Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P535

Finance Committee - Agenda - 6/7/2017 - P535

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
535
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15400-1

SECTION 15400

PLUMBING — GENERAL

PART 1 - GENERAL

1.1

1.2

DESCRIPTION

A.

Description: Perform the following items of work required to complete the work of

this Section, as shown on the DRAWINGS and specified herein:

1. All labor, materials, equipment and transportation shall be provided as required
to completely install the natural gas system, with all connections as shown on
the DRAWINGS and described in these specifications or as required by the
International Plumbing Code 2009. The accompanying DRAWINGS do not
show every detail of pipe, valves, fittings, hangers, equipment and fixtures
which are necessary for the complete installation but are provided to show the
general arrangement and extent of work to be performed.

Work Included: The plumbing work shall include, but not be limited to the following

(when applicable):

1. Fuel gas supply piping.

2. All other plumbing items indicated on the DRAWINGS, specified herein, or
needed for a complete and proper plumbing installation.

Related Work Specified Elsewhere (When Applicable)

Project cleaning is specified in Division I.

Caulking and flashing are specified in Division 7.

Pipe Sleeves and Seals are specified in Section 15092.

Pipe Hangers and Supports are specified in Section 15094.

Piping, pipe fittings, valves, insulation, fixtures, equipment, and accessories are

specified in the appropriate Sections of this Division.

6. Electrical is specified in Division 16.

Drawings and Measurements:

1. The Drawings show the general arrangement, direction, and sizes of
pipes. They are not intended to show every offset, valve, and fitting, and every
structural difficulty that may be encountered.

2. All measurements shall be verified at the job site.

WARWN >

QUALITY ASSURANCE

A.

B.

C.

Materials and Workmanship: All materials and workmanship shall be suitable for the
respective work and the type of service encountered.

Equipment: All equipment shall be constructed to operate safely without water
hammer and undue wear.

Local Codes: Perform all work in accordance with applicable state and local
plumbing codes, except where requirements of this Contract are more stringent.
Permits: Arrange for all permits, inspections, and tests required by codes at no
additional cost to the Owner.

Standards: When standards are referred to, the latest issue shall apply.

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P535

Footer menu

  • Contact