Board Of Aldermen - Minutes - 12/16/2019 - P58
Solid Waste Department
DPW Facilities
High Point of Roof
1 9'-6"
Admin. Roof 11'-6"
Average Top of Roof
17'-0"
—— -— 526
Admin Roof
60'-2" >!
Solid Waste Department
DPW Facilities
High Point of Roof
1 9'-6"
Admin. Roof 11'-6"
Average Top of Roof
17'-0"
—— -— 526
Admin Roof
60'-2" >!
Solid Waste Department
DPW Facilities
—-— 5%
Level 1
0'- 0"
Nashua DPW, Solid Waste Building
Overall Floor Plan
Break Room
Adrnin
Assistant
File Storage
J
Staff Meeting/Training Room
Men's Locker/Restroom
y
Men's Locker'Restroom
<
General Storage Room
a sy
Recycling Tote Storage Room
102
ll
HARVEY
| rs |
Solid Waste Department
DPW Facilities
Comments:
- Major demolition
- New slab on grade
- New exterior walls, siding, MEP systems, sprinkler system
- Total 6,427 SF
- 7-Months
Hard Construction Costs $1,923,280
Design Contingency (20%) $384,656
Architectural, Engineering, Planning (15%) $346,190
Geotechnical Engineering $5,000
Haz-Mat Survey $2,500
Furniture, Fixtures and Equipment $100,000
Owner's Contingency (10%) $276,162
Total $3.037,789*
*Does not include temporary space during
renovations, haz-mat remediation, mold
remediation
Summary
DPW Facilities
Summary
Summary
DPW Facilities
ui Administration $5,521,558
—
F x ——
yy Streets Department $4,227,990
Parks and Recreation Department $3,192,628
Solid Waste Department $3,037,789
Total $15,979,965
Comments
DPW Facilities
Ta
- x
|
a
me.)
Financial challenges with $15.9M+ of renovations
Programming of existing renovated space remains
incomplete
Insufficient parking at Administration/Engineering
Department and Street Departments
No capacity for DPW administration and operations growth
No capacity for Street Department needs (vehicle storage,
maintenance bays, truck wash)
No capacity for Street Department to store required
equipment (40+/ pieces of equipment currently stored at
Burke Street)
Budgets do not include:
- Temporary relocation costs during construction
- Structural engineering studies
- Haz-mat surveys
- Mold remediation
- Escalation costs past 2020
- Renovations or improvements to garage/maintenance
facilities at Street Department
Summary
DPW Facilities
Questions and Answers
New Facility
DPW Facilities
Comments:
- New DPW Center
- 2-story, 25,000 SF building
- 12-month construction duration
Hard Construction Costs $7,500,000
Design Contingency (10%) $750,000
Architectural, Engineering, Planning (12%) $990,000
Geotechnical Engineering $5,000
Haz-Mat Survey $0
Furniture, Fixtures and Equipment $200,000
Owner's Contingency (5%) $472,250
Total $9,917,250
CITY OF NASHUA
NEW HAMPSHIRE
CITY ENGINEER'S OFFICE
9 RIVERSIDE STREET
NASHUA, NEW HAMPSHIRE 03062
REVISIONS
NO. DESCRIPTION DATE
"PROPOSED SIDEWALK
PLAN PREPARED FOR
FOUR HILLS
LANDFILL
A_REVI.OG (2
orice PROPO
“_|
I {
ADDRESS:
844 WEST HOLLIS ST
| | GREEN AREA —
WITH TABLES NASHUA, NEW HAMPSHIRE
TAX/MAP
SHEET TITLE
CONCEPT PLAN
DATE: PROJECT NUMBER
MARCH 2019
PROPOSED PAVED AREA «
APPROXIMATLY 367 PARKING.
3
3
i
DRAWN BY: CHECKED BY:
N. QUINTERO S. DOOKRAN
SHEET NUMBER:
100 200]
HPRIZONTAL SCALE IN FEET I
| [> SAE 1*=50-0"
/\ | eon
! ! 1é TOTAL SHEETS I