Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 12231 - 12240 of 38765

Board Of Aldermen - Agenda - 8/11/2020 - P83

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

=

tobe tit

esas wt i b

Vi Design Services & Project Management of Downtown Riverfront implementation
October 31, 2019

Halvorson may also consider water features (fountain) for further design by specialty
consultants by amendment.

Product: Prepare up to three (3) design alternatives including plans, profiles, critical sections,
and precedent images as appropriate to define the proposed improvements,

Lead Consultant: Halvorson
Support from: VHB, HLT

1.4.5 - New Cantilevared Boardwalk & Ramp:

This important sub area includes the exploration of a new cantilevered ramp that would
connect the lower Renaissance Park to the upper level Main Street anc park. The
expectation is that the boardwalk structure would be similar to the existing cantilevered
boardwalk at the Peddler’s Daughter building. This may include a ramp and/or a stair
system to account for the grace change. If determined feasible, this element would be
advanced through design. If determined infeasible, this element would be removed and
possibly supplemented by sidewalk enhancements that connect Renaissance Park via
Water Street to Main Street,

Due diligence siforts by HL Turner during this phase will include interior building
inspections to determine the potential for attaching the cantilevered boardwalk to the
building.

Product: Plans and sections and precedent images as appropriate to define the proposed
improvements.

Lead Consultant: HL Turner

Support from: VHB, Halvorson, Lumen Design Studio, Fiizemeyer & Tocci

1.4.6 - Renovation to Bicentennial Parl:

Renovations to this small park adjacent to Main Street may include u pdates that refresh
the streetscape materials and furnishings to tie together the aesthetics of the Riverfront
design with the Park. There may be opportunities to update how public art is displayed in
the park and lighting and ADA modifications may also be appropriate. The work does not
include modifications to the existing railings or retaining walls other than modifications
that may be pari of the cantilevered boardwalk in area 5 above.

Product: Provide two (2) design alternative including plans, sections, sketches and precedent
images as appropriate to define the proposed improvements.

Lead Consultant: Halvorson
Support from: Lumen Design Studio, Fitzemeyer 8 Tocci, VHB

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P83

Board Of Aldermen - Agenda - 8/11/2020 - P84

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

nb Design Services & Project Management of Downtown Riverfront Implementation
October 31, 2015

1.4.7 - New Cantilevered Boardwalk:

This important sub area includes the exploration of a new cantilevered boardwalk that
would connect Main Street to the existing trail in area 9. The expectation is that the
boardwalk structure would be similar to the existing cantilevered boardwalk at the
Peddler’s Daughter building, If determined feasible, this element would be advanced
through design. if determined infeasible, this elament would be removed and possibly
replaced by pecesitrian enhancements in sub-area 8.

Due diligence efforts by HL Turner during this first phase will include interior and exterior
building inspections to determine the potential for attaching the cantilevered boardwalk to
the building.

Product: Plans, sections, sketches and precedent images as appropriate to define the
proposed improvements.

Lead Consultant: HL Turner
Support from: Halvorson, VHB, Lumen Design Studio, Fitzemeyer & Tocci

1.4.8 - Mulipurpese Path adjacent to Railroad

The potential to introduce a multipurpose path area adjacent to the existing Railroad to
provide a formal multimodal connection to Main Street by Riverside Barbeque Company
will be studied in this sub-area if it appears thet the cantilevered boardwalk in the above
section will not be feasible. This stucly will explore an accessible route from Main Street,
paralleling the tracks heading east towards the parking lot and existing trail. This would
likely involve redefining the paved surfaces to clearly demarcate the multiuse path apart
irom the railroad track, relying on obtaining rights to do so. If determined io be feasible,
this would be advanced through design development only if it is determined that the
cantilevered boardwaik alternative is not feasible.

Product: Provide plans, typical crass sections, and sketches as appropriate to define the
proposed improvernenis.

Lead Consultant: VHB
Support from: Halvorson

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P84

Finance Committee - Agenda - 1/19/2022 - P30

By dnadmin on Sun, 11/06/2022 - 21:39
Document Date
Thu, 01/13/2022 - 13:22
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/19/2022 - 00:00
Page Number
30
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011920…

. Cross

'ns& U RAN CE

October 29, 2021

Schroeder Construction Management, Inc.
2 Townsend West, Unit 3

Nashua, NH 03063

FID#743150716

Re: Experience Modification Factor

As of
8/1/2021 .80
8/1/2020 79
8/1/2019 79
Sincerely,

Anche o Nickle

Andrea Nicklin, ACSR, AAI-M, AIS, CRIS
Commercial Lines Director of Training
anicklin@crossagency.com

Page Image
Finance Committee - Agenda - 1/19/2022 - P30

Board Of Aldermen - Agenda - 8/11/2020 - P85

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

at
\ ;
i

vnb Dasign Services & Project Management of Downtown Riverfront implementation
October 31, 2019

1.4.9 - Multipurpose Trail

This subarea includes updates to the existing trail thet may include: reconstruction and
repaving of the trail if necessary or desired, pedestrian lighting, trail furn ishings, smal)
plazas for overlooks, and selected locations for public art. This may also include screening
of the power substation. VHB will rely on information from HL Turner related to floodplain
elevations and restrictions and will likely avoid adding fill as part of any trail enhancements
if possible,

VHB will also examine potential landscape enhancements along the river's edge to
enhance aesthetics and control invasives.

Product: Plans, typical crass sections, sketches and one (1) perspective as appropriate to
define the proposed improvemenis.

Lead Consultant: VHB
Support from: Halvorson, HL Turner, Lumen Design Studio, Fitzemeyer & Tocci

1.4.10 - New Floating Dock + Access Ramp.

This area will incluce the assessment and conceptual design of a new pedestrian ramp and
floating dock to provide improved river access. The ramp and dock are envisioned to be
floating to avoid concerns with filling within the floodway, and removable to prevent
winter damage. HL Turner will conduct early due diligence to determine the configuration
and feasibility of this structure.

Product; Plans, sections and sketches as appropriate to define the proposed improvements.

Lead Consultant HE Turner
Support from: VHB, Halverson

1.4.11 - Existing Trail Improvements

This sub area may include updates to the existing trail that would include: reconstrucéion
and repaving of the trail where appropriate or necessary, lighting, trail furnishings, small
plazas for overlooks or pause places, and selected locations for public art. This area may be
explored for potential flood storage in upland areas if flood mitigation is needed due to
proposed filling elsewhere.

Product; Plans, typical cross sections, sketches and one (1) perspective as appropriate to
define the proposed improvements.

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P85

Board Of Aldermen - Agenda - 8/11/2020 - P86

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

at
Et

"
vhb Design Services & Project Management of Downtown Riverfront implamentation
October 31, 2018

Lead Consultant VHB
Support jrom:; Halverson, HE Turner

1.4.12 - Riverbank Restoration + New Access

This sub area will likely include enhancing the space between the paved trail and the
water's edge. VHB will examine potential improvements along the river's edge to enhance
aesthetics, improve visibility and access to the river, conduct bank stabilization, and
potentially treat stormwater. Thera may also be opportunities for small overlooks, and
selected locations for display of public art, signage and lighting. The City is currently
addressing the invasives problem in advance of this project, but there may be
opporiunities to modify the ground cover on the banks to mitigate invasives long term.

VHB will rely on guidance from HL Turner on floodplain elevations and restrictions on
filling,

Product: Include up to twa (2) design aliernatives including plans, tynical cross sections,
sketches and one (1) perspective as appropriate tc define the proposed improvements.
Lead Consultant: VHB

Support jrom: HL Turner, Halverson

1.4.13- ADA Accessible Ramp to Cotton Transfer Bridge

An ADA accessible bike/pedesirian ramp will be developed to connect the ground level
multiuse path up to the Cotton Transfer pedestrian bridge. The intent will be to utilize
similar design elements as the existing ADA ramp on the opposite side of the river. The
work will be done with consideration for avoiding impacts to the floodplain and tloodway.
VHB will complete the cesign with input from Halvorson and will coordinate with Lumen
Design Studio and Fitzemeyer & Tocci for lighting the structure. This project component
may be a good candidate for an accelerated schedule and “early success" assuming
environmental permitting will not hold it back.

Produci: Provide up to two (2) design alternatives including pians, sections and sketches as

appropriate to define the proposed improvements.

Lead Consultant: VAB
Support from: HL Turner, Lumen Design, Fitzemeyer & Tocci

=}

head

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P86

Board Of Aldermen - Agenda - 8/11/2020 - P87

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

ho Design Services & Project Management of Downtown Riverfront Implementation

October 31, 2014

L414 - Concapt Design for Trail.

This sud area includes the concepiual design of a future trail that will connect wesierly
toward the broad Street Parkway and possibly beyond. The design will also account for a
potential future multi-use bridge conneciion across the river, Including planning for likely
structure support locations. This area will require close coordination with the land owner to
Getermine how the trail would integrate into their development plans.

Product: Provide up io two (2) design alternatives including plans, typical crass sections, and
sketches as appropriate to define the proposed improvemenis,

Lead Consultant: VHB
Support from: Halvorson, HSI

1.5 River Hydrology

Any of the design that would result in fill within the floodplain and Tloodway must be
coordinated with HL Turner since they will maintain the river hydraulics model.

HL Turner will develop 2-, 5-, 10-, S0-, 100- and 500- yaar peak Nashua River flows using
data/analysis of stream flow records from the USGS" Pepperell, MA gage, transposed downriver
to the project site.

HL Turner will create a project design river hydraulic mode! using the current effective FEMA
HEC-RAS model, and determine flow-water surface elevation protiles for the 2~through 500-year
peak river flows, and the FEMA regulatory floodway zone.

Based on ihe agreed upon project design flocd resiliency and structural criteria, HL Turner will
select and insert the design Concept Plan features into the project design hydraulic river model.

HL Turner will provide VHB and the Project Team the results of the hycrautic impacts (ie, water
surface elevation rises, floodway impacts and river velocity increases) identifying impacts and
recommendations on how to deal with the impacts (le. removal or reorientation of certain plan
features).

Lead Consultant: HL Turner
Support jram: VHB, Halyosan
Estimated Duration: 10 weeks

1.6 Lighting

itis understood that the majority of the conceptual Riverfront lighting design has already been
advanced under an existing City contract by Lumen Design Studios with support from
Fitzemeyer & Tocci for power supply. There may still be a need to involve these team members

jt
hB

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P87

Board Of Aldermen - Agenda - 8/11/2020 - P88

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

hb Design Services & Project Management of Downtown Riverfront Implementation

October 31, 7019

as the conceptual design of the entire project progresses. It will be important to integrate their
current lighting designs into any new work planned under this profect. The current
understanding ts that most if not all of the proposed Riverfront lighting will be built as part of
this project.

Product: Plans, details and images to illustrate the proposed conceptual imprayemenis.

Lead Consultant: Lumen Design Studio
support from: Fitzemeyer & Tocci, VAB
Estimated Duration: 8 weeks

i7 Wayfinding

The City is currently advancing a downtown waytinding plan designed by others. For the
Riverfront project VHB will at most identify the conceptual recommended locations for
wayfinding signage during the conceptual Stage, but actual wayfinding sign development will be
advenced in a later phase. For Phase 1 the waytinding efforts will only include identifying
conceptual sign placement locations and potential general conteni,

Lead Consultant: VAB
Support from: Halvorson
Estirnated Duration: 1 week, toward the end of Phase 1

LS Permittina Considerations

Permit applications will be prepared after Phase 2, but during Phase 1 the design team will be
cognizant of the potential permitting implications of every aspect of the design when important
design Gecisions are being made. Section 7 of the Riverfront Plan included a relatively
exhaustive evaluation of the permitting landscape for this project. As the design prograsses,
however, VHB environmental specialists will advise tha design team relative to any permitting
implications. In addition, The HL Turner Group will provide crucial input on any in-stream or
shoreline work that could potentially affect flood levels, # su b-projects are identified for
accelerated schedules it will be important to demonstrate that they have independent utility and
can be permitted on their own rather than waiting for the entire project to be permitted.

Lead Consultant: VHB
Support jrom: HL Turner, Halvorson
Estimated Duration: throughout Phase 1

1.9 Conceptual Cost Estimating

VHB will manage and assemble cost estimates for each of the project components fram the
design team members in their respective disciplines, The HL Turner Group will provide costs for

Jaa

Bo

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P88

Board Of Aldermen - Agenda - 8/11/2020 - P89

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

ho Design Services & Project Management of Downtown Riverfront Implementation

October 31, 2019

the propased boardwalk and in-water features, and VHB and Halvorson will provide costing for
site-civil, ADA ramp, paths, streetscape, and landscape features. Cost estimates will be
conceptual at this early stage and based on major tems and appropriate contingencies. We
anticipate aligning the cost estimates with each of the so called “sub-projects” that evolve from
the conceptual design such that they could easily be advanced on different tracks to
construction if a need arises due to funding or permitting constraints or a desire by the City to
break out individual projects.

The design team will recommend contingency amounts in light of rapidly rising construction
pricing. Experienced engineering and design staff will perform quality reviews of the estimates
to help ensure that relevant factors affecting price are considered. VHB will also advise the City
on potential risk factors associated with various project components because of the relatively
limited design development during the conceptual design phase,

Product: liemized conceptual construction cost estimates broken down by sub-project areas.

Lead Consultant: VHB
Support from: All
Estimated Duration: 3 weeks at the end of phase 1

1.120 Pubiic Engagement

Thé proposed approach to public engagement during Phase 1 will be multipronged and
relatively low key, as advised by the City. We do not envision nolding workshops since there was
heavy public involvement during the development of the Riverfront Plan. For Phase 1 we instead
propose to hold one public meeting that will essentially be a project update and an opportunity
fer additional input and interaction. We also propose to participate in one City Leaders meeting
at which the design team will present to the City's ‘eacdership and internal stakeholders.

Design team members will also opportunistically attend other events in the City to show a
presence and to informally interact with the public. The level of effort for this task is assumed to
be minima! and would typically include staffing a table with project graphics at events such as
farmer's markets or other seasonal public events. Attendance at two events is assumed.

The last method of engagement would include posting project information on the city’s website,
as opposed to using the services of a third-party public relations firm such as co-Urbanize. We
assume attendance at up to three public events during the Conceptual phase.

The design team understands the importance of economic development and will provide the
City with graphics and other collateral materials that can be used to promote the riverfront
project to developers and prospective tenants. This will include renderings and 3D visualizations

I
Gu

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P89

Board Of Aldermen - Agenda - 8/11/2020 - P90

By dnadmin on Sun, 11/06/2022 - 23:06
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
90
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Ab Design Services & Project Management of Downtown Riverfront implementation

October 31, 2079

that will have alreacly been developed as part of the conceptual cesign and specifically for the
pubiic engagement process and will also be used for social media curing this phase.

Lead Constliani: VAB
Support from: Halverson, HSI
Estimated Duration: Continuous, and public and stakeholder meetings in second half of Phase 1.

Li2 Phase 1 Project Meatings

The design team will attend reguiarly scheduled project meetings with the City at which a range
of design and project cevelopment tapics will be discussed. These meetings will generally be bi-
weekjy conference calls, with an assumed three (3) face-to-face meetings with key design team
and City staff members for when plans, graphics and campiex subjects will be reviewed, One (1}
stakeholder meeting is included as well. We also envision informal drop-in meetings as needed
and sharing desktops electronically to seek answers quickly during the design.

One (1) working Design Team Meeting is included near the start of the project to collaboratively
work through detailed design scope and tasks. We assume there will be eight (8) scheduled
project coordination calls with the City during Phase 1.

Lead Consultant VHB
Support from: AH
Estimated Duration: Throughout Phase 1

COMPENSATION

VrIB and its subconsultants will perform the Scope of Services on a time and materials basis. The
estimated Upset Limit for this Scope of Services is $ 437,653. including labor, overhead, profit
and direct expenses. VHE direct expenses will be billed at their actual cost without markup and
VEB's subconsultanis will be billed at their actual costs plus 5% administrative fees.

VHB $ 138,690.
Halvorson design § 68455.
HL. Turner § 99.560.
Hayner/Swanson Inc (HS) $ 82,100.
Lumen Design Studio § 8,550.
Fitzemeyer & Tocci $ 26,158.

Acministrative Fees on VHB Subconsultants (5%) $ 14,200.
PHASE 1 CONTRACT AMOUNT: § 437,653.

14

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P90

Board Of Aldermen - Agenda - 8/11/2020 - P91

By dnadmin on Sun, 11/06/2022 - 23:06
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
91
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

et

‘
ee

vivo Design Services & Project Management of Downtown Riverfront Implementation
duly 31, 2020

AMENDMENT FOR PROFESSIONAL SERVICES
BETWEEN
VANASSE HANGEN BRUSTLIN, INC.
AND
THE CITY OF NASHUA, NEW HAMPSHIRE

DOWNTOWN RIVERFRONT PROJECT

July 31, 2020

The following amends the existing agreement between the City of Nashua and Vanasse Hangen
Brustlin, Inc. (VHB) for the Nashua Downtown Riverfront Project dated 12/12/2019. This
amendment is subject to the terms and conditions of the original contract.

PROJECT LIMITS

The project limits have expanded from those described in the original contract. By way of this
amendment the project boundaries along the Nashua River are expanded to include the
northern riverfront east of the Margaritas restaurant to and including the pedestrian walkway on
the PanAm bridge, and along the south side of the river from Main Street east past the PanAm
bridge to Temple Street. The project area continues to include the north and south sides of the
river from Pine Street and the Broad Street Parkway eastward to Main Street.

SCOPE OF SERVICES

The scope of services covered by this amendment inciudes the work under the following phase:
2 Phase 2— Preliminary Design (Schematic Design)

The scope of services for Phase 3 Final Design (Design Development) will be added by contract
amendment at a later date when the scope is well defined.

PHASE 2 — PRELIMINARY DESIGN

The preliminary design phase will build on the work and design decisions made in the phase 1
conceptual design phase. Whereas the conceptual design was largely a 2-dimensional (2D)
design with assorted sketches, details, visualizations and plans, the preliminary design will evolve
into a 3-dimensional (3D) design. This will be done using the survey base plans provided by
rlayner-Swanson Inc. (HIS) working directly for the City. Preliminary design will only commence

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P91

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1220
  • Page 1221
  • Page 1222
  • Page 1223
  • Current page 1224
  • Page 1225
  • Page 1226
  • Page 1227
  • Page 1228
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact