Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 23911 - 23920 of 38765

Finance Committee - Agenda - 10/7/2020 - P81

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
81
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

ENERGY EFFICIENT INVESTMENTS INC.

Nashua High School South Total Weather Normalized Annual Energy Costs
$800,000

$700,000

$600,000

$500,000

$400,000

$300,000

$200,000

$100,000

a 2016-2018 AVG Baseline

@ Natural Gas $141,589
@ Electricity $558,762

Nashua High School North Total Weather Normalized Annual Energy Costs
$800,000

$700,000

$600,000

$500,000

$400,000

$300,000

$200,000

$100,000

5-

2016-2018 AVG Baseline
@ Natural Gas $141,816
B Electricity $592,299

19

Page Image
Finance Committee - Agenda - 10/7/2020 - P81

Finance Committee - Agenda - 10/7/2020 - P82

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Conditional Savings Guarantee

1. Windows and doors must remain closed all the time during the heating season and all window a/c units
must be removed prior to the beginning of the heating season as described below.

2. Thenew control system will use an “optimum start” sequence to determine the start-up time, which will
likely be 6AM. This sequence will evaluate indoor/outdoor conditions by taking temperature and
humidity measurements and start the equipment accordingly so that proper set-poimts are reached pnior to
occupancy. Shut offtime will likely be 9PM, in order to give cleaning crew time to work.

3. Thenew heating set-point (Oct 1’t— April 30") will be 68°F and the cooling set-point (May 1%t— Sept
30") will be 72°F, as agreed to between EEI and the customer. Please see Appendix B for the standards
of comfort.

4. EEI may conduct an annual site visit during which the lighting system and other ECMs will be inspected
to verify proper operation, ensure that it has been maintamed, and ensure that it continues to have the
potential to generate the expected savings. Lights may be opened to verify lamp counts and ballast types,
replacement stock may be inspected during the site visit to ensure that the proper replacement equipment
is available.

5. The annual M&V report will detail the results of annual inspection, noting significant problems such as
burned out lamps, change in operating hours, building size, addition of new equipment following project
completion, etc.

20

Page Image
Finance Committee - Agenda - 10/7/2020 - P82

Finance Committee - Agenda - 10/7/2020 - P83

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Appendix A - Utility Bills provided by School District

Utility Bills may be provided upon request.

21

Page Image
Finance Committee - Agenda - 10/7/2020 - P83

Finance Committee - Agenda - 10/7/2020 - P84

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

ENERGY EFFICIENT INVESTMENTS INC.

Appendix B— Standards of Comfort

EEI, Inc. .
Nashua School District

Occupied WT tery E-Le) = satel etal] 3) [1] i
Building rt) aie} Tiere tae acl | “Cooling Setpoint °F Cooling

Nashua High School North

Classrooms 68 60 72 80

Media Center 68 60 72 80

Cafeteria/Kitchen 68 60 72 a0

Auditorium 68 60 72 80

Offices 68 60 72 80

Gym 68 60 72 80

Library ‘68 60 ¥2 80

Hallways 68 60 f2 80
Nashua High School South

Classrooms 68 60 72 80

Media Center 68 60 72 80

Cafeteria/Kitchen 68 60 72 80

Auditorium 68 60 72 80

Offices 68 60 72 80

Gym 68 60 72 80

Library 68 60 72 80

Hallways ‘68 60 72 80

Notes:
1. All setpoints and times are suggested. Actual values to be determined after discussions with Nashua School District.
2. EE! will program a General Building Override button. This will allow the building operator to overnde the building schedule for non-scheduled events (such as snow days)

22

Page Image
Finance Committee - Agenda - 10/7/2020 - P84

Finance Committee - Agenda - 10/7/2020 - P85

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

Attachment 5 - Major Equipment List (Bill of Materials)

(6) Condensing Lochinvar Domestic Hot Water Heaters
(6) Circulating Pumps
(3) Lochinvar Domestic Water Storage Tanks
(3) B&G Expansion Tanks
(6,813) LED 2x4 and 2x4 retrofit fixtures with Spacewise control and wireless
dimming capability
(531) LED high bay fixtures with Spacewise control and wireless dimming capability
(1103) LED recessed can fixtures
(5,257) LED tubes and (2,994) LED drivers
(332) LED lamps
(227) LED round decorative fixtures
(62) High Efficiency Transformers

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Page Image
Finance Committee - Agenda - 10/7/2020 - P85

Finance Committee - Agenda - 10/7/2020 - P86

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

Attachment 6 — Scope of Work and Project Schedule

For scope of work refer to IGA

Note all work is anticipated to by completed in November 2021. EEI
and Nashua School District will coordinate access to building spaces
for work completion.

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Page Image
Finance Committee - Agenda - 10/7/2020 - P86

Finance Committee - Agenda - 10/7/2020 - P87

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

Attachment 7 - Additional Construction or Operational Requirements

The customer will be required to provide the ESCO access to the work site during normal
business hours. Some of the work activities may require the Customer to work around the
contractors performing the work. Scheduling and coordination of construction activities will
take place on a weekly basis to avoid unnecessary delay or disruptions to the contractors
work and that of the Customer. Owner must maintain equipment per manufacturer’s
requirements.

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Page Image
Finance Committee - Agenda - 10/7/2020 - P87

Finance Committee - Agenda - 10/7/2020 - P88

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

Attachment 8 — Standards of Comfort

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Page Image
Finance Committee - Agenda - 10/7/2020 - P88

Finance Committee - Agenda - 10/7/2020 - P89

By dnadmin on Mon, 11/07/2022 - 13:25
Document Date
Fri, 10/02/2020 - 10:52
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/07/2020 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100720…

EEI, Inc.

Nas hua School District

Unoccupie
/Off Time

Building
Nashua High School Nort
Classrooms 68 60 72 80 7:00 AM 3:30 PM
Media Center 68 60 72 80 7:00 AM 3:30 PM
Caf eteria/Kitchen 68 60 72 80 7:00 AM 3:30 PM
Auditorium 68 60 72 80 7:00 AM 3:30 PM
Offices 68 60 72 80 7:00 AM 3:30 PM
Gym 68 60 72 80 7:00 AM 3:30 PM
Library 68 60 72 80 7:00 AM 3:30 PM
Hallway s 68 60 72 80 7:00 AM 3:30 PM
Nashua High School South
Classrooms 68 60 72 80 7:00 AM 3:30 PM
Media Center 68 60 72 80 7:00 AM 3:30 PM
Caf eteria/Kitchen 68 60 72 80 7:00 AM 3:30 PM
Auditorium 68 60 72 80 7:00 AM 3:30 PM
Offices 68 60 72 80 7:00 AM 3:30 PM
Gym 68 60 72 80 7:00 AM 3:30 PM
Library 68 60 72 80 7:00 AM 3:30 PM
Hallway s 68 60 72 80 7:00 AM 3:30 PM
Notes:

1. All setpoints and tires are suggested Actual values to be deterrrined after discussions with Nashua School District.

2. EEf will programa General Building Override button. This will allowthe building operatorto override the building schedule for non-scheduled events (such as snow days) manually.

Page Image
Finance Committee - Agenda - 10/7/2020 - P89

Finance Committee - Agenda - 7/6/2022 - P129

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/01/2022 - 09:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2022 - 00:00
Page Number
129
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

. eas Eagle Point Gun/T) Morris and Son
CCl/Speer Ammunition 856-848-6945

Price List majortjmorrisiii@comcast.net
Rds per
Caliber Product Code Description Price case
.45 GAP 53979 185 gr. TM Lawman Brass $277.68 1000
53980 200 gr. TMJ Lawman Brass $277.68 1000
53978 200 gr. Goid Dot Holiow Point +P $417.37 1000
Rifle ammo
.223 cal 24448 64 gr. Gold Dot Soft Point $279.50 500
.308 cal 24458 168 gr. Gold Dot Soft Point $359.65 500
22 Win Mag 25 SHOTSHELL 12 SHOT $506.14 2000
23 40 gr. TMJ MAXI MAG $303.58 2000
24 40 gr. Jacketed hollow point MAXI MAG $300.60 2000
59 30 gr. +V Jacketed hollow point MAXI MAG $334.00 2000
22 Long Rifle 39 SHOTSHELL 12 SHOT $346.99 2000
30 40 gr. Copper plated round nose MIN} MAG $219.97 5000
31 36 gr. Hollow point MINI MAG $233.02 5000
32 40 gr. Lead round nose STANDARD VELOCITY $241.49 5000
33 40 gr. Lead round nose GREEN TAG COMP $522.04 5000
50 32 gr. Copper plated hollow point STINGER $387.26 5000
22 Short 27 29 gr. Copper plated round nose $263.87 5000
28 27 gr. Copper plated hollow point $272.36 5000
44 BLANK (PAPER) $402.75 5000
22 CB Short 26 29 gr. Lead round nose $254.62 5000
22 CB Long 38 29 gr. Lead round nose $277.76 5000
22 Long 29 29 gr. Copper plated round nose $278.53 §000
TMJ - Total Metal Jacket LRN - Lead round nose
FMJ - Full Metal Jacket JHP - Jacket Hollow Point
CF - Cleanfire

2019 New Hampshire

Page Image
Finance Committee - Agenda - 7/6/2022 - P129

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2388
  • Page 2389
  • Page 2390
  • Page 2391
  • Current page 2392
  • Page 2393
  • Page 2394
  • Page 2395
  • Page 2396
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact