Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 12191 - 12200 of 38765

Board Of Aldermen - Agenda - 8/11/2020 - P46

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
46
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

52.0 Elevator Sections 3/18/20
$2.1 Stair Sections 3/18/20
§2.2 Entry Sections & Details 3/18/20
PLUMBING

P1.00 Basement Sanitary & Vent Piping Plan 3/18/20
P1.01 First Floor Sanitary & Vent Piping Plan 3/18/20
P1.02 Second Floor Sanitary & Vent Piping Plan 3/18/20
P2.00 Basement Domestic Piping Plan 3/18/20
P2.0i First Floor Domestic Piping Plan 3/18/20
P2.02 Second Floor Domestic Piping Plan 3/18/20
P3.00 Detail Legend & Schedules 3/18/20
P4.00 Specifications 3/18/20
MECHANICAL

M1 Floors 1-3 and Attic HVAC Plans 7/15/20
M2 IMC 2015 Ventilation Calculations 7/15/20
M3 HVAC Schedules 7/45/20
M4 HVAC Specification & Seq. of Ops. 7/15/20
ELECTRICAL

E0.01 Electrical Notes and Legend T5120
E0.02 Specifications & Schedules 7/15/20
E0.03 Equipment Schedules & Notes T/15/29
E1.O1 Basement Level Lighting Plan 7/15/20
E1.02 Level 1 Lighting Plan 7/15/20
E1.03 Level 2 Lighting Plan 7/15/20
F1.04 Attic Level Lighting Plan 9415/20
E2.01 Basement Level Power Plan 7/15/20
E2.02 Level 1 Power Plan 7/15/20
E2.03 Level 2 Power Plan T/V3/20
E2.04 Attic Level Power Plan 7/15/20
E3.01 Basement Level Mech Power Plan 7/15/20
E3.02 Level | Mech Power Plan 7/15/20
E3.03 Level 2 Mech Power Plan 7/15/20
£3.04 Attic Level Mech Power Plan 7/15/20
E4.01 One-Line Power Riser Plan 7/15/20
FAQ.O1 Fire Alarm Legend and Details 7/15/20
PAI.O1 Basement Level Fire Alarm Plan 7/15/20
FA1.02 Level 1 Fire Alarm Plan 7/15/20
FAL.03 Level 2 Fire Alarm Plan 7/15/20
FAIL.04 Attic Level Fire Alarm Plan 7/15/20
FA?.01 Fire Alarm & 2-Way Voice Evac. Riser 7/15/20

Martini Northern, LLG
10 Main Street
Newfields, NH 03856

www. martninorthern.com

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P46

Board Of Aldermen - Agenda - 8/11/2020 - P47

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
47
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

sienna Nashua Public Health
CONTRACT 18 Mulberry Street

DOCUMENTS Nashua, NH

July 30, 2020
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
4.01 DIVISION 06 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0110 - Table of Contents
B. 003100 - Available Project information
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 07 1000 - Summary
Of 3329 - Sustainable Design Reporting
01 4000 - Quality Requirements
07 4100 - Regulatory Requirements
01 4533 - Code-Required Special Inspections
01 5000 - Temporary Facilities and Controls
071 6000 - Product Requirements
01 6116 - Volatile Organic Compound (VOC) Content Restrictions
Ot 7000 - Execution and Closeout Requirements
01 7419 - Construction Waste Management and Disposal
01 7800 - Closeout Submittals
01 9113 - General Commissioning Requirements
01 9174 - Commissioning Authority Responsibilities
2.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
B. 02 6500 - Underground Storage Tank Removal
2.03 DIVISION 03 -- CONCRETE
A. 03 3000 - Cast-in-Place Concrete
2.44 DIVISION 04 -- MASONRY
2.95 DIVISION 05 -- METALS
A. 05 1200 - Siructural Steel Framing
05 2100 - Siee!l Joist Framing
05 4000 - Cold-Formed Metal Framing
05 5000 - Metal Fabrications
05 5133 - Metal Ladders
F. 05 5213 - Pipe and Tube Railings
2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry
B. 06 2000 - Finish Carpentry
2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 0150.19 - Preparation for Re-Roofing
B. 7 1300 - Sheet Waterproofing
C. 07 2100 - Thermal Insulation

rAcST TammMoo w

=

mu © ow

Nashua Public Health 00 0710-4 TABLE OF CONTENTS

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P47

Board Of Aldermen - Agenda - 8/11/2020 - P48

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
48
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

2.08

2.69

2.10

BOZEr ALS TaAMNMog

07 2119 - Foamed-in-Place Insulation

0? 2126 - Biown Insulation

OF 2129 - Sprayed Insulation

Q7 2500 - Weather Barriers

07 5400 - Thermoplastic Membrane Roofing
07 6100 - Sheet Metal Roofing

07 6200 - Sheet Metal Flashing and Trim

07 7100 - Roof Specialties

0? 7123 - Manufactured Gutters and Downspouis
OF 7200 - Root Accessories

07 8123 - Intumescent Fire Protection

07 8400 - Firestopping

O7 9200 - Joint Sealants

DIVISION 08 «+. OPENINGS

ZONMOO@ >

08 1413 - Hollow Metal Doors and Frames
08 1416 - Flush Wood Doors

68 3100 - Access Doors and Panels

08 4229 - Automatic Entrances

08 6200 - Wood Windows

08 5659 - Service and Teller Window Units

08 7100 - Door Hardware (Hardware Section to be REVISED and Schedule to be Reissued}

08 8000 - Glazing

. 08 9700 - Louvers

DIVISION 09 -- FINISHES

ronmnmMmogd ww PS

09 2116 - Gypsum Board Assemblies

09 3000 - Tiling

69 5100 - Acoustical Ceilings

09 6429 - Wood Strip and Plank Flooring
09 6500 - Resilient Flooring

69 8400 - Acoustic Room Componenis
9 9113 - Exterior Painting

09 $123 - Interior Painting

DIVISION 10 -- SPECIALTIES

moo wp

A

10 1400 - Signage

10 2113.19 - Plastic Toilet Compartments

10 2800 - Toilet, Bath, and Laundry Accessories
10 4400 - Fire Protection Specialties

10 5100 - Lockers

10 5617 - Wall Mounted Standards and Shelving

2.41 DIVISION 14 -- EQUIPMENT
A.

11 5213 - Projection Screens

Nashua Public Health 00 0110-2

TABLE OF CONTENTS

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P48

Board Of Aldermen - Agenda - 8/11/2020 - P49

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
49
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

2.12 DIVISION 12 -- FURNISHINGS

A. 12 3600 - Countertops
2.13 DIVISION 13 -- SPECIAL CONSTRUCTION
2.14 DIVISION 14 -- CONVEYING EQUIPMENT

A. 14 2100 - Electric Traction Elevators

B, 14 4250 - Vertical Wheelchair Lifts

14 2400 - Hydraulic Elevators

2.15 DIVISION 21 -- FIRE SUPPRESSION TO BE ISSUED SEPARATELY
2.16 DIVISION 22-- PLUMBING ON DRAWINGS
2.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) ON DRAWINGS
2,18 DIVISION 25 -- INTEGRATED AUTOMATION
2.19 DIVISION 26-- ELECTRICAL ON DRAWINGS
2.20 DIVISION 32 -- EXTERIOR IMPROVEMENTS

A. 32 3223.- Segmental Retaining Walls
2.21 DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT

END OF SECTION

Nashua Public Health 00 0110-3 TABLE OF CONTENTS

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P49

Board Of Aldermen - Agenda - 8/11/2020 - P50

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Exhibit “B”
ALLOWANCES

The Owner and MN agreed the work described below to be treated as individual allowances, The value of
this work has been incorporated into the Contract Amount. The value of the work has been estimated by
MN based on availabie information. The actual cost of the work will vary from the estimate.

The cost of the work will be tracked and reported to the Owner on a biweekly basis in a format te be
mutually agreed upon by the Owner and MN.

The final cost of this work incliding fee and any additional general conditions will be a change order to the
Contract Amount. In the event of savings, the Change Order shall decrease the Contract Amount. In the
event of additional costs, the Change Order shall increase the Contract Amount.

# Title of the AHowance Description of the Allowance Value
To maintain adequate inside environment so progress
1 |Temporary Heat in the project can continue. Includes heater,
connections and fuel $98,726
2 |Roof Deck Infill and support angles at old roof hatch location $800
3 |Fix Fire Escape Railings To straighten and make necessary steel repairs $2,000
, . Misc. patching of existing walls to remain as necessary
4 [Drywall Patching for a complete finish $10,000
5 |New Access Controls Includes access hardware for 7 doors at $1500 each,
installed by city vendor $10,500
6 New Panels for Access Control panel which controls access to 4 doors, two
Controls panels included at $1500 each installed by city vendor $3,000
7 {Panic Button One panic button included at $1,000 each. Installation
, by city vendor $1,000
Floor preparation as necessary to meet the
8 [Floor Prep requirements of the flooring manufacturer $10,000
Total Estimated Value of the Allowances | $136,020

Martini Northern, LLC
10 Main Street
Newtields, NH O28&6

wow martininorthern.com

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P50

Board Of Aldermen - Agenda - 8/11/2020 - P51

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
51
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Project Name

Exhibit "C July 30, 2020
ASSUMPTIONS CLARIFICATIONS

NASHUA PUBLIC HEALTH

: NASHUA PUBLIC HEALTH - GMP

Estimate #: 4110
SCOPE CLARIFICATIONS
Based Upon:
Drawings: See Exhibit "A" Dated: 7/16/2020
Specifications: Dated:
Addenda: Dated:

DIVISION 1 (GENERAL CONDITIONS):

The contract documents are assumed to be coordinated by the design team prior to
this bid. Standard coordination of the Mechanical and Electrical trades is included in
our bid te ensure proper installation of piping, equipment, fixtures and ductwork.
Sufficient routing areas, adequate space, adequate access to equipment, proper
sizing, and full coordination with the architectural intent of the project is the
responsibility of the design team

if the Owner, prior to or after contract execution, assigns Martini Northern (MN) a
subcontractor or supplier, whether or not MN was informed of this fact during
contract price settlement, MN agrees to endeavor to execute a mutually agreeable
contract with the sub or supplier and manage the firm's work. MN is not to be held
responsible for non-performance by this sub or supplier unless such non-performance
is due fault of MN. Such non-performance items which are not MN's responsibility
and are the responsibility of the owner, include but are not limited to: unreasonable
contract terms demands, improper insurance coverage, lack of manpower, improper
materiais, non-conformance to the contract documents, failure to keep up with the
job schedule, improper bonding, improper or untimely submittals, unqualified
personnel, improper safety, etc. The owner agrees to take responsibility for such non-
performance, assist in the resolution, and be resposible for applicable increases in the
Contract Sum and schedule.

ithas been assumed the Owner shall contract directly with and pay for an agency to
test materiais as required by the Contract Documents. Testing shall include but not
be limited to soils, concrete, steel, masonry, etc. The Contractor shall coordinate
testing agency as required by the Contract Documents. The cost of testing is
excluded fram the Contract Sum.

Martini Northern’s failure to obtain a Certificate of Occupancy shall not prohibit
Martini Northern from achieving Substantial Completion unless the failure to obtain
the Certificate of Occupancy is a direct result of negligence or non-performance by
Martini Northern.

We reserve our rights to negotiate the terms and conditions of the proposed
contract.

Assumption that we will get parking passes for MN employees as well as pre-

Includes: approved sub contractors to park in parking lot across the street
includes: Use of parking area across street for laydown area as well as parking
Includes: "Builder's Risk" insurance

Excludes: Job Trailer, Super will utilize space within the building

7/30/2020

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P51

Board Of Aldermen - Agenda - 8/11/2020 - P52

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
52
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Exhibit °C July 30, 2020
ASSUMPTIONS CLARIFICATIONS

NASHUA PUBLIC HEALTH

utility company charges and backcharges. We exclude costs related to power

Excludes: consumption as a result of the construction process

Excludes: utility company charges and backcharges if required to raise or cover power lines for
lifts to be used to do work around the exterior of the building

Excludes: Future Tariffs imposed that affect costs of materials for the duration of this project

DIVISION 2 {DEMOLITION}:
Abatement of all asbestos items requiring removal per the survey provided by RPF

includes: .
Environmental
includes: Trash chute
Adding ice and water shield after abatement and before new roof is installed to keep
Includes: . .
it weather tight.
Excludes: removal and disposal of hazardous materials found not listed in the survey

DIVISION 3 (CONCRETE):

DIVISION 4 (MASONRY):

DIVISION 5 (METALS):

Includes: $800.00 Allowance for roof deck infill and support angles at old roof hatch location
includes: $2,000.00 Allowance for fixing fire escape railings
Excludes: New Exterior swing gate. Keep existing

DIVISION 6 (ROUGH CARPENTY):

DIVISION 6 (MILLWORK/FINISH CARPENTRY):

Includes: New vanity in Large exam room, instead of modifying existing

includes: reinstall & modification of cabinets and countertops in both labs

Includes: New Solid surface desk and 4 drawer cabinet in Nurses office

Excludes: Wire shelving, closet shelving and rods, as well as any shelving in storage rooms

DIVISION 7 (INSULATION, FIREPROOFING, FIRESTOPPING, SEALANTS & WATERPROOFING):

DIVISION 7 (ROOFING):
includes: 0.080 thick TPO roof with 30 year warranty

DIVISION 7 (SIDING):
Not Applicable - no scope

7/30/2020

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P52

Board Of Aldermen - Agenda - 8/11/2020 - P53

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Exhibit °C July 30, 2020
ASSUMPTIONS CLARIFICATIONS

NASHUA PUBLIC HEALTH

DIVISION 8 (DOORS, FRAMES & HARDWARE):

Includes: 27 new Hollow metals frames
Incluces: 12 new steel doors
Includes: 56 new wood doors

DIVISION 8 (GLASS & GLAZING):

Includes: 3 new bullet resistant transaction windows
new Pella Lifestyle series window with Integral blinds. The blinds are manufacturered
Includes: out of the country and will be delayed. Pella will install the blinds once they come in,

which could be after occupancy.

DIVISION 9 (DRYWALL):
Includes: $10,000.00 Allowance for Patching

DIVISION 9 (ACOUSTICAL CEILING TILES}:

DIVISION 3 (FLOORING):
Includes: $10,000.00 allowance for floor prep

DIVISION 3 (PAINTING):

Exciudes: Finishes at window sashes

Excludes: Painting new wood doors, they come prefinished with clear coat

DIVISION 10 {SPECIALITES}:

includes: 5 feminine napkin disposals in bathrooms, not shown in drawings
Includes: Metal wrap for 2 columns outside rear entrance

Includes: New raised letter sign on exterior canopy over rear entrance

Excludes: Projection screen in conference room. Supplied and installed by owner

DIVISION £4 {EQUIPMENT}:
Excludes: All equipment; to be supplied and installed by owner

DIVISION 12 (FURNISHINGS):
Not applicable - no scope

DIVISION 14 (CONVEYING EQUIPMENT):
Includes: Single phase Hydraulic machine room less elevator

DIVISION 21 (EFRE SUPPRESSION):
Includes: New wet / dry sprinkler systems

7/30/2020

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P53

Board Of Aldermen - Agenda - 8/11/2020 - P54

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
54
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Excludes:

Exhibit "C" July 30, 2020
ASSUMPTIONS CLARIFICATIONS

NASHUA PUBLIC HEALTH

Removal of existing riser system, including backflow preventer, dry pipe valve, air
compressor, fire department connection, and main drain

Excludes:

centering sprinkler heads on ceiling tiles. Existing are not centered now.

DIVISION 22 (PLUMBING):

DIVISION 23 (HVAC):

DIVISION 26 (ELECTRICAL):

includes:

Area of refuge system, which was previously an alternate

DIVISION 28 (SAFETY AND SECURITY}:

Includes: Existing Access control on Front and Rear Entrances only
Includes: New access controls for 7 doors per drawings at $1,500 each
Includes: 2 new panels for access controls at $1,500 each

Includes: 1 panic button at $1,000 each

DIVISION 31 (EARTHWORK):

It has been assumed all excavated material (except existing topsoil) can be used as
common fill as defined in the geotechnical report. All surplus material shall be hauled
off-site. The cost to remove all surplus material from the site is included in the
Contract Sum assuming that this same material would be suitable for backfill. The
cost to dispose of and replace soil unsuitable for backfill is not included in the
Contract Sum.

excludes: removal of unsuitable and unclassified materials and their replacement

It has been assumed no ledge will be encountered. The cost to remove ledge is
Excludes: excluded from the Contract Sum.
excludes: it has been assumed no boulders (one cubic yard and larger) will be encountered.

The cost to remove boulders is excluded from the Contract Sum.

7/30/2020

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P54

Finance Committee - Agenda - 1/19/2022 - P27

By dnadmin on Sun, 11/06/2022 - 21:39
Document Date
Thu, 01/13/2022 - 13:22
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/19/2022 - 00:00
Page Number
27
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011920…

OSHA's Form 300A «rev. 01/2004)
Summary of Work-Related Injuries and Illnesses

All establishments covered by Part 1904 must complete this Summary page, even if no injuries or
illnesses occurred during the year. Remember to review the Log to verify that the entries are complete

Using the Log, count the individual entries you made for each category. Then write the totals below,
making sure you've added the entries from every page of the fog. if you had no cases write "0."

Employees former employees, and their representatives have the right to review the OSHA Form 300 in
its entirety. They also have limited access to the OSHA Form 301 or its equivalent. See 29 CFR
1904.35, in OSHA's Recordkeeping rule, for further details on the access provisions for these forms.

Number of Cases

Total number of
deaths

Total number of
cases with days

Total number of
other recordable

Total number of cases
with job transfer or

away from work __ restriction cases
0 0 0
G) (H) a) W)
Number of Days
Total number of Total number of days of
days away from job transfer or restriction
wiark
0 0
(K) (D
Injury and Illness Types
Total number of...
(™)
(1) Injury 0 (4) Poisoning 0
(2) Skin Disorder 0 (5) Hearing Loss 0
(3) Respiratory
Condition 0 (6) All Other Illnesses 8]

Post this Summary page from February 1 to April 30 of the year following the year covered by the form

Public reporting burden for this collection of information is estimated to average 58 minutes per response, including time to review the instruction, search and
gather the data needed, and complete and review the collection of information. Persons are not required to respond to the collection of information unless it
displays a currently valid OMB control number. If you have any comments about these estimates or any aspects of this data collection, contact: US Department
of | ahor OSHA Office of Statistics Room N-3844 900 Constitution Ava NW Washinaton NC 20210 No not sand the enmoleted forms to this office

U.S. Department of Labor

Occupational Safety and Health Administration

Form approved OMB no. 1218-0176

Establishment information

Your establishment name Schroeder Construction Management, Inc.

Street 2 Townsend West #3

City Nashua State New Hampshire

Zip 03063

Industry description (e.g., Manufacture of motor truck trailers)
Construction management

Standard Industrial Classification (SIC), if known (e.g., SIC 3715)

1 7 5 1
OR North American Industrial Classification (NAICS), if known (e.g., 336212)
2 3 6 2 2 ie]

Employment information

Annual average number of employees 10

Total hours worked by all employees last
year 22,098

Sign here

Knowingly falsifying this document may result in a fine.

| certify that | have examined this document and that to the best of my knowledge the entries are true, accurate, and

camplete.

John E. Schroeder
Company executive

603-882-1822

Phone

President

Title

1168/2021
Date

Page Image
Finance Committee - Agenda - 1/19/2022 - P27

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1216
  • Page 1217
  • Page 1218
  • Page 1219
  • Current page 1220
  • Page 1221
  • Page 1222
  • Page 1223
  • Page 1224
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact