Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 22671 - 22680 of 38765

Finance Committee - Agenda - 3/6/2019 - P382

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
382
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

To:

From:

Re:

F. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: February 28, 2019

Stephen Dookran, P.E., City Engineer
Engineering Department

2019 CIPP Lining Project

To approve the award of the construction contract for the 2019 CIPP Lining Project to
Kenyon Pipeline Inspection, LLC of Queensbury, New York in the amount of
$2,825,135. Funding will be through: Department: 169 Wastewater; Fund: Bond;
Activity: Sewer Rehab

The 2019 CIPP Lining Project is focused on lining approximately 22,325 linear feet
(4.2 miles) of aging and deteriorating sewer mains. At some locations, preparation of
the sewer main for lining will include point repairs to the pipe and construction of
access manholes. Approximately 23 point repairs will be required and
approximately 10 manholes are estimated to be constructed. Lining of approximately
100 deteriorated manholes is also included in the work.

Seven contractors attended the mandatory pre-bid meeting on January 23. Of these,
four bids were received on February 13" as follows:

Kenyon Pipeline Inspection, LLC $2,825,135.00
Insituform Technologies, LLC $2,977,167.00
Green Mountain Pipeline Services, LLC $3,067,454.50
Granite Inline, LLC $3,087,092.00

The low bid was reviewed and found to be acceptable. It was determined from
checking references that Kenyon Pipe Inspection, LLC has performed satisfactorily
on other sewer projects of this capacity. Work is expected to begin in April.

Page Image
Finance Committee - Agenda - 3/6/2019 - P382

Finance Committee - Agenda - 3/6/2019 - P383

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
383
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

2019 CIPP Lining Project

Construction Specifications
and
Contract Documents

Prepared By:

Hayner/Swanson, Inc.
3 Congress Street
Nashua, NH 03062
Tel: (603) 883-2057

Ss
&

ull,
ON NEW ig ty,

%

%

My
m

MM bEeay,
wy oud -S7 My

s

P

Prepared For:

City of Nashua, New Hampshire
Division of Public Works
Engineering Department

January 2019

Page Image
Finance Committee - Agenda - 3/6/2019 - P383

Finance Committee - Agenda - 3/6/2019 - P384

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
384
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

TABLE OF CONTENTS

DIVISION
1. INVITATION FOR BID 000... ccesccnscseceeesecseceeneceassecssesasseseenarseseeeates
2. INSTRUCTION FOR BIDDERS ...000.00.0 ccc cece ctecneereeeesseceenenseeeeneees
3. BID FORM, BID BOND, BID SCHEDULE, AND CONTRACTOR’S
QUALIFICATIONS ooo cseeeesscseseceessessesseeeesnessessasseeeseaseesseenseee es
4. PERFORMANCE AND PAYMENT BONDS ..0.oo oe ceeneeteeseeeeeeees
5. AGREEMENT 0... cece cccceesecsscnecssesessecseesecnesseceeeseseenseseseeenesaeeaseaeaseates
6 GENERAL CONDITIONS Qc ccc ccceecssneesercsseesenseneseessensesessenaeenae
7 SUPPLEMENTARY CONDITIONS... cee cseeseesereeeseeaeseeeeeeeeee

8. EXHIBITS

Notice of Award

Notice to Proceed

Change Order

Certificate of Substantial Completion

SPOR >

9. CONSTRUCTION SPECIFICATIONS

TC-10f1

Page Image
Finance Committee - Agenda - 3/6/2019 - P384

Finance Committee - Agenda - 3/6/2019 - P385

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
385
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

DIVISION 1

INVITATION TO BID

Page Image
Finance Committee - Agenda - 3/6/2019 - P385

Finance Committee - Agenda - 3/6/2019 - P386

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
386
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

THE CITY OF NASHUA the Gate Cy’

Financial Services
Purchasing Department

February 1, 2019

IFB1087-021219
2019 CIPP LINING PROJECT
ADDENDUM #1

Information included in this document becomes a part of the original IFB.

If you are submitting a paper bid, please sign below to indicate receipt of this additional information and include this
page with your bid submittal. If you are submitting a bid via Bid Express please be sure to acknowledge the addendum
on the website before submitting your bid.

ADDENDUM 1 is being issued to provide additional documents and clarification.

Please see the attached document for information.

All other aspects of the original document remain the same.

Failure to acknowledge the addendum will result in the bid submittal being disqualified.

Sincerely,

Danielle Greenberg
City of Nashua — Purchasing Agent I!
greenbergd@nashuanh.gov

Addendum #1 received and incorporated into bid submittal for 1FB1087-021219.
Please sign and include this addendum in your bid package.

Gf ——

(Authorized Signature) SuSon l, Kenyon, CEO

ZA L19

(Date)
Kenyan Prowlne. Taspection, LLC

(Name bf Firm)

1F1087-021219 ADDENDUM 1 Page 1 of 1

Page Image
Finance Committee - Agenda - 3/6/2019 - P386

Finance Committee - Agenda - 7/20/2022 - P107

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/15/2022 - 12:19
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/20/2022 - 00:00
Page Number
107
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__072020…

17.

18.

19.

upgrading, demotion, transfer, recruitment, advertising, layoff, termination, rates of pay,
or other forms of compensation and selection for training, including apprenticeship.

Without limitation of the foregoing, Professional Engineer's attention is directed to “Title
41“Public Contracts and Property Management” C.F.R. Subtitle B “Other Provisions
Relating to Public Contracts” Section 60 “Office of Federal Contract Compliance
Programs, Equal Employment, Department of Labor” which, by this reference, is
incorporated in this contract.

Professional Engineer agrees to assist disadvantaged business enterprises in obtaining
business opportunities by identifying and encouraging disadvantaged suppliers,
consultants, and sub consultants to participate to the extent possible, consistent with their
qualification, quality of work, and obligation of Professional Engineer under this contract.

In connection with the performance of work under this contract, Professional Engineer
agrees not to discriminate against any employee or applicant for employment because of
race, creed, color, national origin, sex, age, or sexual orientation. This agreement includes,
but is not limited to, the following: employment, upgrading, demotion or transfer,
recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of
compensation, and selection for training, including apprenticeship.

Professional Engineer agrees, if applicable, to insert these provisions in all subcontracts,
except for subcontracts for standard commercial supplies or raw materials. Any violation
of any applicable provision by Professional Engineer shall constitute a material breach of
the contract.

ENDORSEMENT Professional Engineer shall seal and/or stamp and sign professional
documents including drawings, plans, maps, reports, specifications, and other instruments
of service prepared by Professional Engineer or under its direction as required under the
laws of the State of New Hampshire.

ASSIGNMENT, TRANSFER, DELEGATION, OR SUBCONTRACTING Professional Engineer
shall not assign, transfer, delegate, or subcontract any rights, obligations, or duties under
this contract without the prior written consent of the City of Nashua. Any such assignment,
transfer, delegation, or subcontracting without the prior written consent of the City of
Nashua is void. Any consent of the City of Nashua to any assignment, transfer, delegation,
or subcontracting shall only apply to the incidents expressed and provided for in the written
consent and shall not be deemed to be a consent to any subsequent assignment, transfer,
delegation, or subcontracting. Any such assignment, transfer, delegation, or subcontract
shall require compliance with or shall incorporate all terms and conditions set forth in this
agreement, including all incorporated Exhibits and written amendments or modifications.
Subject to the foregoing provisions, the contract inures to the benefit of, and is binding
upon, the successors and assigns of the parties.

CITY INSPECTION OF CONTRACT MATERIALS'~ The books, records, documents and
accounting procedures and practices of Professional Engineer related to this contract shall
be subject to inspection, examination and audit by the City of Nashua, including, but not
limited to, the contracting agency, the Board of Public Works, Corporation Counsel, and,
if applicable, the Comptroller General of the United States, or any authorized
representative of those entities.

GC 9 of 13

Page Image
Finance Committee - Agenda - 7/20/2022 - P107

Finance Committee - Agenda - 3/6/2019 - P387

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
387
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

IFB1087-021219
ADDENDUM #1

2019 CIPP Lining Project

Addendum #1 is being issued to respond to questions or suggestions received from bidders:

1. In the design criteria for CIPP for the Nashua job the soil modulus design criteria calls
for 500 psi. Typically the soil modulus is 1000 psi. In using 500 psi for design, the
resulting liner thicknesses will be greater than they may need to be, and will cost the
City more money. Would a consideration be made to increase the soil modulus design
criteria to 1000 psi?

Answer: The design criterion for modulus of soil of 500 psi as specified in Sections
02650 and Section 02651 shall be revised to 1000 psi.

2. Would it be possible to have materials approved in advance of bidding for the manhole
rehabilitation work?

Answer: Product approvals will be handled after the bid has been awarded, and be
reviewed for compliance with the specifications by the Engineer as part of
the contract submittal process.

3. What is the Engineer’s estimate for Nashua?

Answer: The City will not provide bidders with the Engineer’s cost estimate for the
Project.

4. A suggestion was made for the City to reevaluate the basis for the quantities for the
point repair items. The concern is the degree of uncertainty with respect to the total
repairs which will actually be performed.

Answer: The Bid Schedule has been revised to reduce the quantity of point repairs
to reflect the known locations of likely point repairs, and Item #12 has
been added to the Bid Schedule entitled “Allowance for Additional Point
Repairs”. Add the following to Section 01150, MEASUREMENT AND
PAYMENT , PART 2 —- DESCRIPTION OF PAY ITEMS:

2019 CIPP Lining Project Addendum #1
Nashua, NH Page 1

Page Image
Finance Committee - Agenda - 3/6/2019 - P387

Finance Committee - Agenda - 3/6/2019 - P388

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
388
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

215 ALLOWANCE FOR ADDITIONAL POINT REPAIRS

A. ALLOWANCE FOR ADDITIONAL POINT REPAIRS
Measurement & Payment
Item 12 is an ALLOWANCE value which has been established
in the Bid Schedule as a means to include funds in the event
that the Contractor is directed to perform additional point
repairs in excess of the quantities listed in the Bid Schedule.

Measurement and payment for additional point repairs shall
be based on the unit prices for the appropriate point repair
and roadway restoration items in the Bid Schedule.

5. A concern was raised regarding the maximum rate of $30 per hour for flaggers.

Answer:

The City has decided to bid the cost for flaggers on an hourly basis
without specifying the maximum hourly rate. The Bid Schedule has been
revised to show the quantity of flagger hours under Item 9B. Delete
Paragraph 2.12 B of Section 01150, MEASUREMENT AND PAYMENT,
PART 2 - DESCRIPTION OF PAY ITEMS, and substitute the following:

2.12 MAINTENANCE AND PROTECTION OF TRAFFIC

B. FLAGGERS

Measurement:

The quantity of Flaggers will be measured by the HOUR
based on the actual number of hours authorized, as
determined by the Engineer. The Contractor shall supply
qualified flaggers as stated in Section 618 of the NHDOT
Standard Specifications for Road and Bridge Construction,
(Approved and Adopted in 2016). Daily coverage needs to be
approved by the Engineer. The Contractor's schedule for
flaggers shall be agreed upon cooperatively with the Engineer.

Payment:
The approved quantity of flagger hours shall be paid at the

contract price for ITEM 9B. Payment shall constitute full
compensation to the Contractor for providing qualified
flaggers as required to direct traffic through or around the
Work as ordered by the Engineer, including all labor, high
visibility safety gear, tools and any other equipment necessary
to complete the work as specified herein. Payments to
Contractor will be made based on approved hours and
resulting dollar amounts.

2019 CIPP Lining Project Addendum #1

Nashua, NH

Page 2

Page Image
Finance Committee - Agenda - 3/6/2019 - P388

Finance Committee - Agenda - 3/6/2019 - P389

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
389
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

5. REVISED BID SCHEDULE:

A revised BID SCHEDULE has been included in this Addendum for use by
bidders (See attached PDF).

6. REVISED SHEET 2 of 37 - QUANTITY SUMMARY:

A revised Sheet 2 of 37 — Quantity Summary has been included in this Addendum
for use by bidders (See attached PDF).

- END -

2019 CIPP Lining Project Addendum #1
Nashua, NH Page 3

Page Image
Finance Committee - Agenda - 3/6/2019 - P389

Finance Committee - Agenda - 3/6/2019 - P390

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
390
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

2019 Nashua Sewer CIPP Lining Project - Quantity Summary By Street
1AL18) 1AQ1B) 1 + 1A{180)

‘TALtOa) 1AU19B) 4Ar12) tAQ12a) A126) tate) | ACIER) AL Ba) 7 1AGz0) 1Agom) 1Ai200) 1AG@A) 1AQ4e) 1Ag4b) | ABfe) 18RD) | 18ftc)
iG “ vw “ LF uF cf

3
g
Ss
&
sg

“8
sg

i
int

Us
Alt ba

isso1s
Video ter 16] 20° ci newer Pipe
Ppecier | Ling Pett Rega

3 ill] Fs
i
5
ui
i
i
i
i
{
aif:
{
Z
{
af
li

i
3
HA

2
+ | pipet pepe tp ogy dt
ot

Vegi
ty
i

i

j

al f
il
i
f
Hl
|
ABE
&
i
i
i
i
tt

1360 bo.

a (2) 18
5/318] | 18

a8

+) |f/8) [8

sla] | 8/3] |g] [gia] ja] || |8

\fdettit ey a
i
i
|

a
aia |g

7
+

&
li sie} |B te
a

s

5

s

s

S

s

all
i
OFF; ia |

Manhole Manhole ne
u Mowirce

Poird Repairs.

fl fe -

AAU ]EEle(# |
fp |-
|

i

Awe Vertical | ii nacen
cut see |

a
i
i
i
:
i
i
i
i
i
{

Permanent || Pavement | Seton | Incarirg

wensrg

i
lil
fi

i
li

j
i

i
i

PREPARED FOR: QUANTITY SUMMARY

i(ar)i} | DIVISION OF PUBLIC WORKS | i

2019 CIPP “

CITY OF NASHUA

‘DB POVERSOE DANE §=NASHUA NEW HAMPSHIRE C3002 (603) 00-3120

Lining Project oF 37

It JANUARY 2

Page Image
Finance Committee - Agenda - 3/6/2019 - P390

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2264
  • Page 2265
  • Page 2266
  • Page 2267
  • Current page 2268
  • Page 2269
  • Page 2270
  • Page 2271
  • Page 2272
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact