty workmanship or contamination by foreign materials, will not be included in
the pay quantity.
4.3 Blank,

4.4 Joint adhesive will be measured by the linear foot for each lift of pavement to be placed, to the nearest foot of adhesive
applied. Ifthe Contractor chooses to pave in echelon in lieu of using joint adhesive, payment for the length of joint eliminated
by the echelon paving will be made,

4.5 Echelon paving, when specified or approved, will be measured by the linear foot along the shared edge of the mats being
simultaneously placed.

Basis of Payment

5.1 All work performed and measured as prescribed above will be paid for at the Contract unit price as provided in the respective
sections for each type specified.

5.2 Tack coat material ordered under 3.10.10 will be paid as provided for in Section 410.
5.3. Blank.

5.4 Plant or project site lighting for hot bituminous pavement, machine or hand method (night), or overtime required due to
night operations will be subsidiary to the paving items.

5.5 Asphalt cement additives will be subsidiary to the paving items.

5.6 Implementation of the Quality Control Plan and costs associated with obtaining core samples for acceptance testing shall
be subsidiary. When items are to be accepted under Quality Assurance provisions, pay adjustment will be made in accordance
with 106.03.2.4 as specified below,

5.6.1 Gradation composite pay factor (CPF). The total price for each lot will be adjusted by a composite pay factor
(CPF) based on the gradation of the material after extraction using the pay factors for each sieve size and the sieve size weight
factors in Tables 401-11, lla & lib.

Table 401-11 - Sieve Size Weight Factors 1”

Property Weight Factor “ f”
1/2” 6
#30 4
Sa rome a
een Ail other sicves (each) arts

2016 NHDOT
Go To=> TOC Division 100 Division 200 Division 300 Division 400 Standard
Division 500 Division 800 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P161

Finance Committee - Agenda - 8/17/2022 - P177

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Fri, 08/12/2022 - 13:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2022 - 00:00
Page Number
177
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

{continued}

Assets

Cash and cash equivalents

Investments

Receivables, net of allowance for uncollectibles
Departmental and other
Intergovernmental
Loans

Due from other funds

Total Assets

Liabilities
Accounts payable
Accmued habilities
Uneamed revenue
Due to other funds

Total Liabiliies

Fund Balances
Nonspendable
Restricted
Committed
Unassigned

Total Fund Balance

Total Liabilities and Fund Balance

CITY OF NASHUA, NEW HAMPS HIRE

Combining Balance Sheet

Nonmajor Governmental Funds

June 30, 2021
Capital Project Funds
city City-wide
Technology Building Communications Hydroelectnce Police
Projects Projects Projecis Provecis Projects Subtotal
$ - $ - $ - $ - - $ -
5 5 5 = . 93,028
158,283 - 97,295 3,534,809 2,344,501 6,532,814
$158,283 = § - $97,295 $ 3,534,809 2,344,501 § 6,625,842
$ - £ - $ - $ - - $ -
: 685.614 . . . 11,652,353
- 685.614 - - - 11,652,353
158,283 - 97,295 3,534 809 2,344,501 10,610,638
- 32,976 - - - 420,333
- (718,590) = 7 - (16,057,482)
158,283 (685,614) 97,295 3,534,809 2,344,501 (5,026,511)
$158,283 $ . $ 97205 $3,534,809 2,344,501 3 6,625,842

169

Page Image
Finance Committee - Agenda - 8/17/2022 - P177

Finance Committee - Agenda - 6/6/2018 - P162

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
162
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 401

Table 401-119 - Sieve Size Weight Factors 3/4”

Property Weight Factor “ f”
3/8” 6
#30 4
Gradation (each sieve) #8, and #200sieves gs
Ai other Sieves (each)

Table 401-11b - Sieve Size Weight Factors 1/2” and 3/8”
Property Weight Factor “
fr’
No. 4
_Gradation (each sieve) "#8, and #200 sieves

All other sieves (each) SSS

tool Bin

[A (PR) + (PB )+.-f (PE)
af

Composite Pay Factor (CPF) =

5.6.2 Pay Adjustment. The pay adjustment for each measured characteristic will be determined by the following equation:
fi
>»

PA, = (PF, -D (QMP)

where: PA= Pay adjustment payment in dollars for each characteristic.
Pf = Pay factor or composite pay factor for each characteristic.
fo= Weight factor from Table 401-12 for each characteristic.
Sf = Sum of weight factors.
Q= Quantity computed from all accepted delivery records for the lot.
P= Contract unit price per ton.

Table 401-12 — Tier 1 Weight Factors

Measured Characteristic Weight Racton “i
.../ssphalt Binder Content OS. .
_InPlaceAirVoids 0.20
Thickness 0.08
Ride Smoothness 6.30

Table 401-13 — Tier 2 Weight Factors

Measured Characteristic Weight Factor “
Gradation 0.25
Asphalt Binder Content 0.25
InPlace Air Voids i its—CS~SS
2016 NHDOT
Go To=) TOC Division 100 Diyision200 Division 300 Division 400 Standard

Division 5300 Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P162

Finance Committee - Agenda - 6/6/2018 - P163

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
163
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 401

5.6.3 Pay adjustment, Hot Bituminous Pavement QC/QA Ttems. The pay adjustment for gradation, cross slope,
thickness, asphalt binder content, in place air voids, and ride quality (made up of the sum of all sublots) will be applied to item
1010.3. Pay adjustments may be applied at the end of each month based on all available test results for each lot.

5.7 The accepted quantity of joint adhesive of type specified will be paid for at the Contract unit price per linear foot complete
in place.

5.7.1 Recoating of the joint, as described in 3.13.5, shall be at the Contractor’s expense.

5.7.2. When echelon paving is used in lieu of joint adhesive and the item is not included in the contract, the accepted quantity
will be paid for at the price of joint adhesive under Item 403.65.

5.8 The Material Transfer Vehicle (MTV) Item will be paid for at the Item Bid Price per ton for the tons of bituminous mixture
actually transferred by the MTV.

5.9 The accepted quantity of echelon paving will be paid for at the Contract unit price per linear foot complete.

5.9.1 If the Contractor chooses to pave in echelon in lieu of pavement joint adhesive, and the item is not in the contract,
echelon paving will be paid as stated in 5.7.

2016 NHDOT
Go To=> TOC Division 100 Division 200 Division 300 Division 406 Standard
Division 500 Division 600 Division 70) Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P163

Finance Committee - Agenda - 6/6/2018 - P164

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
164
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 401
Appendix A

NHDOT Test Procedure B-7

Sampling Bituminous Paving Mixtures For Acceptance Testing

Sample shall be taken behind the paver after placement and before compaction.
Sample location is randomly selected by the Contract Administrator.

When paving over aggregate base course or cold planed surface, use a rectangular metal plate no less than 12” each side.
Center plate on sample location.

After paver passes over plate, measure back to sample location.
Locate the edges of the plate.

Using a flat-bottomed scoop large enough to obtain up to a 3000 gram sample. Place scoop on plate and push across the mat
(perpendicular to the center line), through the center of the plate, filling the scoop to obtain the sample size specified below.

Required Sample Size

Base Courses 2000-3000 grams

~ Binder Courses ~~ 1500-3000 grams

~ Surface Courses ~~ 1000-3000 grams"

“Sand Courses ———~*~S~=«S 00-3000 grams

When sampling over an existing pavement the plate is not required.

NHDOT Procedure B-8

Sampling and Testing
Procedure for In Place Air Voids

Cores will be taken at random locations selected by the Contract Administrator.

Cores will be delivered intact by the Contractor to the NHDOT inspector at the testing laboratory.
If Cores are lost or damaged, new cores shall be taken at the same location as the previous core.
Cores shall be measured for thickness following ASTM D 3549.

Bulk specific gravity shall be determined by AASHTO T 166a.

Maximum Theoretical Density will be determined using the core by AASHTO T 209.

In Place Air Voids shall be determined by AASHTO T 2.

2016 NHDOT

Go To=) TOC Division 100 Division 200 Division 300 Division 400 Standard
Division 300 = Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P164

Finance Committee - Agenda - 6/6/2018 - P165

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
165
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 403

SECTION 403 -- HOT BITUMINOUS PAVEMENT

Description

1.1. This work shall consist of constructing one or more courses of bituminous pavement on a prepared base as shown on the
plans or as ordered. The methods may be classified as hand or machine.

1.1.1. Hand method shall include only the paving of raised islands, slopes, cattle passes, areas between rails at railroad
crossings, existing sidewalks, drives, drive aprons, curb patch between concrete barrier and pavement, curb patch between granite
curb and pavement, and paving of 50 tons or less added after the completion of paving operations.

1.1.2 Machine method shall include all paving not classified as hand method.

1.2. When specified this work shall consist of constructing one or more courses of hot bituminous pavement using modifier to
create higher strength.

1.3. This work shall consist of constructing bituminous pavement under nighttime operation and will be indicated in the item
description. The location shall be as shown on the plan or as ordered.

Materials
2.1 Materials and their use shall conform to the requirements of 401.2.

2.2. Temporary bituminous pavement shall conform to Table 401-1. Thickness shall be as shown on the plans or as ordered by
the Engineer.

Construction Requirements
3.1 Construction requirements shall be as prescribed in 401.3.
3.2 For temporary pavement only, amend portions of 401.3.12 as follows:

3.2.1 The requirements of 401.3.12.2.1 shall apply except rolling may be accomplished with a dual vibrating steel drum
roller.

3.2.2 Delete 401.3.12.3.
3.3 For temporary bituminous pavement only delete 401.3.13.7.
3.4 Temporary bituminous pavement shall be removed when no longer needed.

Methods of Measurement
4.1 Hot bituminous pavement will be measured as prescribed in 401.4.

4.1.1 Hot bituminous pavement, machine or hand method (night) will be measured in the same manner as 4.1. No separate
measurement will be made for lighting necessary at the plant or at the site Hot Bituminous pavement transferred by the Material
Transfer Vehicle (MTV) will be measured as prescribed in 401.4.

Basis of Payment
5.1 The accepted quantities of hot bituminous pavement will be paid for at the Item Bid Price per ton for the bituminous mixture,
complete in place.

5.1.1 The accepted quantity of hot bituminous pavement, machine or hand method (night) will be paid for at the Contract
unit price per ton complete in place.

5.1.2 No separate payment will be made for any costs of plant or project lighting, or overtime for night work needed due to
night operations.

5.2 Bridge wearing course will be paid under machine method.
5.3. The accepted quantity of temporary bituminous pavement will be paid for at the Contract unit price per ton complete.

5.3.1 Removal of the temporary pavement will not be paid for under other items of the Contract but will be subsidiary.

2016 NHDOT
Go To =) TOC Division 100 Division 200 Division 300 Division 400 Standard
Division 500 = Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P165

Finance Committee - Agenda - 6/6/2018 - P166

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
166
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 403

Pay items and units:

403.11 Hot Bituminous Pavement, Machine Method Ton
| 403.119 Hot Bituminous Pavement, Machine Method, High Strength Ton |

403.12 Hot Bituminous Pavement, Hand Method Ton
403.351 Hot Bituminous Pavement, Aggregate 35 percent Wear, Ton

Machine Method
403.352 Hot Bituminous Pavement, Aggregate 35 percent Wear, Hand = Ton

Method
403.4 Material Transfer Vehicle (MTV) Ton
403.6 Pavement Joint Adhesive Linear Foot
403.61 Pavement Joint Adhesive (Bridge Base) Linear Foot
403.65 Echelon Paving Linear Foot
403.911 Hot Bituminous Bridge Pavement, 1” Base Course Ton
403.9115 Hot Bituminous Bridge Pavement, 1” Base Course, Aggregate Ton

50 Percent Wear
403.98 Hot Bituminous Concrete Leveling, Machine Method Ton
403.99 Temporary Bituminous Pavement Ton
403. XXXX1 Hot Bituminous Pavement, (QC/QA Tier 1) Ton
403.XXXX2 Hot Bituminous Pavement, (QC/QA Tier 2) Ton
403. XXXOX Hot Bituminous Pavement, (Night) Ton
1010.3 Quality Control/Quality Assurance (QC/QA) for Asphalt Dollar

2016 NHDOCT
GoTo=> TOC Division 100 Division 200 Division 300 Division 400 Standard

Division 500 Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P166

Finance Committee - Agenda - 6/6/2018 - P167

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
167
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 410
SECTION 410 -- BITUMINOUS SURFACE TREATMENT

Description
Materials

Construction Requirements
3.2 Equipment.
3.3 Preparation of Surface to be Treated.
3.4 Application of Bituminous Material.
3.5 Seal Coat.
3.6 Finished Appearance.

Method of Measurement

Basis of Payment
Description

1.1 This work shall consist of preparing and applying one or more seal coats of bituminous material to a gravel or stone course.
This work shall also consist of a tack coat applied to a bituminous concrete surface or a Portland cement concrete surface.

Materials
2.1 Bituminous material shall be the type and grade specified or ordered and shall conform to the requirements of Section 702.

2.2 Blotter material shall be natural sand composed of hard, durable particles, free from loam, showing uniform resistance to
abrasion. Gradation shall conform to Table 520-2.

Construction Requirements

3.1 Limitations. Bituminous material shall not be applied on a wet surface, or when weather conditions would prevent the proper
application and curing of the coat. The quantities, rate of application, temperatures, and areas to be treated shall be approved before
application of bituminous material.

3.2 Equipment.
Equipment required for this work shall be as follows:

(a) A distributor shall be so designed, equipped, maintained, and operated such that bituminous material at even heat may be
applied uniformly on variable widths of surface up to 12 ft, at readily determined and controlled rates from 0.02 to 2.0
gal/yd?, with uniform pressure, and with an allowable variation from any specified rate not to exceed 0.02 gal. Distributor
equipment shall include a tachometer, pressure gauges, accurate volume measuring devices or a calibrated tank, and a
thermometer for measuring temperatures of tank contents. Distributors shall be equipped with a power unit for the pump
and with full circulation spray bars adjustable laterally and vertically. The spray bar shall contain spray nozzles providing
a fan-shaped spray pattern adjusted so the vertical axis is perpendicular to the pavement surface. The spray pattern and
spray bar height shall be adjusted to provide a uniform application of the tack coat without double coverage. The
distributor shall be equipped with a mechanical device to adjust the spray height as material is discharged to keep a
uniform height above the pavement for full coverage without overlapping. The distributor shall also be equipped with a
hand-held spray attachment for applying the material to areas inaccessible to spray bars and to fill in irregular areas to
provide full coverage. Approved sampling valves shall be installed in distributors and transport tank trucks to permit
taking representative samples of the contents. The recommended location of the sampling valve is in the rear bulkhead of
the tank roughly one-third of the height above the bottom. The inlet pipe shall project into the contained liquid as shown
in AASHTO T 40. At least 1 qt of material shall be drained off through the sampling valve and discarded before the
desired sample is taken. New sample containers will be furnished by the Engineer. To prevent the loss of solvents,
containers shall be sealed with a tight fitting cover immediately after being filled.

(b) A rotary power broom for sweeping treated surface.

(c) A steel-wheeled roller.

(d) A self-propelled pneumatic-tired roller.

{e) A sand spreader capable of spreading blotter material in sufficient quantity to prevent traffic pickup of the applied
bituminous material.

(f) A steel-brush drag of an approved type.

3.3 Preparation of Surface to be Treated.

3.3.1 Tack coat. The existing surface shall be patched and shall be free of irregularities to provide a reasonably smooth and
uniform surface to receive the treatment. Unstable corrugated areas shall be removed and replaced with suitable patching materials.

2016 NHDOT
Go To=) TOC Division 100 Division 200 Division 300 Division 400 Standard
Division 500 = Division 600 = Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P167

Finance Committee - Agenda - 6/6/2018 - P168

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
168
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 410

The edges of existing pavements that are to be adjacent to new pavement shall be cleaned to permit the adhesion of bituminous
materials.

3.4 Application of Bituminous Material.

3.4.1 Tack coat. Bituminous material shall be uniformly applied with an approved applicator. When ordered, a pressure
distributor shall be used. The tack coat shall be applied in such a manner as to offer the least inconvenience to traffic and to permit
one-way traffic without pickup or tracking of the bituminous material.

3.4.1.1 A tack coat shall be applied immediately prior to placement of pavement. The rate of application of emulsified asphalt
shall be between 0.02 and 0.08 gal/yd’, based on the application table below. The Engineer may further modify the rate depending
on the relative absorbance and texture of the pavement surface.

ae . Lop
Existing Pavement Condition Appucation Kate tniGallye

Sos OF
Gadized EMA 84 006
Milled HMA 0.04 — 0.08

3.5 Seal Coat.
3.5.1 When directed, a seal coat shall be applied at the rate in gallons per square yard specified on the plans or as ordered.

3.5.1.1 Bituminous material shall be applied to the width of the section to be sealed by means of a pressure distributor in a
uniform, continuous spread. When traffic is maintained, not more than one half of the width of the section shall be treated in one
application. Care shall be taken that the application of bituminous material at junctions is not in excess of the specified amount.
Excess material shall be squeegeed from the surface. Skipped areas or deficiencies shall be corrected.

3.5.1.2 When traffic is maintained, one-way traffic shall be permitted on the untreated portion of the roadbed. As soon as the
bituminous material has been absorbed by the surface and no longer picks up, traffic shall be transferred to the treated portion, and
the remaining width of the section shall be sealed.

3.5.2 Blotter material at the rate ordered shail be applied before the bitumen has set; the entire treated surface shall be dragged,
rolled and maintained. The remaining blotter material shall be removed.

3.6 Finished Appearance.

3.6.1 Any bituminous material splashed or sprayed onto exposed surfaces of curbs, sidewalks, or other masonry structures shall
be removed by sandblasting at the Contractor's expense.

Method of Measurement
4.1 Bituminous surface treatment will be measured by the ton, in accordance with 109.01, to the nearest 0.1 ton.

4.1.1 Blotter material furnished will be subsidiary.
4,2 Asphalt emulsion for tack coat will be measured by the gallon, in accordance with 109.01, to the nearest gallon.

4.2.1. The measurement will be based on a calibrated meter mounted on the distribution vehicle or calibrated tank chart. The
meter shall be calibrated at least twice per year. Measurement will be at the delivered temperature (no adjustment).

Basis of Payment
5.1 The accepted quantities of bituminous surface treatment will be paid for at the Item Bid Price per ton for bituminous material,
complete in place.

5.2 The accepted quantities of asphalt emulsion for tack coat will be paid at the Item Bid price per gallon, complete in place.
5.2.1 Emulsified asphalt for tack coat required under 401.3.10.10 will not be subject to price adjustment.

5.3 Payment for patching existing pavements under 3.3.1 will be made at the contract unit price for Item 403.11 or 411.1, as
ordered.

Pay items and units:

410.22 Asphalt Emulsion for Tack Coat Gallon
410.31 Asphalt Surface Treatment Including Blotter Material Ton
410.41 Emulsified Surface Treatment Including Blotter Material Ton
2016 NHDOT
GoTo=% TOC Division 100 Division 200 Division 300 Division 400 Standard

Division 500 Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P168

Finance Committee - Agenda - 6/6/2018 - P169

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
169
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 411

SECTION 411 -- PLANT MIX SURFACE TREATMENT
Description
L.1 This work shall consist of a leveling course when ordered and one or more courses of bituminous mixture constructed on an

existing pavement.

1.2 This work when specified shall consist of a dual purpose single course bituminous mixture which acts as a shim course and
a wearing course constructed on an existing pavement.

Materials
2,1 Materials and their use shall conform to the requirements of 401.2 as amended below:

2.1.1 Asphalt binder PG grade to be used for a particular project will be specified in a Special Provision contained in the
Proposal.

2.1.2 Unless a volumetric mix design has been performed by the Contractor, the composition of the mixtures shall conform
to historical gradation and binder content. Leveling course, AC Paver Shim, Paver Spot Drag Shim, and 3/4” PMST shall be Type
H unless otherwise noted.

Table 411-1 - Composition of Mixtures - Master Ranges
Plant Mixed Surface Treatment

Type H
3/8”
- . Sees to Percentage by Weight Passing -
3/8” ot
No. 4 fe
NO :
- __No. 30 _
No. 50
No. 100
No. 200 0
oe . _ ae “Percentage of Total Mix, _
Asphalt Cement 6.25. | 6.7 7.25

2.1.3 Blotter materials shall be sand conforming to the requirements of Table 411-2.

Table 411-2 -- Blotter Material

_Sieve Size Percentby Weight Passing
100

Construction Requirements
3.1 Mixing plants shall be as prescribed in 401.3.1.

3.2 Mixing and storage shall conform to 401.3.1.6.11, 401.3.6, and 401.3.7 with the following modifications:

3.2.1 If the aggregate contains sufficient moisture to cause foaming in the mixture, it shall be removed from the bins. The
quantity of cold aggregate fed to the dryer shall be governed by the ability of the dryer to remove the moisture completely from
the aggregate, as determined by the Engineer.

3.3. Weighing and hauling shall conform to 401.3.8.

2016 NHDOT
Go To=) TOC Division 100 Division 200 Division 300 Division 400 Standard
Division 500 = Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P169

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2784
  • Page 2785
  • Page 2786
  • Page 2787
  • Current page 2788
  • Page 2789
  • Page 2790
  • Page 2791
  • Page 2792
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact