Board Of Aldermen - Minutes - 12/16/2019 - P48
Parks and Recreation Department
DPW Facilities
WY
| Newer Building - 1,360 SF
1902 Building - 1,287 SF
(
Parks and Recreation Department
DPW Facilities
WY
| Newer Building - 1,360 SF
1902 Building - 1,287 SF
(
Parks and Recreation Department
DPW Facilities
Parks and Rec Admin. Building
North Elevation
Top of Roof
13-10"
High Roof
1 4'-8"
Top of Roof
/ 9-2"
ao
Parks and Recreation Department
DPW Facilities
Parks and Rec Admin. Building
West Elevation
High Point of Roof
14'-8"
Roof
_ _ _ _ Root a
Top of Roof
9'-3"
Parks and Recreation Department
DPW Facilities
Parks and Rec Admin. Building
East Elevation
Top of Roof From
High Grade
13°-10"
>. Root Mp
> / 20° - 0"
Top of Roof From
Low Grade
19'-8"
Parks and Recreation Department
DPW Facilities
[if Addition Building - 1,485 SF
Parks and Recreation Department
DPW Facilities
Parks and Rec Admin Building Proposed Interior Reno
102
Parks and Recreation Department
DPW Facilities
Parks and Rec Admin Building Proposed Basement Reno
102
Parks and Recreation Department
DPW Facilities
Comments:
- Demolish 1920's building (1,287 sf)
- New 2-story addition (2,970 SF)
- Renovate 2,440 SF
- Total 5,410 SF
- New HVAC, sprinkler system, flooring, paint, ceilings
- 7-Months
Hard Construction Costs $2,025,282
Design Contingency (20%) $405,056
Architectural, Engineering, Planning (15%) $364,550
Geotechnical Engineering $5,000
Haz-Mat Survey $2,500
Furniture, Fixtures and Equipment $100,000
Owner's Contingency (10%) $290,238
Total $3,192,628*
*Does not include temporary space during
renovations, haz-mat remediation, mold
remediation
Solid Waste Department
DPW Facilities
Solid Waste Department
DPW Facilities
= 6 Ph aaa
| Gross Floor Area - 6,427 SF