Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 34271 - 34280 of 38765

Finance Committee - Agenda - 4/15/2020 - P241

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
241
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

20 Ireland Glasha SG160WM10 500 600 400 Vertical 2017 At site
19 Czech Republic Ujezd SG108WS8 102 750 400 Vertical 2016 At site
18 Scotland Glen Loth SG178WM14 555 428,6 400 Vertical 2016 At site
17 Scotland Fassfern SG140WL6 585 1000 400 ‘| Horizontal 2016 At site
16 Slovakia Velké Blahovo SG124WL8 357 750 400 Vertical 2016 At site
15 Slovakia Nova Dedinka SG124WL8 357 750 400 Vertical 2016 At site
14 Slovakia Malé Palenisko $G124WL8 357 750 400 Vertical 2016 At site
13 Italy Urago AG224KM24 330 255 400 | Horizontal 2016 At site
12 Georgia Didachara SGI6WLE6 161 1000 400 | Horizontal 2016 At site
11 Norway Sekkelva SG160WM6 792 1000 690 | Horizontal 2015 At site
10 Czech Republic Litice $G248WS10U63 1312 600 6300 Vertical 2015 At site
9 Bulgaria Musomishta SG160WS4 716 1500 400 | Horizontal 2015 At site
8 Norway Skreei og Skrede SG198WL6 1787 1000 690 ‘| Horizontal 2015 At site
7 Czech Republic Térlicko $G124WM8 245 750 420 Vertical 2015 At site
6 Slovakia Mo§son Il SG160WL10 623 600 400 Vertical 2015 At site
5 Norway Vaela SG254WL20 966 300 690 Vertical 2014 At site

Page Image
Finance Committee - Agenda - 4/15/2020 - P241

Finance Committee - Agenda - 4/15/2020 - P242

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
242
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

Sweden Hattorp AG178KM8 750 757 400 Vertical 2014 At site
Italy Cuasso SG140WM4 762 1500 400 Vertical 2014 At site
Norway Skogelva $SG178WS16 446 375 690 Vertical 2014 At site
Czech Republic | Testing room | SG288WL12U66 4000 500 6600 | Horizontal 2014 At site

GaEm s.r.o., Bobrky 2243, 75501 Vsetin, Czech Republic, VAT No. CZ 29299781
registered in the Commercial Register kept by Municipal Court in Ostrava, Section C, File 38749.

Mobile: +420 773 338 013

E-mail: info@qgaem.cz

Www.gaem.cz

Page Image
Finance Committee - Agenda - 4/15/2020 - P242

Finance Committee - Agenda - 4/15/2020 - P243

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
243
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

Appendix E
Electrical Balance of Plant Information
Equipment Proposal

Eaton References

Page Image
Finance Committee - Agenda - 4/15/2020 - P243

Finance Committee - Agenda - 4/15/2020 - P244

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
244
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

REQU EST FOR OR Te
PROPOSAL § comoration

Fo allel lta ig
Jackson Mills ao
AGK3190314-3

Page Image
Finance Committee - Agenda - 4/15/2020 - P244

Finance Committee - Agenda - 4/15/2020 - P245

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
245
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

March 18, 2019
Mavel Americas, Inc.
Attention: Mr. Chris Porse

Subject: Jackson Mills

Dear Mr. Porse,

Eaton Corporation acknowledges receipt of this inquiry and is pleased to provide the attached
offer. This proposal is based solely on the RFP documents provided. No site visit was performed
for this estimate.

Thank you for the opportunity to provide Mavel Americas, Inc. with the following scope and
proposal for your consideration. In response to your request, Eaton Corporation is pleased to offer
the following proposal for the Jackson Mills modernization.

Eaton is comprised of a network of local, regional and national; design engineers, project
engineers, project managers, subcontracting personnel, utility representative and other support
services. Our experience in electrical systems design, electrical equipment manufacturing, project
management, testing and commissioning, qualifies us to meet all your requirements.

Sincerely,
YOUR EATON’S ELECTRICAL SERVICES & SYSTEMS TEAM

Kevin Quirion

Engineering Lead

Generator Protection & Controls, Eaton

5 Gendron Drive, Suite 3 | Lewiston, Maine 04240
tel: +1 207 330-7158

mobile: +1 207 629-7934
kevinagquirion@eaton.com

Page Image
Finance Committee - Agenda - 4/15/2020 - P245

Finance Committee - Agenda - 4/15/2020 - P246

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
246
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

TABLE OF CONTENTS

Y. IATFOCUCTION ooo cece cece cence cece cere eee e eee tete eet e teeter eeeeeeeeeeneaeaaaaaaaeaeaaaeaeaeeeeeeeeeeeeeeeeeeees 1
1.1 xeculive SUMMALY sceccecem ven cpecscceoesees nner vecunnennmarueanenagnmemememanenareennse 1
1.2. Project SUMMGSLrY........-..<2--16..ineeEe Ee eee 1

2. Engineering Services Scope of Work.................ccecccccecseeeecenaeeeseaeeeeeaeecerteasesseaeeenenas 1
2:1 DYAWINGS si scesercessrenrqeeeasenerrescsenmcianvenneriacs ressennmisvevsenawenmneavernmiswodeaveneunamnnens Zz
2.2 Studiés.& Calculations................scasse-c-+:s#stn sane caqenebecensnscoueuerecge sy svseeevapeeeesnaueeraneune Z
2.3 System Integration ............ eee ee eeeeeeeeeeeeeeeeseeereneneuesseneeeseeeseeeseeenerseeeeeees 2

2.0.1 Programmable Logic Controller (PUG) srccsccsiceriesmeryesweracmunvamnerm anes 3
2.3.2 Human Machine Interface (HMI).................::::e:cceccceceeeeeeeeeeeeeeeeeeneauaeeeeeeeeteeees 3
2.3.3 Voltage Controllers .........0.0...ceceeceeec eee ceeeeeee eee eececaeeeeeeeeeeeeeeeeseseeeeeseeeessneaeeeeee 3
2.84 Network Architecture wsccccseciccccesscciscsmercmseereeseersrseesnnenenecsnereseumsesuecseerseneinas 3
2.4 Testing, Startup & COMMISSIONING «00.2.0... eee cece eeteeeereeeeeetesseeeeeeneeeeteaaeeeenenes 3

S: Equipment Scope OF. Sub y vsceccecccccencce ccs reensemmmencemanamemmncconcoteniesamunnensiasemunnaantentnns 4
3.1 Switchgear .........-.2---.nssiin mae pen eee: 4
3.2 Manual User Interface .......... 0.0... eecceeeceeceeeceeeeeeeeeeeeeeeneneeeueeeneeeueneeeeeeeteeeeeeeeereeees 4
3.8 Network Architecture wecccccisssnscrecsiesmmeerenanenserevirssenrenvevensemnenemumannaemnnmesmenamanient 5
3.4 Protective Relaying & Auto Synchronizing ...........0...cccecee eee cece eeeeeeeeteeeeeeeeeeeaaes 5
3.5 Balance of Plant 0.0.0.0... ccc eeeeeeeneeree eee ee ee ee eee eee eeregeeeeneneaueeseeeeeseeeeeeenennneneeaeea 6

3.6.1 Field Instrme@ntation scssccccuissznesemaerecnavecnnnaveneccormanemmeenemncemunemmeunecava 6
3.5.2 DC Battery System 0.0.0... eee cee eene ee eeeneeeeseeeeeeeseeessnaeeeeeneeeeeetineeseteaeeees 6
3.5.3 Station SEViICE 0.0... cece cece ccceeeeeeeesceeeaeeeeeeeeeeeeeeeeeeeeeeeneenieeeeeeeneeeeeeeeeneneel 6

4. Installationvand Removal Services sccnccccscocnccnemcmemuvemnm emer 6
4.1 Installation Services «2.0.0.0... ce ceee cece eee e eee ee cee e cece eee eaeeeea ea ae eeu eeaeseneseeeeeseeeeeeeseseeneeeees 6
42 Demolition & Remo va lessccnusscccsasnscaencarwsnscrorswersuasurenmmmnncnonsanaancsormm anton 6

5. Scheduling & Coordination with Owner...............0..00 Error! Bookmark not defined.

6. Pricing & Payment Schedule.................. cece Error! Bookmark not defined.

f. QualicaonSisscccscene es aiscemanencnreermneman Error! Bookmark not defined.

8. Safety Training of Eaton Corporation Field Personnel ..Error! Bookmark not defined.

9. Additional Work & Replacement Parts ....0.00. Error! Bookmark not defined.

10. Supplemental intonation ccesecccececserccusssccuevmenecemnnes Error! Bookmark not defined.
10.1 Validity period & Acceptance ........... ee Error! Bookmark not defined.
TOA “TOFS S.CONIWIONG wscsvcccscermeresenncenncamnicimanannansenne Error! Bookmark not defined.
10.3: Taxes, Pennits & Fe@Sccssiccseeanemersen Error! Bookmark not defined.

