Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 24631 - 24640 of 38765

Finance Committee - Agenda - 5/6/2020 - P81

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
81
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

Doc #: 5
Ref. Document:

PROJECT NAME: Date: 23-Dec-19
Nashua Primary Tank Upgrades

PROJECT NO: 181016
PHASE
COST SUMMARY SHEET
Weirs Altachement
A iC Labor (Recap Sheet): $20,256.51
B Mc Materials, & Equipment (Recap Sheet): $6,590.20
Cc RIC Fee (A x 15%) + (B x 15%): $4,027.01
D Subtotal MC Work (A +B+4C): | $ 30,873.72
E Total Subcontractors (Below): $741,006.00
F MC Mark-up on Subcontractor Work (5%, 7.5% or 10%): | $ 956.52
G Bond (1%) and General Liability (1%): $716.12
H DEDUCT SOV FOR GT WEIRS DENIO (SEE ATTACHED) (37,024.01)
Total Proposal (D+E+F+G): § 36,522.35
SUBCONTRACTOR SUMMARY
Subcontractor Description Amount
JB Safety International Sandblast & paint weirs for 2 GT $ 711,000.00

A | tA tal oa fee |
E

Total Subcontractors: 11,006.00

Page Image
Finance Committee - Agenda - 5/6/2020 - P81

Finance Committee - Agenda - 5/6/2020 - P82

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

Weirs Aftachement

Scope: Proposal for change of material requirements for FRP weir plates, as well as installation and recoating of existing weirs: Set up staging and drii aproximately (84)
3/8” holes in existing weirs. Assist Painters bring in blast media and removing blast media and disposal.

Gasket: * Addition of 3/8" thick x 6" wide 46 durometer Shore A neoprene rubber to be mounted between
new FRP weir and existing aluminum weir, 1 month for 2 Tanks- Set up staging, clearing debris, surface prep for painters, drilling wiers, site clean up afer painting,

1-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL
$77.34 187.20
LABORER 7 $8 .60
72 $0.00
OPERAT! $72.17 00
PLUMBER .69 .!
$56.06 .00
P ‘4. .00
MILLWRIGHT $69.72 .!
30.00
TRUCK DRIVER 00
BTOTAL $15,116.86
2-MATERIALS
DESCRIPTION QTY UNIT UNIT COST SUBTOTAL
Estimated
FFE 3/8" thick x 6" wide duramete 1 2,700,00 § 2,700.00 $ 2,700.00
Durnpsier / Disposal 1 455.00 $ 455.00 $ 455.06
_Drill Bits # Consumabies 1 125.00 § 125.00 $ 125.06
SUBTOTAL $ 3,286.00
3-EQUIPMENT
CATEGORY HRS RATE UNIF SUBTOTAL
IEXCAVATOR PG300 $180.35 HR $0.00:
EXCAVATOR CAT 330 $100.37 : HR $0.00:
EXCAVATOR CAT 320 $58.71: HR $0.00
DUMP TRUCK $61.23 HR 30,00;
TOOL TRUCK 80.0 317.00 © HR $1,360.00
FRONT END LOADER $66.40 HR 30,00
BOZER $54.42 | HR $0.00
COMPACTOR (WALK BEHIND) $36.88 | HR $6.00
ROAD SAW $35.88 ; KR $0.00
HYDRAULIC BREAKER $45.51 | HR $6.00
CAT 420 BACKHOE 341.49 : HR $0.06
STAGING 20 $30.01 | HR $600.20
COMPRESSOR 185CFM $15.08 | HR $0.00
SISSOR LIFT 19" $4.18 | HR $0.00
MAG DRILL 40 $120.00 | DAY 31,200.06
SUBTOTAL $3,160.20
Page 2 of 4 3/5/2020 - 12:53 AM

Page Image
Finance Committee - Agenda - 5/6/2020 - P82

Finance Committee - Agenda - 5/6/2020 - P83

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

Weirs Attachament

Scope: Proposal for change of material requirements for FRP weir plates, as well as installation and reccating of existing weirs: Set up sfaging and drill aproximately (84)

3/8" holes in existing weirs, Assist Painters bring in blast media and removing blast media and disposai,
Gasket: * Addition of 3/8" thick x 6" wide 40 durometer Shore A neoprene rubber to be mounted between

new FRP weir and existing aluminum weir. 1 month for 2 Tanks- Set up staging, clearing debris, surface prep for painters, drilling wiers, site clean up after painting.

9-TOTAL (item 8 + Bond + General Liability)
| updated to reflect the credited items

4-SUPPLEMENTAL COSTS
DESCRIPTION QTy RATE UNIT SUBTOTAL
LASBUILT DRAWINGS i $0.00:
WARRANTIES i $0.00;
TESTING $0.00:
$0.00
.00
TRAVEL $0.00
$0.00
STORAGE $0.00
$0.00
FUEL .00
TELEPHONE .00
$150
SUBTOTAL $150.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $5,139.71
6-GC WORK TOTAL
SUBTOTAL (item 1+2+9+4) $26,846.71
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST QTy cosT TOTAL
International LS 11,006.00 11,000.06
SUBTOTAL $71,000.00
GC MARKUP (typically 10%) x (Subcontractor cosi/7.15} $956.52
B-FEE
GC (15% X Items 185 + 15% X items 28384 + 5%, 7.5% or 70% X Item 7) $4,983.53
B-SUBTOTAL $42,830.24
BOND (1% X Ifem8) $358.06
GENERAL LIABILITY (1% X Iter 8) $358.06

$43,546.36

Page 3 of 4

3/5/2020 - 11:53 AM

Page Image
Finance Committee - Agenda - 5/6/2020 - P83

Finance Committee - Agenda - 5/6/2020 - P84

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

COST SUMMARY SHEET

Scope: Omit original scope of removing all the old weirs from existing Gravily Thickeners.

CATEGORY RATE

BURDEN RATE 34.00%

1-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL
SUPERINTENDENT $0.00
FOREMAN $0.00
LABORER 80 $55.81 ($4,464.80)
SUBTOTAL ($4,464.80)
15% MARKUP ($669.72)
SUBTOTAL WITH 15% MARKUP ($5,134.52)
2-MATERIALS
DESCRIPTION QTY UNIT UNITCOST SUBTOTAL
Estimated
Consumables- Saw B 1 $ (125.00) $ (125.00)
$ -
$ -
$ -
$ -
3 -
SUBTOTAL $ (125.00)
15% MARKUP $ (18.75)
SUBTOTAL WITH 5% MARKUP $ 143.75
3-EQUIPMENT
CATEGORY HRS RATE UNIT SUBTOTAL
‘PICK-UP TRUCK 0.0 | HR $0.00:
SUBTOTAL $0.00
15% MARKUP $0.00
SUBTOTAL WITH 15% MARKUP $ -
5-BURDEN

($1,745.74)

Page Image
Finance Committee - Agenda - 5/6/2020 - P84

Finance Committee - Agenda - 5/6/2020 - P85

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

PCO #005

Methuen Construction Co., Inc. Project; 187016 - Nashua Primary Tank Upgrades
144 Main Street - PO Box 980 2 Sawmill Road
Plaistow, New Hampshire 03865 Nashua, New Hampshire 03060

Phone: (603) 328-2222

Prime Contract Potential Change Order #005: Weirs & Baffles

TO: City of Nashua FROM: Mefhuen Construction Ca., Inc.
229 Main Street 144 Main Street PO Box 980
Nashua New Hampshire, 03060 Plaistow New Hampshire, 03865

36 NUMBERIREVISION. ww o0s70 ince eee inn =P i tented inane atin ver mma ete ta ne

CONTRACT: | GS-330158-30 NASHUA PO 147380 - Nashua
Primary Tank Upgrades Prime Contract

Kelly Rochford (Methuen Construction Co.,

REQUEST RECEIVED FROM: Joseph White (Methuen Construction Co, CREATED BY:

Inc.) Ine.)

STATUS: Pending - In Review CREATED DATE: 12/4/2019

REFERENCE: —_ “DATESENT ssiai‘SOS™S~™

FIELDGHANGE: = No PRIME GONTRACT None .
CHANGE ORDER:

LOCATION:

SCHEDULE IMPACT: ACCOUNTING “Amount Based eee
METHOD:

PAID IN FULL: _ No TOTAL AMOUNT: $38,867.56 _ oe

Methuen Construction (MC), hereby submits this PCO in accordance with the documentation referenced herein. It is expressly understood and agreed
that this proposal is valid for the time as specified within this dacument from the date of the PCO. The Proposal is based upon current day construction
costs and does not include escalation costs for any material items that are either volatile or market sensitive. This Proposal does not include overtime
acceleration or expediting costs. This proposal does not include the costs associated with out of sequence construction, interference, impact related
delays and disruptions. MC reserves its rights under the agreement to seek additional time, indirect and impact costs associated with the PCO, once the
impacts can be fully evaluated, This proposal is submitted based on the understanding that it is exempt from WBE/MBE participation requirements and
accepiance of this proposal waives the participation requirements associated with this adelitional work.

POTENTIAL CHANGE ORDER TITLE: Weirs & Baffles
CHANGE REASON: No Change Reason

POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract is Changed As Folfows)
CE #10 - PCO 005 Weirs & Baffles

Proposal for change of material requirements for FRP weir plates, as well as installation and recoating of existing weirs: Gasket: * Addition of 3/8" thick x
6" wide 40 durometer Shore A neoprene rubber to be mounted between new FRP weir and existing aluminum weir. 1 month for 2 Tanks- Set up staging,
clearing debris, surface prep for painters, drilling wiers, site clean up after painting.

ATTACHMENTS:
181016-PCO#S Weis & Baffles-$38,867.56.paf_

Methuen Construction Co., Inc. page 1 of 2 Printed On: 12/4/2019 08 :48 PM

Page Image
Finance Committee - Agenda - 5/6/2020 - P85

Finance Committee - Agenda - 5/6/2020 - P86

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

Quote Name 012266-Nashua, NH CO #1
Created Date 8/26/2019
Expiration Date 40/31/2019

Company Address 964 Douglas Pike
Smithfield, RI 02917

Phone (401) 231-3552

Website www. fibfab.com
Prepared By Tim Streuli Quote To Name Anthony Crespo, Methuen Construction
Phone (401) 231-3552 Email acrespo@methuenincustrial.com
Email istreuli@ fibfab.com

Project Name Nashua, NH Primary Tank Upgrade Project Lacation Nashua, NH

Proposal for change of material requirements for FRP weir plates:

Gasket:

* Addition of 3/8" thick x 6" wide 40 durometer Shore A neoprene rubber to be mounted between
new FRP weir and existing aluminum weir.

* Gasket was not detailed in contract drawings or mentioned in the specification and has been
requested by the project engineer after the purchase contract has been executed. i

i

* The engineer’ i As this product i ity available, FF
@ engineer's request lists 30 durometer neoprene this product is not readily available, FFI $2,700.00 4.00 , $2,700.00

Misc. proposes 40 durometer neoprene

Fasteners:

* Addition of fasteners due to the project engineer's request to decrease the spacing between
fasieners from 24" to 12". i
* As 24" is the industry standard for weir plates on a round tank, this increases the number of i
fasteners required by 100%

Grand Total $2,700.06

PE Stamp not included in quotation

** Price good for sixty (60} days from issue.

** Quoted price is for changes to required material/products for previious purchase order.
™ Freight is included in quote.

** Terms - Net 30 days.
By : tulheony Cane, Ge.

Anthony Capo. Ji.
(acapo@fibfab. cont)

Page Image
Finance Committee - Agenda - 5/6/2020 - P86

Finance Committee - Agenda - 5/6/2020 - P87

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

: Consulting

Safety Audits

Safety Training

Safety Products
Experiential Training
Miabile Health Services
Environmental Services

“Leading Safety Beyond the 21st Century”

November 26, 2019

Methuen Construction
Anthony Crespo
Project Engineer

144 Main Street
Plaistow, NH 03865

RE: COATING REPAIR FOR WEIRS PRIMARY TANK NASHUA NH

Anthony,

Thank you for giving us the opportunity to quote your coating repair project. We are committed to
providing our customers with the highest quality, safety and environmentally conscious field installation
projects available in the professional coatings industry and we look forward to performing the scope of
work for you.

Project address:
Nashua Waste Water
2 Saw Mill Rd
Nashua, NH 03063

JB Safety International, inc. ¢ P.O. Box 476 @ Seguin, TX 78156 # 281-857-7919 sjefi@jbsaietyintl.com
http://www. jbsafetyintl.com

Page Image
Finance Committee - Agenda - 5/6/2020 - P87

Finance Committee - Agenda - 5/6/2020 - P88

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

We are pleased to provide you with our proposal including the following sections:

Seciion I:

Section Il:
Section Hl:
Section IV:
Section V:
Section VI:

Section VII:

Section VIII:

Section IX:
Section X:
Section XI:

Section Xl:

Scope of Work

Surface Preparation

Material Application

Health, Safety and Environment
Quality Control and Assurance
Schedule

Clarifications and Requiremenis
Insurance

Pricing

Terms & Conditions

Warranty

Acceptance

Section I: Scope of Work

Prepare by mechanical blasting and coat with Sherwin Williams coatings system 163 ft of weirs of the
Primary Tank for the city of Nashua waste water project.

A. Protect all surface not being coated

B. Clean to SSPC SP 10

C. Prime and coat with 3coat system as per specs.

D. Provide inspection report.

E. Return area to broom clean condition.

418 Safety International, Inc. @ P.O. Box 476 @ Seguin, TX 78156 ¢ 281-857-7919 ¢jeff@jbsafetyintl.com
http://www _jbsafetyintl.com

Page |2

Page Image
Finance Committee - Agenda - 5/6/2020 - P88

Finance Committee - Agenda - 5/6/2020 - P89

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

F. Owner to supply waste removal.
G. Owner to supply scaffolding.

H. Area to be free of materials, equipment and other obstacles. To be moved by owner.

Section Hl: Surface Preparation

Prepare surfaces in a professional! manner so as to produce finish work of a quality appearance and
durability. Abide by standards set forth by SSPC-Society of Protective Coatings and Painting & Decorating
Contractors of America.

Prepare all surfaces as needed to an SSPC- SP 10.

The inspection parameters for the surface preparation shall be in accordance with The Society of
Protective Coatings (SSPC), SSPC 05-03, Surface Preparation Specifications and Practices, SSPC VIS 3, Guide
and Reference Photographs for Steel Surfaces Prepared by Power and Hand Tool! Cleaning.

e Clean areas to SSPC SP 10.
e Solvent Cleaning to SSPC SP-1 as applicable.

e Protect adjacent surfaces, from paint drips or spatter.

SOCIETY OF PROTECTIVE COATINGS (SSPC} SURFACE PREPARATION STANDARDS

Bayes (J No {5P-1) Solvent Cleaning: Removal of oil, grease, dirt, soil, salts, and contaminants by cleaning with solvent, vapor, alkali,
emulsion, or stearn.

Ex}ves [[] No {$P-2) Hand Tool Cleaning: Removal of loose rust, loose mill scale, and loose paint to degree specified by hand chipping,
scraping, sanding, and wire brushing.

Elves [1] No (SP-3) Power Tocl Cleaning: Removal of loose rust, loose mill scale, and loose paint to a degree specified by too! chipping,
scraping, sanding, and wire brushing.

JB Safety international, Inc. ¢ P.O. Box 476 # Seguin, TX 78156 ¢ 281-857-7919 ¢jeff@jbsafetyintl.com
http-/Awww jbsafetyintl.com

Page |3

Page Image
Finance Committee - Agenda - 5/6/2020 - P89

Finance Committee - Agenda - 5/6/2020 - P90

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
90
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

LDYes EE} No {5®-5) White Metal &last Cleaning: Removal of all visible rust, mill scale, paint and foreign matter by blast cleaning by
wheel or nozzle (dry or wet) using sand, grit, or shot for very corrosive atmospheres where high cost of cleaning is
warranted,

LCves J No {5?-6) Commercial Blast Cleaning: Slast cleaning until at least two-thirds of the surface area is free of all visible residues
or rather severe conditions of exposure.

[ves EX No (SP-7) Brush Off Blast Cleaning: Blast cleaning of all surface area excent tightly adhering residues of miil scale, rust, and
coatings, exposing numerous, evenly distributed flecks of underlying metal.

Paves (] No (SP-10} Near White Blast Cleaning: Blast cleaning nearly te White Metal cleanliness, untif at least 95% of the surface area
is free of alf vistble residues for high humidity, chemical atmosphere, marine, or other corrosive environments.

LJves Ex} No (SP-13} Power Cleaning to Bare concrete: Complete removai of all scale, and paint by power tools with resultant surface
profile.

Section lil: Material Application

Apply high quality prefessional high-performance coating materials. Apply materials evenly and free from
defects, so as to produce finish work of a quality appearance and durability.

Materials: All Technical Data Sheets and SDS Sheets will be provided to customer upon request.

AS PER SPECIFICATIONS FEDERAL SPECIFICATIONS.

Note: All of the above coating systems are high-performance coating systems. Final choice of product will
be dependent on availability, job site restrictions and availability of products.

The inspection parameters for the application of each coat shall be in accordance with SSPC PA-2,
Measurement of Dry Coating Thickness with Magnetic Gages on Ferrous Substrates.

NOTE: We reserve the right to modify the selection of coating manufacturers prior to commencing our
field operations as long as they meet or exceed specified coating and meet with customer approval.

JB Safety International, Inc. ¢ P.O. Box 476 ¢ Seguin, TX 78156 ¢ 281-857-7919 ejeff@jbsafetyinti.com
htip:/Awww jbsafetyintl.com

Page |4

Page Image
Finance Committee - Agenda - 5/6/2020 - P90

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2460
  • Page 2461
  • Page 2462
  • Page 2463
  • Current page 2464
  • Page 2465
  • Page 2466
  • Page 2467
  • Page 2468
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact