Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/6/2018 - P163

Finance Committee - Agenda - 6/6/2018 - P163

By dnadmin on Mon, 11/07/2022 - 11:37
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
163
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

SECTION 401

5.6.3 Pay adjustment, Hot Bituminous Pavement QC/QA Ttems. The pay adjustment for gradation, cross slope,
thickness, asphalt binder content, in place air voids, and ride quality (made up of the sum of all sublots) will be applied to item
1010.3. Pay adjustments may be applied at the end of each month based on all available test results for each lot.

5.7 The accepted quantity of joint adhesive of type specified will be paid for at the Contract unit price per linear foot complete
in place.

5.7.1 Recoating of the joint, as described in 3.13.5, shall be at the Contractor’s expense.

5.7.2. When echelon paving is used in lieu of joint adhesive and the item is not included in the contract, the accepted quantity
will be paid for at the price of joint adhesive under Item 403.65.

5.8 The Material Transfer Vehicle (MTV) Item will be paid for at the Item Bid Price per ton for the tons of bituminous mixture
actually transferred by the MTV.

5.9 The accepted quantity of echelon paving will be paid for at the Contract unit price per linear foot complete.

5.9.1 If the Contractor chooses to pave in echelon in lieu of pavement joint adhesive, and the item is not in the contract,
echelon paving will be paid as stated in 5.7.

2016 NHDOT
Go To=> TOC Division 100 Division 200 Division 300 Division 406 Standard
Division 500 Division 600 Division 70) Specifications

Page Image
Finance Committee - Agenda - 6/6/2018 - P163

Footer menu

  • Contact