© 2019 Eaton Corporation. This submittal contains material which is Proprietary and Confidential to Eaton Corporation. 4 | P a e
It may only be used to evaluate and respond to this proposal, Unauthorized use and/or disclosure is strictly prohibited. g

Page Image
Finance Committee - Agenda - 4/15/2020 - P246

Finance Committee - Agenda - 4/15/2020 - P247

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
247
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

10.4 = BOnding..........e ce eeeseeereeeeeeeeeneneeeeeeesensuteeeeeesenenaes Error! Bookmark not defined.

10,5 Gertificate of INSUPANCE ...ccssuseccresccuecssnewvens Error! Bookmark not defined.
10-6 = VWWALPANIEY .nnrec-necnnnea nck ieee ER Error! Bookmark not defined.
10.7 Testing Clarifications. ................:ceceeseesseereeeeeeeeees Error! Bookmark not defined.
10.3 Divisiomof RESpoOnsiDihy wersecccessesvccsvecvesweencen: Error! Bookmark not defined.
10.9 Additional Clarifications...............0... ee Error! Bookmark not defined.

© 2019 Eaton Corporation. This submittal contains material which is Proprietary and Confidential to Eaton Corporation.
It may only be used to evaluate and respond to this proposal. Unauthorized use and/or disclosure is strictly prohibited.

2|Page

Page Image
Finance Committee - Agenda - 4/15/2020 - P247

Finance Committee - Agenda - 4/15/2020 - P248

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
248
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

Request for Proposal ol ‘fe a
23

Jackson Mills Date: Mar 12, 2019
+ Powering Business Worldwide
Revision: 0.0

1. INTRODUCTION

Eaton Corporation has a successful record of deploying turnkey hydro electro-mechanical
modernization projects spanning more than 50 years in government, utility and privately-owned
hydro-electrical facilities. We are well positioned with an experienced and committed team to
lead the Jackson Mills electrical modernization with a modern and cost-effective solution. This
skilled team will improve your ability to deliver quality power and improve the reliability and
functionality of pumping water and generating electricity.

Recently, Eaton Corporation has successfully automated a variety of systems in the power
generation and distribution industries. Notable projects include:

— Green Mountain Power, Little River Station: Repowering and modernization, including
exciters, governors, automation and protection systems

— Green Mountain Power, Ascutney Gas Turbine: Automation and excitation replacement

— Bureau of Reclamation, Shasta & Keswick: Excitation modernization

— Titan Americas: Plant Automation including SCADA, automation and protection systems

Eaton’s comprehensive technical proposal proves our ability to meet the requirements of the
specification, deliver on the goals of facility uniformity and maintain an aggressive, flexible
schedule through design and construction.

Eaton Corporation hereby offers to provide the services as detailed below, at the prices and on
the terms and conditions exclusively set forth in this offer.

1.1 EXECUTIVE SUMMARY

The following proposal and scope of work has been developed in response to the Request for
Quote and includes the design and procurement of the required protection and control
equipment associated with the Mavel supplied modern turbine-generator equipment. This
proposal assumes the new synchronous generator will be rated at 1226 kW, 4160 V.

To develop the most creative and cost-effective solution that meets the specification provided,
Eaton Corporation is providing a base price, with several options that either improve reliability,
decrease plant outage and downtime, or other recommended system enhancements.

1.2 PROJECT SUMMARY

The existing Jackson Mills Hydroelectric Generation Station is currently under review for
repowering. The scope of work outlined as part of this offer, is limited to the electrical and
control system as part of the repowering and based on the turbine-generator data provided by
Mavel and referenced as part of this offer.

2. ENGINEERING SERVICES SCOPE OF WORK

Eaton proposes to upgrade the Jackson Mills Station using an integrated approach. The basis
for every successful project is sound engineering and design as well as flawless execution.

© 2019 Eaton Corporation. This submittal contains material which is Proprietary and Confidential to Eaton Corporation. 4 Pp a
It may only be used to evaluate and respond to this proposal. Unauthorized use and/or disclosure is strictly prohibited. | g €

Page Image
Finance Committee - Agenda - 4/15/2020 - P248

Finance Committee - Agenda - 4/15/2020 - P249

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
249
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

Request for Proposal PS “T ie
q p ba ®

Jackson Mills Date: Feb 25, 2019 . &
aes Powering Business Worldvade
Revision: 0.0 BA

Eaton’s Generator Protection & Control Group has extensive experience integrating the latest
technologies and systems into a comprehensive and complete design package. Detailed
design drawings specific to each project are developed to provide an integrated drawing set for
all systems and subsystems within the facility, affected by the scope. When required, old
drawings are re-drawn and verified vendor equipment drawings are integrated into an overall
drawing package. Standard borders and drawing numbers provide a seamless cross reference
for all interconnected systems within the facility.

2.1 DRAWINGS

As part of this offer, Eaton Corporation is including engineering drawings of the protection and
control system. All drawings shall be provided in AutoCAD format per industry standards,
Professional Engineer stamping is not required. Drawing submittals and subsequent approvals
shall be provided per the following outline:

— Review Set (Schematics Only)

— For Fabrication (Custom Control Panels, Field Devices, etc.)
— For Construction (To Be Maintained by On-Site Contractor)
— Red-Lines (Copy to be Maintained On-Site)

— Record Drawings

The drawing package below shall be a complete and functional set of drawings for the entire
facility. All drawings from equipment vendors shall be updated and completed with the entire
system information. The drawing package below outline the minimum number of drawings
included as part of the document package.

— AC Metering & Relaying One-Line Diagram

— Network Architecture & Communications Diagram
— AC Three-Line Diagrams

— Breaker/Contactor Control Schematics

— Protective Relaying Schematics

— PLC I/O Diagrams

— Demolition Details

— Cable & Conduit Schedules

— Panel Fabrication & Wiring Diagrams

— Interconnection & Termination Details

2.2 STUDIES & CALCULATIONS

As part of this project, Eaton Corporation proposes the integration of Schweitzer Engineering
Laboratories 700G Generator Protection Relays for the Generators, one each. All protective
relay settings are provided as part of this offer.

2.3 SYSTEM INTEGRATION

This offer includes a comprehensive and integrated automation upgrade for the Jackson Mills
Hydroelectric Generation Station. Eaton Corporation proposes to design, supply and

© 2019 Eaton Corporation. This submittal contains material which is Proprietary and Confidential to Eaton Corporation. 2? | i a g e
It may only be used to evaluate and respond to this proposal. Unauthorized use and/or disclosure is strictly prohibited

Page Image
Finance Committee - Agenda - 4/15/2020 - P249

Finance Committee - Agenda - 4/15/2020 - P250

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
250
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

Request for Proposal = ‘ | of
wm

Jackson Mills Date: Mar 12, 2019
+s Powering Business Worldvide
Revision: 0.0

commission a complete and fully functional generator protection and control package to include
both manual and automatic control modes.

2.3.1 Programmable Logic Controller (PLC)

The PLC will be responsible for overall unit condition monitoring and sequencing. The
principle functions of the PLC include:

— Unit Start Sequencing & Start Permissive Monitoring
— Unit Stop Sequencing

— Unit Mechanical Protection (Alarm, Shutdown & Trip)
— Unit Voltage & Power Factor Control

— Unit Gate Position Control

— Unit Load Control

— Unit & Station Water Level Management & Control

— Automatic Unit Dispatch Control

— Unit & Station Monitoring & Alarm Conditioning

— SCADA System Integration & Point of Control

2.3.2 Human Machine Interface (HMI)

Eaton Corporation's offer includes the programming integration of a comprehensive HMI for
station and unit control and monitoring. The Maple Systems HMI will be responsible for all
station and unit alarm annunciation and logging. The HMI graphics will be developed to
match other owned facilities for operator familiarity.

2.3.3 Voltage Controllers

The new generator (supplied by others) shall be equipped with a brushless excitation
system. As such, it is our recommendation, that our protection and control system include a
Basler DECS 250 voltage regulator. This voltage regulator will be integrated as part of a
standalone turbine control system.

2.3.4 Network Architecture

This solution incorporates high quality, reliable components to provide the Jackson Mills
Hydro Electric Facility with a long lasting cost-effective solution. The hardware listed below
will be incorporated into the turbine control enclosure. The overall strategy is to provide an
automation solution that incorporates modern intelligent devices with existing manual
controls in a seamless package. This strategy significantly decreases the field support
required for the upgrade as much of the existing field wiring will not be touched. I/O is
connected to the central processor over a high-speed copper ethernet based connection
using Allen Bradley’s Ethernet IP protocol.

2.4 TESTING, STARTUP & COMMISSIONING

Testing is limited to individual hardware and components as part of the larger system. The
entire system commissioning is excluded from this offer.

© 2019 Eaton Corporation. This submittal contains material which is Proprietary and Confidential to Eaton Corporation.
It may only be used to evaluate and respond to this proposal. Unauthorized use and/or disclosure is strictly prohibited.

3|Page

Page Image
Finance Committee - Agenda - 4/15/2020 - P250

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3424
  • Page 3425
  • Page 3426
  • Page 3427
  • Current page 3428
  • Page 3429
  • Page 3430
  • Page 3431
  • Page 3432
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact