Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 18611 - 18620 of 38765

Finance Committee - Agenda - 10/2/2019 - P49

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
49
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Scope of Work Checklist for

The City of Nashua « NPD HVAC Repairs and System Upgrades RFP 0292-073119 - Proposal

BIDDING AND CONSTRUCTION ADMINISTRATION SERVICES

Included

Not Included

x

Attend contractor scope review interviews

x

Review of shop drawings

Review of test results

4

Periodic site visitations to observe progress of work. (MAXIMUM OF 10,
COMBINED WITH JOB MEETINGS)

Attend job meetings (COMBINED WITH ABOVE)

Review change order propasals

Review of contractor request for payments

wo] eT OX

Preparation of supplemental documentation/clarifications

Redesign of elements caused by contractor's error or scheduling
conflicts.

Project closeout, including one punch list and review of operating and
maintenance manuals

Record Drawings {compiled from contractor's redlines}

Fixed Line Mylars

Fundamental Commissioning

Additional Commissioning

eo po | ox i > Et

Attend commissioning meetings

40 So, River Rd #36, Bedford, NH 03410 | 646 Union St Suite 200, Littleton, NH 03561 | 603 444.6578 | ww yealonssscciates.com

Page Image
Finance Committee - Agenda - 10/2/2019 - P49

Finance Committee - Agenda - 10/2/2019 - P50

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

YEATON ASSOCIATES, INC,

Rate Schedule for Engineering Services
Effective Date: January 1, 2019

PPINGIDAL... cece eee ree ee aeeeesee nesaaeececnt et eeeteseretrttpatteeetteittieieeerseens. 9150,00 per hour

Senior Engineer/Project Engineer... cecsecseseease sce sctuecuseveesusentsecsereserye $125.00 per hour
Design Engineer. ........ 0... cere tee ceeeeenee een creerasiteeeeeeeeeeesereereearerrerernee 100,00 per hour
Engineering Techniician...............c.ec00e (is sieeve ete teeters SOO.00 per hour
CAD TOChmician..... ec eee renter erect ceases tredecesseesereesssreeees 970,00 per hour

CIGTICA. cece ee seeeeeate eee ecatieverrarere veneers tteresnesetserssssisessetetccescesescere 945,00 per hour

Selection of project personnel is at the discretion of Yeaton Associates, inc

MiCAQC. eee cesar cee ceeseneveeereretereietitetssesenspeeeniieeesanenrisvieesesseesee et SO/Mile

SUD-COMSUIAMES. ee cece cscs cce cee sce sevens sersussesstneseseesneesaesstitestyeraeesreresesscOSt +10%

40 So River Rd #36, Bedford, NH 03110 | 646 Union St Suite 200, Littleton, NH 03591 | 603.444.6578 | wenw yeatonassociates com

Page Image
Finance Committee - Agenda - 10/2/2019 - P50

Finance Committee - Agenda - 10/2/2019 - P51

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
51
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Firm Biography

Year Incorporated President
1973 Wayne G. Fillion, P.£.
Office Locations Consulting & Design Services Offered

646 Union St. Suite 200, Littleton, New Hampshire 03561 Mechanical Engineering, Electrical Engineering,
40 South River Raad #36, Bedford, New Hampshire 03110 Plumbing Engineering & Sustainable Engineering

Yeaton Associates, Inc. is a well-respected MEP consulting engineering firm with a commitment to quality
and an assurance that the company will deliver well-engineered, efficient and sustainable design services.
Founded in 1973, Yeaton has evolved its focus to pravide Mechanical, Electrical, Plumbing and Sustainable
Engineering Design Services as part of its integrated, multi-disciplinary approach to engineering.

For over 45 years, Yeaton Associates, inc. has provided and continues to provide expert, comprehensive
engineering consulting and design services for healthcare, academic, commercial and public facilities. A
focus on innovation and emerging technologies has allowed the company to stay at the forefront of high-
performance design, while a commitment to quality and service has made Yeaton Associates, Inc. a trusted
partner for those in need of engineering design services. The company’s extensive client base and diverse
project resume has garnered recognition throughout New England, and its commitment to quality has
allowed Yeaton Associates, Inc. to earn a reputation for excellence and excel as a well-respected design
leader within the industry.

Over 45 Years of Engineering Excellence

YVEATON ASSOCIATES, INC.

Page Image
Finance Committee - Agenda - 10/2/2019 - P51

Finance Committee - Agenda - 10/2/2019 - P52

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
52
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

VEATON ASSOCIATES, INC.

Mechanical Engineering Services

Heating, Ventilating and Air Conditioning (HVAC} System Design, Central Chiller and Heating Plant
System Design, Geothermal System Design, industrial Ventilation, Exhaust & Supply Systems for
Hospitals, Laboratories and industrial Facilities, Process Piping, Under Floor Air Distribution Systems,
Radiant Heating and Cooling, Thermal Storage, Cogeneration, Building Automation Systems and
Temperature Controls, Facility Assessments, HVAC Systern Evaluation & Master Planning, Feasibility
Studies, Investigations & Energy Audits, Energy Modeling and Life-Cycle Cost/Benafit Analysis, Energy
Recovery, Sustainable Design Integration and LEED” Certified Designs, Plumbing & Medical Gas, Smoke
Control Systems, Fire Protection Performance Documents, Building Information Madeling (BIM)

Electrical Engineering Services

Power Distribution Systems, Emergency/Standby Power Systems, Uninterruptabte Power Supply (UPS},
Energy Efficient and Ergonomic Interior and féxterior Lighting Design, Lighting Controls,
Grounding/Lightning Protection, Life Safety Systems , Fire Alarm Systems, Nurse Call Stations, Mission-
Critical Infrastructure and Distribution, Telephone & Data Systems, Cogeneration and Distributed
Generation, Facility Assessments, Electrical System Evaluation & Master Planning, Feasibility Studies,
Investigations & Energy Audits, Load Analysis & Utility Rate Analysis, Energy Modeling and Life-Cycle
Cost/Benefit Analysis, Sustainable Design integration and LEED’ Certified Designs, Photovoltaic Design

Plumbing Engineering Services

Plumbing System Design--including Water, Waste and Vent Systems, High-Purity Water Systems,
Laboratory Piping Systems, Medical Piping Systems, Medical Gas System studies and verification for
conformance with NFPA 99 {oxygen, nitragen, nitrous oxide}, Compressed Air and Vacuum Systems,
Separation of Process and Non-Process Waste and Water Systems, Water Consumption Analysis, Water
Conservation and Recavery Systems, Documentation & Drawings of Existing Conditions, Cross-
Connection Survey and Corrected Work, Facility Assessments, Plumbing System Evaluation & Master
Planning

Sustainable Engineering Services

Sustainable Design Integration and LEED® Certified Designs, Sustainable Development and LEED®
Consulting, Energy Conservation Analysis, Energy Modeling and Life-Cycle Cost/Benefit Analysis, Facility
Assessment, Sustainable Master Planning , Feasibility Studies & investigations, fEmergy Audits &
Retrofits, Energy Management Controls, Energy Code Compliance Forms, Alternate Energy System
Designs (Geothermal, Biomass, Solar), Waste Heat Recovery, Thermal Energy Storage, Rain Water
Reclamation Systems, Photovoltaic Design, Cogeneration, Conformance with ASHRAE $0.1 & 189
Standards

40 So. River Rd #36, Bedford, NH 09410 | 649 Union St Suite 200, Littetan, NH 09567 | 603 444 6878 way yeatonassociates com

Page Image
Finance Committee - Agenda - 10/2/2019 - P52

Board Of Aldermen - Agenda - 9/14/2016 - P15

By dnadmin on Sun, 11/06/2022 - 21:34
Document Date
Wed, 09/14/2016 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 09/14/2016 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__091420…

PETITION/STREET ACCEPTANCE:

The street acceptance is being petitioned by:

dtl Lue leewnen

DATE PETITIONER

| certify that | have received a Mylar showing the limits of the street to be accepted and that said
street has been constructed in accordance with the approved plan.

Jlow

Os [4 f 20/6
. DATE — CITY ENGINEER

Petition introduced at Board of Aldermen Meeting

DATE

Public Hearing conducted by the Committee on Infrastructure:

DATE TIME PLACE

Notice of this hearing was sent out to all abutters of that portion of the street for which acceptance
was requested, as listed on the attached list.

The foregoing petition was granted by the Board of Aldermen and Mayor on
DATE

Attest:

CITY CLERK

DATE

REV 08/13

Page Image
Board Of Aldermen - Agenda - 9/14/2016 - P15

Finance Committee - Agenda - 8/3/2022 - P53

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Thu, 07/28/2022 - 10:40
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2022 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

To:

From:

Re:

X. Motion:

Attachments:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: July 28, 2022

Daniel Hudson, P.E., City Engineer
Engineering Department

2022 Sewer Replacement Project - SUR West Change Order No. |

To approve Change Order No. | to the 2022 Sewer Replacement Project with SUR
Construction West, Inc. of Winchester, NH for an amount not to exceed $500,000.00.
Funding will be through Department: 169 Wastewater; Fund: Bonded; Activity: Sewer
Repair.

2022 Sewer Replacement Project, Change Order No. 1

SUR Construction West was contracted for the 2022 Sewer Replacement work under
IFB0779-021022. SUR West has been our sewer contractor since 2020, and we have
found their work to be excellent and reasonably priced. Through completed Close Circuit
Television (CCTV) pipe inspection work, we have identified additional sewer pipe that
needs repair or replacement. The Engineering Department is finalizing plans for work on
Factory St and Lock St and would like to secure funding for construction this fall. The
purpose of this Change Order is to expand SUR Construction West’s contract to include
replacement of additional deteriorated sewer pipes.

The above change order will allow for repair or replacement of deteriorated pipe segments
and accompanying sewer structures and sewer services, if necessary. If portions of these
pipes are found to be in satisfactory condition, or suitable for lining, they will be retained
and funds used for repair or replacement of other sewer pipes and structures found to be
in disrepair through the City’s ongoing CCTV work.

Page Image
Finance Committee - Agenda - 8/3/2022 - P53

Finance Committee - Agenda - 10/2/2019 - P53

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Project Team

Wayne G. Fillion, P.E. — President, MEP/FP Principal-In-Charge

Wayne is a registered Professional Engineer who has been with Yeaton Associates, Inc. for
nearly 30 years. He is the President of Yeaton Associates, inc., a position he has held for the
past 20 years. Wayne began his career as an HVAC Design Draftsman for two engineering
firms based in Burlington, Vermont: Wieman-Lamphere Architects and Jennison Engineering,
inc. Prior te his role as President for Yeaton Associates, Inc., Wayne served as a Senior
Project Engineer as well as Vice-President of the company.

Ryan C. Mealley, P.E., CEM. —Mechanieal Engineering Manager

Ryan is a registered Professional Engineer at Yeaton Associates, Inc. Prior to joining the
& company, Ryan held the title of Senior Mechanical Engineer at the engineering firms of AKF
hee Group and CES, Inc, as well a5 being the Mechanical Engineering Department Manager for
Diversified Technology Consultants in Connecticut. Ryan has extensive experience in
healthcare, academic, industrial, commercial and federal government facilities.

gfe

wes
tee

a

Lenny J. Edmunds — Electrical Project Manager

Lenny is an Electrical Project Manager at Yeaton Associates, Inc. Prior to joining the
company, Lenny held the position of Senior Electrical Designer at RFS Engineering in Laconia,
New Hampshire, and previous to RFS, was a 23 year veteran of C & M Engineering in
Manchester, New Hampshire. Lenny has extensive work experience in Educational,
Healthcare, institutional and Commercial Electrical Engineering. Lenny works out of the
Bedford, New Hampshire Office and resides in Concord.

Keith A. DeMoura — Construction Administrator

Keith is the Construction Administrator for Yeatorn Associates, Inc. He has been the
Owner/Operator of KND Metals for the past two decades servicing the greater New England
area, Keith has extensive HVAC experience in medical facilities, educational facilities, office
buildings, commercial buildings and industrial facilities.

40 So, River Rd #36, Bedford, NH 03710 | 646 Union St Suite 200, Littleton, NH 03567 | 603 444.6578 | www yeatenassociates com

Page Image
Finance Committee - Agenda - 10/2/2019 - P53

Finance Committee - Agenda - 10/2/2019 - P54

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
54
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Municipal Facilities Experience

“

Clackwise: Vermont Supreme Court Bu

ding — Montpelier, VT; Carpenter Memorial Library — Manchester, NH; Lyndonville Public Safety Complex,

tyndonvilie, VT; Hampton Fire & Rescue Station — Hampton, NH; State af New Hompshire Tobey Building - Concord, NH

+ Bartlett Fire Station

* Bedford Patrol Shed

* Bedford Toll Plaza

* Berlin Courthouse

¢ Berlin Public Works

* Bethlehem Town Building

* Caledonia County Courthouse
« Carpenter Memorial Library

e Carroll County Courthouse

+ Center Harbor Town Complex
* Chesterfield Welcome Center
¢ Cohas Brook Fire Station

* Concord Prison

© Coos County Courthouse

« Dover District Courthouse

* Dover Toll Plaza

* Errol Town Hall

® Exeter Town Hall

* Franconia Town Hall

* Freedom Allay Shooting Sports
* Gorham Town Suilding

* Grafton County Complex

« Hampton Fire & Rescue Stations

® Hampton Toll Plaza

* Hoiderness Municipal Building

* Hopkinton Fire Station

* Jaffrey-Peterborough Courthouse
« Laconia Fire Station

* Lakes Region Fire Aid

* Lisbon, NH Patrol Shed

¢ Litchfield Fire Station

® Littleton Fire Station

® Littleton Police Station

* Littleton Town Building

* Littleton Town Garage

* Londonderry Fire Stations

* Londonderry Town Hall

# Lyndonville Public Safety Complex
« Manchester District Court

* Merrimack Court House

* Milford Ambulatory Service Facility

« Nashua Fire Station - Spit Brook Rd.

* New Hampshire Charitable Found
* New Hampshire National Guard

* North Conway Fire Department

© Pease Trade Port

# Pelham Fire Station

» Plymouth District Courthouse

® Plymouth Police Station

* Public Risk Management Exchange

* PSNH Headquarters

* Salem, NH Patrol Shed

« Strafford, NH Patrol Shed

* Shelburne Town Hall

¢ Somersworth Municipal Offices Building
* State of New Hampshire Office Buildings
* State of New Hampshire Tobey Building
* State of Vermont Office Buildings

* Strafford County Courthouse

* Thornton Town Hall

* Tuftenboro Fire Station

* Vermont Supreme Court Building

e Waterford Visitors Center

* Whitefield Town Office Building

° Whitney Community Center

« Wolfeboro Town Office Building

40 So River Rd #36, Bedford, NH 03110 | 545 Union St Suite 200, Liltleton, NH 03561 | 603 444.6578 | wae yealonassociaies com

Page Image
Finance Committee - Agenda - 10/2/2019 - P54

Finance Committee - Agenda - 10/2/2019 - P55

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
55
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

References

Ken Coombs R.A., NHARNG
Architect/Project Manager, NHNG-FMO
Tel: (603) 227-1466

Email: kenneth.coombs8.nig@mail.mil

Dennis Bacon
Facilities Manger
Weeks Medical Center
Tel: (603) 788-5012

Email: Dennis.Bacon@weeksmedical.org

Jim Magoon, CHFM

Plant Gperations Manager
Concord Hospital

Tet: (603) 415-6606

Email: jmagoon@crhc.orge

Matthew Moore, P.E.

Director of Facilities

Community College System of New Hampshire
Tel: (603} 230-3565

Email: memoore@ccsnh.edu

Ryan St.Cyr

Facilities Director

Littleton Regional Healthcare
Tek: (603) 444-9261

Email: rsteye@trhcares.org

VEATON ASSOCIATES, INC.

Page Image
Finance Committee - Agenda - 10/2/2019 - P55

Finance Committee - Agenda - 10/2/2019 - P56

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

THE CITY OF NASHUA ry

ybnitingies Seat:
Purdie Deputies -

th

July 17, 2029

RFPO2Z92-073215
NPD HVAC REPAIRS AND SYSTEM UPGRADES
ADDENDUM #1

Informatio included in this documen: becomes a part of the orginal RFQ

li you are submitting 2 paper bid, please san below to indicate raceipt of th’s additional informations and include this
page with your bid submittat. if you are subnitting a bid via Bd Express pleasa be sure to acknowladaa tre addendum
Gn the webs te befc 2 submitting your did

ADDENDUM 3 is being Issued ta confirm the correct date and time fer the Mandatory pre-bid canference,

Page 2ofthe bed umant showed 1000 am on Friday $, 2019 The correct cate and time is 10:00 a.m. on Thursday,
July 18, 2042

Ail other aspects . f the original document remain the same.

failure to acknawledes the addendum will result in the bid submittal being disqualified

Sincerely

Dan Kooken
City of Nashua - Purchesing Manager
koonenc@sashuath.eov

Addendurn #1 received and Incorporated into bid submittal for AFPO292-073119,
Please sign and include this addendum In your bid package.

yea Associ ute § Dc

{Name of Firm)

Page Image
Finance Committee - Agenda - 10/2/2019 - P56

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1858
  • Page 1859
  • Page 1860
  • Page 1861
  • Current page 1862
  • Page 1863
  • Page 1864
  • Page 1865
  • Page 1866
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact