Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 18211 - 18220 of 38765

Finance Committee - Agenda - 5/15/2019 - P43

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
43
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

a — - = : ce er pa nsary—ne

§4t44t Value - analysis _ / | ; : 7 NA _-
| |

|

|

4

§$4.1.442 Detailed cost estimating beyond that
_ required in Section 6.3.

CM / Owner

§44.1.13 On-site project representation J __ NA —.__
§4.1.1.14 Conformed documents for construction | . i ed

« Aawier ” a, : |
| §4.1.1.15 As-designed record drawings __ —_——-—__|___ NA _. I
$444.16 As-constructed record drawings We ; NA ae |
| § 441.17 Post-occupancy evaluation — ee A
| §4.1.1.18 Facility supportserviees i. ee NIA sd
§4.1.1.19 “‘Tenant-related services ee } - ~ Ree
§ 4.1. 4.20 Architect’s coordination of the Owner's

__consultanis

“§44A. 4. 21 Telecommunications‘data design _
| §41.1.22 Security evaluation and planning _
§ 4.1.4.23 Commissioning

§4.1.4.24 Sustainable Project Services pursuant to Section
4.13 |

§41.1.25 Fast-track design services _ |
§$41.1,.26 Multiplebidpackages

§4.1.1.27 Historic preservation

(§4.1.1.28 Furniture, furnishings, ; and ¢ J eguipmen ment design _

1 $44.1.30 Other Supplemental Services
PAGE 13

| §4.4.4.29 Other services provided by specialty Consultants :

As requested in RFP no tunher supplemental services anticipate at this time.
PAGE 75

| Two ( 2_}reviews of each Shop Drawing, Product Data item, sample and similar submittals of the
Contractor

3 Two t os ) ispections} ‘for any portion of the Work to ficfetihine whether such portion of the Work is
substantially complete in accordance with the requirements of the Contract Documents

4 Two (2) inspections for any portion of the Work to determine final completion.

§ 4.2.5 Ifthe services covered by this Agreement have not been completed within twelve (12) months of the date of
this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall be
compensated as Additional Services.

PAGE 16

§ 6.3 In preparing estimates of the Cost of Work, the Architect shall be permitted to include contingencies for design,
bidding, and price escalation; to determine what materials, equipment, component systems, and types of construction
are to be included in the Contract Documents; to recommend reasonable adjustments in the program and scope of the
Project; and to include design alternates as may be necessary to adjust the estimated Cost of the Work to meet the
Owner’s budget. The Architect's estimate of the Cost of the Work shall be based on current area, volume or similar
conceptual estimaling techniques. If the Owner requires a detailed estimate of the Cost of the Work, the Architect shall
provide such an estimate, ifidentified as the Architect’s responsibility in Section 4.1.1, as a Supplemental Service. All
construction estimates provided by CM,

PAGE 17

Additions and Deletions Report f. for AIA Document B101' ™ — 2047. Copyright © 1974, 1978, 1987, 1997. 2007 and. 2017 by The American institute of A of Architect Ss.
All rights reserved. WARNING This AIA*® Document is protected by U.S. Copyright Law and Internaiioral Treaties. Unauthorized rooinduction oF

distribution of this AIA” Document, ar any partron af it, may result in severe civil and ¢rimunai penalies, and wil be progcecided to the maxinuin exient
possible under the law. This document was produced by AIA software at 11:12:42 ET on 04/02/2019 under Order No.0100024863 which expires on 1243/2019,

and is nol for resale
User Notes: (1131096914)

Page Image
Finance Committee - Agenda - 5/15/2019 - P43

Finance Committee - Agenda - 5/15/2019 - P44

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
44
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

§ 7.2 The Architect and-che-Architeet’s-consultants- shail-be-deemed the authors and-owners-of their respective
instruments-of Service-includine the Drawings and Specifications;and shall retain all common daw, slatuiony-and
Sines Poser vetriag ial nelaetnipeopyniems: Suenienomes distribuiien-of Instrument ofservice 40 meet official
regulatory-requirements-or-tors Anectonwith the-Project note -be-consired as publication in
derogation of the reserved. rights-of-the Architeotund-the rehiteet +-consulants. hereby assigns to the Owner, withoul
reservation, all copyrighis in all Project-related documents, models, photographs, and other expression created by the
Architect, Among those documents are certain "Instruments of Service," including the design drawings and the
Consiructi n Documents. the Owner's obligation | LO pay the -Archilget Is expressly. conditioned pon 1 the Archiecy s

obligate the Architect to the Owner as expressed in this 5 subse ction. which copyrighis the Acchiteol, in tvy, hereby
assigns lo the Owner, The Owner, in return, hereby grants the Architect and its Consultants a revocable, nonexclusive
license lu reproduce the documents for purposes relating directly to the Architect's performance ot its oblipations
under this Agreement for the Architect’s archival records, and for the Architect's reproduction of drawings and
photographs in the Architect's marketing materials, provided that the Projeci-related contents of those materials are
approved as as request in in Section. i. 3of this Agreement. 1 his nonexclusive license. shall lenminale automatically w pon

$ n. This nonexclusive license is 18

nonexclusive eae ane in this Agreement hea hitect for purposes of the Architect’ s ‘performance hereunder
may be sub: licensed ww a the Architect’s Consultants Cwith the same. oe Subject. to the foregoing. this

mainte: oF “its aMenst to do so.

§ 7.3 The Architect grantste-the Owner a-ionexclusive leense touse the Architect's Insiruments-of Service solelyand
exchisively for purpeses-of-consiucting, using, maintaining, altering and adding to the Project, provided that-the
Owner subsiantially pertorms-its- obligations underthis 4 preement including promptpaymentof all -sunms-dee
pursuanttie“Arnele-Dand-Ariele L1_The Architect shall obiain sumilar nonexclusive licenses from the Architect’s
consultants consistent with this Agreement.Fhe ticense granted underthis section permits the Owner-to-authorize the
Gontraetor, Subcontractors, Sub-subconiractors, and supplers,-as-well-as the Owner's consultants and separate
contrictors,ti-reproduce applicable pertions of the Instiuments of Service, subject te-any protecels- established
pursuantio Section-13,-selely-and- exclusively for use in performing services of consiruction-ferthe Preject-H the
Archilect-vightully terminates-this A preement for cause-as provided-in Section 9.4, the license-granted-in-this-Seetion
2.3 shall terminate,

§ 7.3.4 Inthe eventthe Owner-usesthe Instruments of Service without-retaining the-authors of the struments of
Serice, the Owner releases the Architeet-and Architect's consuliant(s)4ronall-claims- end canses-ofachon-arising
Hoey SeeIneXeES the ei seeeae yen eaey aw,-further aprees-to indemnify-and-hold hapmlessthe

5 i sty-and-expenses, including the cost-of defense, telated-te claims and causes-of
setion-anseried by-any third perion-or entily-o the exent such costs and-expenses-arise -from-the Ownersase-ofthe
iasiruments of Senice under-this-$ soFthis Section -.3.4-shall aot apphy Hf the Owner rightly
terminates this Agreementtarcause- under Section 4, To the extent that liability arses from misuse of the misuse of ihe
instruments of Service by the Owner or another architect or engineer, the Architect shall nol be responsible for that misuse. If the
Owner uses the Instruments of Services for purposes including additions to and modifications of the Project, and for other
projects, th Owner shall indemnify the Architect for losses, including reasonable attorney's fees, suffered by the Architect as a
result of the use of the design and these documents for such other purposes, the Qwner shall see that they are modified (a} to
indicate that the Architect did not prepare them for such other purposes and is not responsible for their use In connection with
such other purposes and (b) to delta the Architect's name and seal from the documents (where permitted or required by law).

§ 7.4 Except for the licenses granted in this Article 7, no other license ar right shal! be deemed granted or implied under
this Agreement. Fhe Owner-shall-not-assign,- delegate, sublicense, pledge or othemvise-transfer anyicense granted
herein to-another party without-the-prier-weitier-agreement ofthe jrehitect Any unauthorived-use-of the instruments
efServiee-shall be atthe- Owner's sole rsk-andavithout-liabiity to the Architeet- andthe Architect 's-consultants- No
other Project-related data, expression, or documents may be reproduced by the Architect of its Consultants for any
other proposes without the express written permission of the Owner,

PAGE 18

Additions and Deletions Report for AIA Document 107" — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American instiute of Architects.
All rights reserved. WARNING: This 41A° Document is protected by US. Copyright Law and tmernational Treabes. Unauthorized rearoducton se 7
distribution of this AIA” Document, or any portion of 4. may resulf in severe civil and criminal penalties, and will Ge wrasecuted to the maximum extort
possibile under the saw. This document was produced by AIA software at 11:12:42 ET on 04/02/2019 under Order No.0100024863 which expires on 12/43/2019

and is not for resate.
User Notes: (1131096914)

Page Image
Finance Committee - Agenda - 5/15/2019 - P44

Finance Committee - Agenda - 7/20/2022 - P4

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Fri, 07/15/2022 - 12:19
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/20/2022 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__072020…

UKG

Page 1 of 2
Quote Type: Renewal
Customer: CITY OF NASHUA
Solution ID: 6103494
Payment Terms: Net 30 Days Contract #: 1188274 RO3-MAY-22
Currency: USD Date: 08-MAY-2022
Customer PO Number: Prepared by: Yolanda Abram / US PublicSector2
Bill To: CITY OF NASHUA Ship To: CITY OF NASHUA - IT DIVISION
229 MAIN STREET 229 MAIN STREET
NASHUA NH 03060 NASHUA NH 03060
UNITED STATES UNITED STATES

Contact: NICK MISEIRVITCH
Email: miseirvitchn@nashuanh.gov

Contract Period: 01-SEP-2022 - 31-AUG-2023

Description Support Services Estimated Tax Subtotal
Software Support Services 50,660.82 0.00 50,660.82
Equipment Support Services 14,948.31 0.00 14,948.31
Educational Services 12,050.38 0.00 12,050.38

Total 77,660.01 0.00 77,660.01

Annualized Contract Value: 78,533.97
The Annualized Contract Value is the value of the contract if all services are priced for 365 days. The Annualized Contract Value does not include
estimated tax. Please note that this quote may include services priced for prorated periods.

If you are tax exempt; please provide a copy of your "Tax Exempt" certificate with your PO or signed quote.

Support Services are subject to applicable taxes. The tax amount shown on this quote is only an estimate. The actual tax due will be reflected on the invoice.

CITY OF NASHUA KRONOS INCORPORATED

Signature: Signature: Lez kichard

Name: Name: Liz Richard

Title: Title: Business Analyst, Support Contracts
Date: Date: June 6, 2022

U KG Kronos Incorporated, AUKG Company 900 Chelmsford Street Lowell, MA01851 +1800 225 1561

Page Image
Finance Committee - Agenda - 7/20/2022 - P4

Finance Committee - Agenda - 5/15/2019 - P45

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
45
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

§ 8.1.3 The Architect and Owner waive consequential damages-for-claims, disputes, or other matiers AG cuee
arising -outotorreinngiothis Agreement This-mutual waiver isappheable-without limitation, to all consequential
damages due-to-either parly'sterminatien-of this Apreement, except as-specifedlly-provided fe S6Ctibn
9-Alntentionally omitted

§ 8.2.2 The-Ownerand Architect shall endeaverto resolve claims, disputes-and other matters in- question beuveen them
by mediatios-which, unless the parties mutually .aaree-oiherwise,-shall be adminisiered-by the American Arbitration
Assectation in-aecordance-with-its Construction Indust'y Mediation-Procedures in effect onmihe date-ul this
Agreement_A- request fur mediation shall be snade in writing, delivered iothe-other party-to-this Agreement. and filed
with the-person_ or entity-administerimg the-mediatien—The request-may-be made concurrently with the-fii ne-ofa
complaint-or other appropriate-demand for binding -dispate resehition but, in-such-event, med:ation shall preceed in
advance of binding dispute-resohition proceedings, which shall be stayed-pending-mediation-for a peried-of-60 days
fromthe date of filing.uniess-stayed fora longer period-by-agreement-of the -parties-or-court-order-H an arbitration

ee section,the- parties may nonetheless proceedto-the selection of the urbitraterts)
r-preceedings. Intentionally omitted

[| }-—--bitigation ine courtof competent jurisdichonX_|_ Litigation in the State of New Hampshire
Superior Court [Hillsborough South.
PAGE 19

§ 9.1 Hthe Owner -fails-to-make paymeniste-the Architect in-accordance-withthis Agreement, such failure-shall be
consideretl substantial nonpertormance and cause for termination or atthe Arehttects-option- cause forsuspension of
under this-Agreemenf the Architect-eleets to suspend services: the Architect shall give

faces are re notiee-te-the Owner-before suspending services. Inthe event-ofasuspension of services-the
Architect shall have ne-labilityto.the Owner-for delay-or damage caused the Owner beeause of such suspension-of
services Belere resuming services, the Owner shall pay-the Architect atL-sums- due prorie- suspensionand any
eee eee oe ee of the -Architect-¢ serviees- The Archieet’s fees for the

‘ equitably adjusted: The Architect shall give the Qwner twenty-one
@)D: days wr written notice of the Architect's intention to terminate or suspend provisions of Services. This notice shall
detail the Archilect’s specific reason(s) for its intended termination or suspension and shall state with specificity the
means by which the Owner may cure the alleyed reason,

§ 9.2 If the Owner suspends the Project the Architect shall -be-compensated- Bonsehibes peridemied Prat to netice-of
such suspension._When the Project is resumed the Architect shall be-compens:
imerrupien and -resumption of the Architect's serviees-The “Arehitect “s- fees-_for shecamaic ey servives-and-the time

schedules shall-be equitably adjusted:fails to make payments io the Architect that are otherwise due hereunder and are
not subject toa yood faith dispute, the Architect shall give the Owner fourteen eae adv: anced weritien. notice o of
ils intention to suspend Services. If the Owner fails either to pay or justify its lac
in accordance the terms of this Agreement Architect may give notice of suspension and suspend the | Services fix ve (5)
day thereafter. Services shall otherwise be performed continually and expeditiously, including during the pendency of
disputes. The suspension shall cease when payment in full of undisputed amounts is made.

§ 9.3 dethe-Ownersuspends-the- Project formere-than-06 cumulative days fer reasons-otherthan-the fault of the
Architect, the Archiectmay terminate-this-Apreement-by giving netless thun-seven days” written -notica-Lnless
otherwise noted herein or dicated in the Project Schedule most recently approved by the Owner, or unless caused by
the Architect if the Project is suspended by the Owner [or more than ninety (90) consecutive days, the Architect shall
be compensated for Services that were fully and satisfactorily performed prior to suspension and shall receive
equitable payment for the Architect’s demonstrated actual costs to remobilize 19 continue performance when Services
are recommended by request of the Owner,

§ 9.4 Either party may-terminatethis-A.greement-apen-neess than seven days’-written notice should the other party
einai rca i oer ieee eee the-party imibating the

se, for the Owner’s convenience

Additions and Deletions Report for AIA Document 8161™ 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American institute of Architects.

Ail rights reserved, WARNING: This AIA” Document ts protected by iS. Copynait iaw and International Treaties. Unauthorized reproduction or 8
distrbution of this AIA” Gocuraent. or any portion of it, may resuit in severe civil anv criminal senalties, and will be prosecuted to the maximunt extent
pessthie under the taw. This document was produced by AIA software at 17.12.42 ET on 04/02/2019 under Order No.0100024863 which expires an 12/13/2049

and is not for resale
User Notes: {11314096914}

Page Image
Finance Committee - Agenda - 5/15/2019 - P45

Finance Committee - Agenda - 5/15/2019 - P46

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
46
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

cause, ‘but that ¢ cause use be Subseauontty found to be insufficient to "I nai enon, the termination ‘shall be deeded
one of convenience,

§ 9.5 The Ownermay tenninate-thisAgreement-upoen-not-lessthan-seven days’ written -netive-to-the Architect forthe
Eunos sconvenience and without eause: In the event ol ter mination not the fault of the Avchilcet, the. Architect shall

§ 9.6 the -Ownerterminates this -Aereement foriis-convenience puriuant-te-Secton-4.5_orthe Architect erminates
this Agreement pursuant to Section 9.3, the Ovner shall compensute the Architect for-services-perfermed-priorio
termination: Reimbursable-Expenses-ineurred,and-cosis atusbuteble-to-termtinition, inchiding the costs-attribtiable-to
the-Architects_termminaion-of consultant agreemenis.Intentional omitted.

§ 9.7 dradditionic-an-aniounts-paid under Section-9.6,+f:he Ouner temminates-this- A preement for its convenience
purstuntie Section 5.5 ,orthe Architectterminates-this Aereement-pursuantio Secten-9. 4, the Qwrershall pay tothe
sai al ce ie

A Termination bee:

2—~—Licensiig Fee +f the Owner-imendste-continueusing he Architect-s-Instruments-of Semice:
Intentionally omitted,

§9.85 é ; seni this Agreement shallierminate- one-year from the-date of
Substantial Completion, (Termination Expenses) Any reference to Termination Expenses elsewhere in this Agreement shall be
of no effect.

§ 9.9 The Owners deh tesethe- ~Arechiect’s Iastrumenis-ef Semvice atthe eventofa tesminghon ef this -vereement
are-setforthin-Article and Section 9.7.(Cooperation afier Termination) in case of any termination, The Architect shall:

1) Cooperate with Owner in completing the Project:

2) Provide information requested by the Owner in connection aes completion. ul {the Project:

even if incomplete, prepared by

the iS Architerty up. to o the date of te of termination: -and

4) if requested by the Owner, provide a reproducible copy of all Drawings, Specifications and other documents to
describe the constructed Work as of the date of tennimation,

Services provided afler termination shall be compensated as Additional Services.

PAGE 21

143,700.00

Quoted for defined scope with prior approval

Quoted for defined scope with prior approval

§ 11.4 Compensation for Supplemental and Additional Services of the Architect’s consultants when not included im
Section 11.2 or 11.3, shall be the amount invoiced to the Architect plus percent (1.15 %), or as follows:
PAGE 22

Schematic Design Phase 20,000.00 percent [( My)

Additions and Deletions Report for AIA Document B101™ — 2017. Copyright © 1974, 1978, 1987, 1997. 2007 and 2017 by The American Institute of Architects.
All rights reserved, WARNING: This AiA” Document is protected by US. Copyright Law and International Treaties. Unauthorized reproduction a
distribution af this AIA Document, ar any portion of rt. may result in severe civil and criminal penalties, aret will be prosecuted ta the maximum extent
possible under the law This document was produced by AIA software at 14:12:42 ET on 04/02/2019 under Order No.0100024863 which expires on 12/13/2019.

and is not for resale.
User Notes: (1131096914)

9

Page Image
Finance Committee - Agenda - 5/15/2019 - P46

Finance Committee - Agenda - 5/15/2019 - P47

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
47
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

Design Development Phase 25,000.00 — percent ( Yo)

Construction Documents 62,763.00 — percent ( Ma)
Phase

Construction Phase 35,937.00 — percent { "%)
Total Basic Compensation —— one-hundred 143,700,00 percent ( —S—S—~=~«~dC‘S

See Exhibit B & Dennis Mires, PA The Architects Hourly Rates
PAGE 23

§ 11.8.2 For Reimbursabie Expenses the compensation shall be the expenses incurred by the Architect and the

§ 11.10.14 An initial payment of Zero _(S§ 0_) shall be made upon execution of this Agreement and is the minimum
payment under this Agreement. It shall be credited to the Owner’s account in the final invoice.

§ 11.10.1.2 ifa Sustainability Certification is part of the Sustainable Objective, an initia! payment to the Architect of
N/A {S$ ) shall be made upon execution of this Agreement for registration fees and other fees payable to the
Certifying Authority and necessary to achieve the Sustainability Certification. The Architect’s payments to the
Certifying Authority shall be credited lo the Owner's account at the lime the expense is incurred.

§ 11.10.2.1 Unless otherwise agreed, payments for services shall be made monthly in proportion to services performed.
Payments are due and payable upon presentation of the Architect's invoice. Amounts unpaid thirty (30 ) days after
the invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal rate prevailing from
time to time at the principal place of business of ihe Architect.

Zero "oO ‘per mo.
PAGE 24

NIA

[ N/A_] AIA Document E204™.2017, Sustainable Projects Exhibit, dated as indicated below:

Exhibit A - Proposal dated July 31, 2018

Exhibit B - Dennis Mires, P.A.

Additions and Deletions Report for ALA Document 8101 ™ — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects.
All rights reserved. WARNING: This AIA Document is protected by 4.8. Copyright Lav and International Ircaties Unauthorized repreckiction or

distnbution ef this AMA” Document, or any portion of tt, may result in sewerg cive and criminal penalties, and wil be prosecuied to (ie + MUM extany,
possible under the law This document was produced by AIA software al 14:12:42 ET on 04/02/2019 under Order No.0100024863 which expires on 12/13/2019,

and is nat for resale
User Notes: {3131096914}

Page Image
Finance Committee - Agenda - 5/15/2019 - P47

Finance Committee - Agenda - 5/15/2019 - P48

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
48
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

_Dennis Mires, President. AIA Lie No OLO18

Additions and Deletions Report for AIA Dacument B101™ — 2017. Copyright @ 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects.
Allrights reserved. WARNING: This AIA* Document is protected by U5. Capyriqnt Law and internatianal Treaties Unauthorized reproduction or 44
distribution of thie AIA” Document, or any portion of it, may resulCin severe chell and creainal perrallies, sad will be prosecuted to the maximum extent
possible under the law This document was produced by AIA software at 11:12:42 ET on 04/02/2019 under Order No.0100024863 which expires on 72/13/2019,

and ts not for resale,

User Notes: (1131096914)

Page Image
Finance Committee - Agenda - 5/15/2019 - P48

Finance Committee - Agenda - 5/15/2019 - P49

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
49
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

Certification of Document’s Authenticity
AIA® Document D401™ — 2003

1, Dennis B. Mires, AIA Presdient, hereby certify, to the best of my knowledge, information and belief, that | created
the attached final document simultaneously with its associated Additions and Deletions Report and this certification at
11:12:42 ET on 04/02/2019 under Order No. 0100024863 from AIA Contract Documents software and that in
preparing the allached final document {| made no changes to the original text of AIA* Document B1O1™ 2017,
Standard Form of Agreement Between Owner and Architect , as published by the AJA in us sofiware, other than those
additions and deletions shown in the associated Additions and Deletions Report.

i

(Da ted)

AiA Document D401" ~ 2003. Copyright © 1992 and 2003 by The Amencan Institute of Architects. All rights reserved. WARPING This ALA” Document is
protected by U5. Copyright Law and Internationa! Treaties. Unauthorized reproduction or distribution of this AIA” Documens, or any portion of it, may 4
rosull in severe civi! ane criminal pesaities, and will be prosecuted to the maximum extent possille under the law This document was produced by AIA
sofiware at 11.1242 ET on 04/02/2019 under Order No.0100024863 which expires an 12/13/2019, and is not for resale

User Notes: (1431096914)

Page Image
Finance Committee - Agenda - 5/15/2019 - P49

Finance Committee - Agenda - 5/15/2019 - P50

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

THE CITY OF NASHUA “The Cate City

Financial Services

Purchasing Department

BPO art SN RRL A MANES IRON OE Ge YE

May 9, 2019
Memo #19-144

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2019 PAVEMENT PRESERVATION PROGRAM-CRACK SEALING (VALUE: $143,865)
DEPARTMENT: 160 ADMIN/ENGINEERING; FUND: BOND

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated April 25, 2019
for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The City Engineer, Board of Public Works (April 25, 2019 meeting) and the Purchasing Department
recommend the award of this contract in an amount of $143,865 to Sealcoating, Inc. of Braintree, MA.

Re pecttully,

Dan Kooken
Purchasing Manager

Cc: S Dookran L Fauteux

229 Main Street e Nashua, New Hampshire 03061 e Phone (603) 589-3330 e Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 5/15/2019 - P50

Finance Committee - Agenda - 5/15/2019 - P51

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
51
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

To:

From:

Re:

D. Motion:
Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: April 25, 2019

Stephen Dookran, P.E., City Engineer
Engineering Department

2019 Pavement Preservation Program - Crack Sealing

To approve the award of the construction contract with for the 2019 Pavement
Preservation Program (Crack Sealing) to Sealcoating, Inc. of Braintree, MA in an
amount of $143,865. Department: 160 Admin/Engineering; Fund: Bond;
Activity: Paving.

The 2019 Pavement Crack Sealing Program is expected te crack seal
approximately 31 miles of streets. This will include cleaning and sealing of
construction and random cracks in the street, Once the cracks are free from debris,
dirt, or vegetation, crack sealant will be applied through a high pressure hose line
and applicator shoe.

Formation of cracks in the roads is inevitable and will develop as the asphalt
pavement undergoes oxidation and deterioration. Once the cracks are sealed with
an approved seaiant, it slows the rate of their formation in pavements over time
and decreases the amount of moisture penetrating the asphalt layers.

The streets selected in this program are in reasonably good condition (Pavement
Condition Index [PCI] in the range of 60 to 99}. This type of treatment is moze of
a routine maintenance with the goal of extending the pavement life and delaying
the need for more extensive treatments. Majority of the streets that are selected in
this program are residential streets and few are arterial/major roads.

The contract was advertised on March 28, 2019 and non-mandatory pre-bid
meeting was held on April 10, 2019. However, no contractor attended. Given
below is the list of the bids:

Sealcoating, Inc. of Braintree, MA $ 143,865
Superior Sealcoat, Inc., Wilmington, MA $ 211,683

Sealcoating, Inc. of Braintree, MA is the qualified low bidder. References have
been checked and were found to be acceptable.

Page Image
Finance Committee - Agenda - 5/15/2019 - P51

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1818
  • Page 1819
  • Page 1820
  • Page 1821
  • Current page 1822
  • Page 1823
  • Page 1824
  • Page 1825
  • Page 1826
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact