Board Of Aldermen - Agenda - 8/11/2020 - P92
oo. oe
Seem oe
‘See
h
E
2 Design Services & Project Management of Downtown Riverfront Implementation
July 31, 2020
on segments of the project when survey becomes available. VHB and the design team will rely
on the completeness and accuracy of the materials and data that are provided by HSI.
The primary objectives of the preliminary design are as follows:
e Define the limits of work so environmental permits and property agreements can be
developed in the next phase,
e Define all the proposed improvements to a level where cost estimating will be
meaningful, Se
e Preliminary cost estimating to ensure that the design program is affordable within the
available funding.
The products of the preliminary design will include 3D design plans developed to sufficient
detail to achieve the above objectives. This phase does not include detailed grading, stormwater
treatment or management, drainage or traffic studies or environmental testing.
lt is proposed that a mid-preliminary design reassessment will be conducted with involvement
trom the design team, City staff and HSI to ensure that the scope and fee in this amendment are
adequate and appropriately distributed and that the project is tracking as envisioned. Pending
important design decisions will be identified and the scope will be adjusted as appropriate. In
addition, consideration will be given to the project development and implementation process.
The construction management (CM) approach will be considered for portions or all the project,
and logical project component groupings will be evaluated. An alternative would be to bring in
a construction firm on an advisory basis at this stage to provide input on means and methods
and costs for the more complicated shoreline aspects of the project. This would likely be
beneficial as the project enters permitting.
Estimated Duration: 12 weeks
2.1 PHASE 2 - PRELIMINARY DESIGN
2.11 Phase 2 Initiation
VHB will organize a brief phase 2 kickoff meeting with City staff, HSI and design team leaders.
2.12 Preliminary Design Plans
It is anticipated that the overall project will be broken into sub-project areas that may or may
not proceed under differing schedules because of factors such as property impacts, permitting,
complexity, funding and delivery methods. During conceptual design the overall project was
broken into 17 project areas, or components as shown in the figures that follow. The preliminary
design scope of services for each project component is described in reference to the project
component numbering shown in the figures.