Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 17541 - 17550 of 38765

Finance Committee - Agenda - 5/17/2017 - P108

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
108
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

. THE CITY OF NASHUA “The Gate City’

Financial Services

Purchasing Department

May 11, 2017
Memo #17-112

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2017 SEWER REPLACEMENT PROGRAM (VALUE: $3,255,683)
DEPARTMENT: 168 WASTEWATER; FUND: WASTEWATER
ACTIVITY: SEWER REHAB

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated April 20, 2017
for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The City Engineer, Board of Public Works (April 20, 2017) and the Purchasing Department recommend
the award of this contract to DeFelice Corporation of Dracut, MA in an amount of $3,255,683.

Respectfully,

<7 i Cus 4 a
C 1 bers LANE dew
~~l/Dan Kooken
Purchasing Manager

Cc: S Dookran ‘L Fauteux

|
229 Main Street e Nashua, New Hampshire 03061 « Phone (603) 589-3330 e Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 5/17/2017 - P108

Finance Committee - Agenda - 5/17/2017 - P109

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
109
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

To:

From:

Re:

F. Motion:

Discussion:

City of Nashua, Public Works Division
Board of Public Works Meeting Date: April 20, 2017

Stephen Dookran, P.E., City Engineer
Engineering Department

2017 Sewer Rehabilitation Project
Construction

To approve the award of the construction contract for the 2017 Sewer Rehabilitation
Project to DeFelice Corporation of Dracut, MA in the amount of $3,255,683.30.
Funding will be through: Department: 169 Wastewater; Fund: Wastewater; Activity:
Sewer Rehab.

The annual sewer program addresses failing, aged sewers and associated structures and
piping. This 2017 Sewer Rehabilitation Project is expected to replace or line
approximately 1.1 miles feet of sewer mains located in the following streets:

Beard St (Fletcher St to 5 Beard St)

Elm St (West Pearl St to West Hollis St)

Elm St (Kinsley St to 96 Elm St)

Franklin St (from Front St to Main St)

Green St (Winter St to Franklin St)

Jackson St

Lemon St

Lowell St (from 32 Lowell St to 42 Lowell St)

Main St (from Medical Center Dr to Prospect St)

Main St localized repairs (from Allds St to Montgomery Ave)
Monroe St (58 Monroe St to Lake St)

Mulberry St (Chestnut St to Walnut St)

West Pearl St (Walnut St to 123 West Pearl St and intersection of Main St)
Temple St (from Commercial St to Amory St)

Terrace St

Warren St

Work includes replacing sewer service lateral connections to the right-of-way as well as
catch basins and manholes prior to road restoration. Some of the locations will require
the commitment of the utility companies for timely construction. Coordination issues
with abutters and school activity may impact the construction schedule.

Seven contractors attended the mandatory pre-bid meeting on March 22. Three bids
were received on April 12 as follows:

DeFelice Corporation of Dracut, MA $3,255,683.30
S.U.R Construction West, Inc of Winchester, NH $3,672,263.50
Cardillo & Son, Inc of Wakefield, MA $3,846,005.00

Page Image
Finance Committee - Agenda - 5/17/2017 - P109

Finance Committee - Agenda - 3/16/2022 - P38

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Thu, 03/10/2022 - 12:45
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/16/2022 - 00:00
Page Number
38
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031620…

SECOND AMENDMENT TO 14 COURT STREET LEASE FOR UNIT B

This Second Amendment to the 14 Court Street Lease for Unit B, dated as of the latter of
the signatures below, is by and between the City of Nashua, a municipality incorporated in the
State of New Hampshire, having a mailing address of 229 Main Street, Nashua, County of
Hillsborough, New Hampshire 03061 (hereinafter ‘“Lessor”) and Liquid Therapy, LLC, a New
Hampshire limited liability corporation, with a business address of 5 New Haven Drive, #201,
Nashua, New Hampshire 03063 (hereinafter “Lessee”).

WHEREAS, Lessor and Lessee entered into a 14 Court Street Lease for Unit B on July 1,
2018, and entered into a First Amendment to 14 Court Street Lease for Unit B on April 5, 2021
(together, these two documents hereinafter referred to as the “Lease”), whereby the Lessor
granted to the Lessee certain rights in regard to a portion of the property located at 14 Court
Street, Nashua, New Hampshire (hereinafter “Lease Area”);

WHEREAS, the Initial Term of the Lease is July 1, 2018 through June 30, 2023; and

WHEREAS, the Parties wish to further amend certain terms and conditions in the Lease.

NOW, THEREFORE, in consideration of the foregoing and other good and valuable
consideration, the receipt of which is hereby acknowledged, Lessor and Lessee agree as follows:

1. Add the following new subsection entitled “Additional Lease Area” to the existing
Section 1 “Lease of Premises and Term”:
Additional Lease Area. In addition to the original Lease Area leased to Lessee under
the Lease, Lessor hereby leases to Lessee and Lessee hereby leases from Lessor for a
term to be coterminous with the Lease, the premises consisting of approximately 857
square feet of storage on the first floor of the Premises (the “Additional Lease Area”)

as shown on Exhibit A-1 attached hereto and made a part hereof. Lessee shall be

Page Image
Finance Committee - Agenda - 3/16/2022 - P38

Finance Committee - Agenda - 5/17/2017 - P110

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
110
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

The low bid was reviewed and found to be acceptable. DeFelice Corporation has
performed satisfactorily on other sewer projects of this scale in the City including the
2015 Sewer Rehabilitation Project, Burke Street Sewer Improvements, Harbor Avenue
Sewer Separation and Pine and Palm Street Sewer Improvements.

Work is expected to start as early as June to address significant pipe issues. With the
amount of pipe work and utility work in busy locations, this project is expected to go
through two construction seasons.

Page Image
Finance Committee - Agenda - 5/17/2017 - P110

Finance Committee - Agenda - 5/17/2017 - P111

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
111
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

DEFELICE CORPORATION

Phone: 978-452-6967

28 SILVA LANE
DRACUT, MA 01826 Fax: 978-452-6803
USA
To: Nashua, NH Contact:
Address: City Purchasing Department, 229 Main Street, City Hall Phone:
Nashua, NH 03060 Fax:
Project Name: NASHUA (2017 SEWER PROJECT) Bid Number:
Project Location: Bid Date:
fItem # item Description Estimated Quantity Unit Unit Price Total Price}
1A REMOVE EXISTING SEWER AND REPLACE WITH 8" OR 260.00 LF $1.00 $260.00
10" PVC SDR 35 SEWER PIPE
1B REMOVE EXISTING SEWER AND REPLACE WITH 12” 1,620.00 LF $185.00 $299,700.00
PVC SBR 35 PIPE
1c(i} REMOVE EXISITNG SEWER AND REPLACE WITH 15” 880,00 LF $1.00 _ $880.00
SDR 35 PIPE
1E REMOVE EXISTING SEWER AND REPLACE WITH 24° 600.00 LF $185.00 $111,000.00
PVC SDR 35 SEWER PIPE
iF REPLACE EXISTING MH WITH 4 DIAM. SEWER 150.00 VF $1.00 $150.00
MANHOLE
1F(1} REPLACE EXISTING MH WITH 4° DIAM DOGHOUSE 16.00 VF $850.00 $13,600.00
SEWER MANHOLE
1H CONNECT NEW SEWER TO EXIST SMH WITH EXISTING 10.00 EACH $1,750.00 $17,500.00
HOLE
1H(1) CONNECT NEW SEWER TO EXIST SMH BY PROVIDING 10.00 EACH $5,300.00 $53,000.00
NEW HOLE (CORING OR OTHER)
sf CONNECT NEW SEWER TO EXISTING BRICK SEWER 1.00 EACH $65,000.00 $65,000.00
PIPE WITH EXISTING CONNECTION HOLE
0 MH COUPLING STRONGBACK FERNCO AND REDUCERS 15.00 EACH $200.00 $3,000.00
ALL SIZES
iK(1) SLIP LINING 210 LF OF 12" HDPE INCLUDING THREE 1.00 LS $190,000.00 $190,000.00
INSERTA TEES
1K(Q2) INSERTION PIT FOR SLIP LINING 1.00 LS $100,000.00 $100,000.00
1k(12) 12" CIPP LINING 550.00. LF $62.00 $34,100.00
1K(15) 15" CIPP LINING 500.00 LF $72.50 $36,250.00
1K(24) 24" CIPP LINING 470.00 LF $115,25 $94,167.50
1K(18) 18" EGG SHAPED PIPE CIPP LINING 430.00 LF $96.50 $41,495.00
1L(8) 8” CIPP SHORT LINER / POINT REPAIR 8.00 LF $345.00 $2,760.00
1L(6) 6" CIPP SHORT LINER / POINT REPAIR 8.00 LF $256.00 $2,048.00
1L(15) 15" CIPP SHORT LINER / POINT REPAIR 40.00 LF $167.00 $6,680.00
IL(12) 12" CIPP SHORT LINER / POINT REPAIR 8.00 LF $375.00 $3,000.00
iN CUTTING AND REMOVAL OF PROTRUDING LATERAL 1.00 EACH $375,00 $375.00
PIPE UP TO 12° DIAM
10 MANHOLE LINING 120.00 VF $450.00 $54,000.00
1P{1) MANHOLE INVERT Rebuild 1.00 UNIT $1,000.00 $1,000.00
2A REMOVE SEWER SERVICE AND REPOLACE WITH 6" PVC 1,350.00 LF $81.00 $109,350.00
SDR 35 SEWER CONNECTION
2A(1) REMOVE SEWER SERVICE AND REPLACE WITH 8" PVC 30.00 LF $125.00 $3,750.00
SDR 35 SEWER CONNECTION
2B REMOVE DRAIN PIPE AND REPLACE WITH 8-12 " PVC 1,150.00 LF $133.00 $152,950.00
SDR 35 DRAIN PIPE
2B(1) INSTALL 8-12" PVC SDR 35 DRAIN PIPE SDR 35 15.00 LF $235.00 $3,525.00
DRAING PIPE (WHERE THERE IS NO EXISTING DRAIN
PIPE)
2D INSTALL 6" OR 12" PVC CHIMNEY (4-10 VF} 120.00 VF $1.00 $120.00
2F INSTALL FITTING FOR SERVICE OR DRAIN 40.00 EACH $850.00 $34,000.00
CONNECTION TO CIPP LINED PIPES, ALL SIZES
26 10” X 15" PVC WYE 12.00 EACH $425.00 $5,100.00
2H 6" X 15" PVC WYE 15.00 EACH $232.00 $3,480.00
21(1) 6” X 10" PVC WYE 1.00 EACH $102.00 $102.00
2K 8" X 12" PVC WYE 12.00 EACH $233.00 $2,756.00
aL 6" X 12° PVC WYE 30.00 EACH $141.00 $4,230.00
2M ABANDON PIPE OR STRUCTURE WITH FLOWABLE FILL 20,00 CY $426.00 $8,520.00
4/19/2017 12:33:07 PM Page 1 of 3

Page Image
Finance Committee - Agenda - 5/17/2017 - P111

Finance Committee - Agenda - 5/17/2017 - P112

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
112
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

[ztem # Item Description Estimated Quantity Unit Unit Price Total Price|
20 REMOVE EXISTING PIPE BY EXCAVATION OUTSIDE OF 25.00 LF $100.06 $2,500.00
AN ADJACENT TO PROPOSED PIPE TRENCH
2Q REMOVE TOP 3VF OF EXIST STRUCTURE, FILL WITH 5.00 EACH $745.00 $3,725.00
GRAVEL, RESTORE ROAD
ar REMOVE ABANDONED LATERAL, FILL WITH GRAVEL, 20.00 EACH $1,650.00 $33,000.00
RESTORE ROAD
25(12M) ROOT CUTTING , 12" PIPE - MEDIUM ROOTS 1,00 LF $475.00 $475.00
25(18M) ROOT CUTTING 18” PIPE - MEDIUM ROOTS 1.00 LF $475.00 $475.00
3A CATCH BASIN (INSTALL OR REPLACE) 60.00 EACH $3,150.00 $189,000.00
3B ADJUST SMH FRAME AND COVER OR CB FRAME AND 6,00 EACH $150.00 $900.00
GRATE
3c REPLACE 24" CB FRAME AND GRATE 5.00 EACH $460.00 $2,300.00
3D REPLACE 30" MH FRAME AND COVER 5.00 EACH $500.00 $2,500.00
4h TEST PITS 880.00 CY $2,00 $880.00
SA CALCIUM CHLORIDE 34,000.00 LB $0.01 $340.00
58 SILT SACK 100.00 EACH $56.00 $5,600.00
68 CRUSHED GRAVEL 5,800.00 CY $36.00 $208,800.00
6B(1) vn (ROADWAY GRAVELS PRIOR TO BASE 14,500.00 SY $1.75 $25,375.00
6c BINDER (BASE) COURSE MATERIAL HOT SIT 3,000.00 TON $90.18 $270,540.00
PAVEMENT
6D TOP COURSE MATERIAL HOT SITUMINOUS PAVEMENT 970.00 TON $87.34 $84,719.80
6E TEMPORARY BITUMINOUS PAVEMENT 1,210.00 TON $63.00 $76,230.00
6F(1) COMMON EXCAVATION FOR ROADWAY GRAVEL, 8,000.00 CY $12.50 $100,000.00
PAVEMENT AND INCREASE OF CURB REVEAL
6G SAWED BITUMINOUS PAVEMENT 10,500.00 LF $2.00 $21,000.00
6H COLD PLANNING 250.00 SY $13.10 $3,275.00
6! REMOVE AND RESET GRANITE CURBING 2,300.00 LF $25.00 $57,500.00
a) INSTALL VERTICAL GRANITE CURBING 10.00 LF $42.00 $420.00
6K REMOVE AND REPLACE 4" PC CONCRETE SIDEWALK 710.00 SY $48.00 $34,080.00
6K(1) REMOVE AND REPLACE 6" PC CONCRETE DRIVEWAY 30.00 SY $65.00 $1,950.00
6L REMOVE AND REPLACE 2" BITUMINOUS CONCRETE 180.00 SY $34,00 $6,120.00
SIDEWALK
6m HOT BITUMINOUS PAVEMENT HAND METHOD 70.00 TON $120.00 $8,400.00
6N DETECTABLE WARNING AT WHEELCHAIR RAMP 30.00 EACH $1,250.00 $37,500.00
60 REMOVE AND RESET BRICK SIDEWALK 150.00 SY $44.00 $6,600.00
6Q ASBESTOS PIPE REMOVAL (ALL DIAMETERS) 30.00 LF $80.00 $2,400.00
6S REMOVAL OF 6" THICK CONCRETE UNDER PAVEMENT 40.00 SY $25.00 $1,000.00
7A MOBILIZATION 1.00 LS $145,000.00 $145,000.00
8A POLICE OFFICERS 3.00 AL $92,000.00 $92,600.00
8B FLAGMEN 1.00 AL $72,000.00 $72,000.00
8c MAINTENANCE OF TRAFFIC 1.00 LS $150,000.00 $150,000.00
8D RAISED TEMP, PAVEMENT MARKERS DOUBLE FACED 140.00 EACH $5.00 $700.00
8E 4" RETROREFLECTIVE WHITE PAINTED LINES 2,300.06 LF $0.25 $575.00
8F 4" DOUBLE RETROREFLECTIVE YELLOW PAINTED 1,100.00 LF $0.50 $550.00
LINES
8G 12” RETROREFLECTIVE WHITE THERMO LINES 3,330.00 LF $5.00 $16,650.00
aI SIGNAL DETECTOR LOOPS 1,00 EACH $2,200.00 $2,200.00
8) REMOVE AND RESET STOP SIGN 1.00 EACH $25.00 $25,00
oA ASPHALT CEMENT COST ADJUSTMENT 1.00 AL $18,000.00 $28,000.00
98 NIGHT CREW 140.00 HR $1.00 $140.00
oC ASBESTOS MATERIAL REMOVAL DISPOSAL 1.00 AL $25,000.00 $25,000.00
10 DYE TESTING CONNECTIONS 90.00 EACH $25.00 $2,250.00
u CONTINGENCY FOR RAILROAD COORDINATION ON 1.00 AL $20,000.00 $20,000.00
TEMPLE STREET
1A CONTINGENCY FOR CONTAMINATED SOIL 1.00 AL $20,000.00 $20,000.00
EXCAVATION AND DISPOSAL
12(12)} PRE CONSTRUCTION SEWER VIDEOS FOR 100.00 LF $3.00 $300.00
REPLACEMENT OF 12” PIPE INCLUDES ALL
PRECLEANING
1215) PRE CONSTRUCTION SEWER VIDEOS FOR 566.00 LF $4.00 $2,240.00
REPLACEMENT OF 15" PIPE, INCLUDES ALL
PRECLEANING
12(24) PRE CONSTRUCTION SEWER VIDEOS FOR 550.00 LF $4.00 $2,200.00
Page 2 of 3

4/19/2047 12:33:07 PM

Page Image
Finance Committee - Agenda - 5/17/2017 - P112

Finance Committee - Agenda - 5/17/2017 - P113

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
113
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

2017 Sewer Replacement Program

Construction Specifications
and
Contract Documents

Prepared By:

Engineering Department
9 Riverside St
Nashua, NH 03062
Tel: (603) 589-3120
Fax: (603) 589-3169

Prepared For:

City of Nashua, New Hampshire
Division of Public Works
Engineering Department

March 2017

Page Image
Finance Committee - Agenda - 5/17/2017 - P113

Finance Committee - Agenda - 5/17/2017 - P114

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
114
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

TABLE OF CONTENTS

DIVISION
1. INVITATION FOR BID 0... ccc eter cee trees teneeeteeneeteeeees
2. INFORMATION FOR BIDDERS ....000.0.0o occ eee eet tntetneeees

3. BID FORM, BID BOND, BID SCHEDULE, AND CONTRACTOR’S
QUALIFICATIONS 000i eect cee eee eentenieenesneeneneeneneens

4, PERFORMANCE AND PAYMENT BONDS ......000000ococeceeees
5. AGREEMENT ooo. iccccccccccceec eee eec cee cece sees eetsenseeteeteeeseetseeteeneeteeeneey
6. GENERAL CONDITIONS 0.000000 cece etee tte t eee eeteeteenieees
7. SUPPLEMENTARY CONDITIONS 0.000.000 tteetteeetenes
8. EXHIBITS

A. Notice of Award

B. Notice to Proceed

C. Change Order
D. Certificate of Substantial Completion

9. CONSTRUCTION SPECIFICATIONS 10.0.0... ssscssccscssscsccsscssceseesssesseseees

Section Number Description Page Numbers

01 GENERAL REQUIREMENTS
01014 Scope and Sequence of Work 01014-1
01110 Control of Work and Materials 01110-1 to 01110-6
01140 Special Provisions 01140-1 to 011404
01150 Measurement and Payment 01150-1 to 01150-24
01330 Submittals 01330-1 to 01330-2
01331 Documentation 01331-1 to 01331-2
01550 Traffic Control and Signage 01550-1
01570 Environmental Protection 01570-1 to 01570-6
01735 Cutting, Coring and Patching 01735-1 to 01735-3

TC - 1 of 2

Page Image
Finance Committee - Agenda - 5/17/2017 - P114

Finance Committee - Agenda - 5/17/2017 - P115

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
115
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

Section Number

02

02085
02111

02252
02300
02324
02441

02451
02518
02530
02533

02534
02619
02631
02650
02650A
02745
02745A
02769

02800
02930

Description
SITE WORK

Polyvinyl Chloride Gravity Pipe and Fittings
Removal of Undocumented Asbestos from
Underground Utilities

Support of Excavation

Earthwork

Rock Excavation and Disposal

Cleaning, Television Inspection, and Testing of New
Pipelines

Flaggers and Uniformed Officer for Traffic Control
Tracer Tape

Buildings Connections and Drop Connections
Connections to Existing Structures

Or Sewer Mains

Fill Cement Sewer Pipe (To Be Abandoned)
Replacement of Existing Drains

Precast Manholes and Catch Basins

CIPP Lining

Cured in Place Point Repair

Paving and Reclaimation

Loop Detectors, and Pavement Markings
Pneumatic Assisted and Segmental Static HDPE
Sliplining

Manhole Rehabilitation

Detectable Waming at Handicap Ramp

TC -2o0f2

Page Numbers

02085-1 to 02085-4

02111-1 to 0211147
02252-1 to 02252-2
02300-1 to 02300-10
02324-1 to 023244

0244 1-1 to 024414
0245 1-1 to 0245 1-2
02518-1 to 02418-2
02530-1 to 02530-2

02533-1 to 02533-2
02534-1

02619-1 to 02619-2
0263 1-1 to 02631-8
02650-1 to 02650-10
02650A-1 to 02650A-4
02745-1 to 02745-8
02745A-1 to 02745A-2

02769-1 to 02769-18
02800-1 to 02800-9
02930-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P115

Finance Committee - Agenda - 5/17/2017 - P116

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
116
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

DIVISION 1

INVITATION TO BID

Page Image
Finance Committee - Agenda - 5/17/2017 - P116

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1751
  • Page 1752
  • Page 1753
  • Page 1754
  • Current page 1755
  • Page 1756
  • Page 1757
  • Page 1758
  • Page 1759
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact