Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/6/2018 - P162

Finance Committee - Agenda - 6/6/2018 - P162

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
162
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 401

Table 401-119 - Sieve Size Weight Factors 3/4”

Property Weight Factor “ f”
3/8” 6
#30 4
Gradation (each sieve) #8, and #200sieves gs
Ai other Sieves (each)

Table 401-11b - Sieve Size Weight Factors 1/2” and 3/8”
Property Weight Factor “
fr’
No. 4
_Gradation (each sieve) "#8, and #200 sieves

All other sieves (each) SSS

tool Bin

[A (PR) + (PB )+.-f (PE)
af

Composite Pay Factor (CPF) =

5.6.2 Pay Adjustment. The pay adjustment for each measured characteristic will be determined by the following equation:
fi
>»

PA, = (PF, -D (QMP)

where: PA= Pay adjustment payment in dollars for each characteristic.
Pf = Pay factor or composite pay factor for each characteristic.
fo= Weight factor from Table 401-12 for each characteristic.
Sf = Sum of weight factors.
Q= Quantity computed from all accepted delivery records for the lot.
P= Contract unit price per ton.

Table 401-12 — Tier 1 Weight Factors

Measured Characteristic Weight Racton “i
.../ssphalt Binder Content OS. .
_InPlaceAirVoids 0.20
Thickness 0.08
Ride Smoothness 6.30

Table 401-13 — Tier 2 Weight Factors

Measured Characteristic Weight Factor “
Gradation 0.25
Asphalt Binder Content 0.25
InPlace Air Voids i its—CS~SS
2016 NHDOT
Go To=) TOC Division 100 Diyision200 Division 300 Division 400 Standard

Division 5300 Division 600 Division 700 Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P162

Footer menu

  • Contact