Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 3/6/2019 - P363

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P363

Technical Speciiicationss PY 2019 Paving Prograrn

ITEM 609.01 - GRANITE CURBING
A. SCOPE

This work shall consist of constructing curb as shown on the plans or as ordered by the Engineer.
Work includes furnishing, Placing, and cleanup work associated with the installation of the curb.
Curb shall be installed on a Properly graded, compacted bed of crushed gravel subgrade.

B. MATERIALS AND CONSTRUCTION

Cc. MEASUREMENT AND PAYMENT

Finance Committee - Agenda - 3/6/2019 - P362

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P362

Technica! Speciiications rY¥2019 Paving Program

ITEM 604.47 — DROP AND PLATE CASTING

A. SCOPE

This work consists of Temoving existing manhole casting, removing brick and mortar supporting
the casting, Plating the hole over the Structure, and backfilling the hole. Excavation, plate
removal, and final adjustment to proposed grade will be covered under Items 604.45, Item
604.46, and Item 604.4 as determined by the Engineer,

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P361

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P361

Technical Specifications FY2018 Paving Program

Finance Committee - Agenda - 3/6/2019 - P360

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P360

technical Speciiications FY2019 Paving Program

ITEM 604.46 ~ REPLACE CASTING
A. SCOPE

covers, and catch basin frames and grates as shown on the drawings or as directed by the
Engineer. Any repair needed to the existing structure within the 12 inches below the bottom of
the casting shall be included and performed under this item, Any further repair needed to the
existing structure shall be performed under Item 604.4.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P359

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P359

Technical Speciiications

FY 2019 Ie

aving Progra

Finance Committee - Agenda - 3/6/2019 - P358

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P358

Technical Specifications FY2018 Paving Progra

outer edge of the masonry. Mortar shall be placed on top of the bottom flange and smoothly
finished to have a slight slope that will shed water away from the frame.

All mortar shall be mixed with a cement mixer as approved by the Engineer, Mixing mortar by
hand/shovel will not be permitted.

C. MEASUREMENT AND PAYMENT

Finance Committee - Agenda - 3/6/2019 - P357

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P357

Technicai Specifications FY 2079 Paving Prograrn

Finance Committee - Agenda - 3/6/2019 - P356

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P356

Technical Specifications FY¥2019 Paving Prograrn

ITEM 604.4 - REPAIR OF EXISTING STRUCTURES
A. SCOPE

This work consists of repairing existing structures below 12” from the bottom of existing casting
frame.

B. MATERIALS AND CONSTRUCTION

The contractor shall include all labor, materials, equipment, and transportation necessary to
repair existing structures other than within the top 12 inches below the bottom of casting frame.
Repairs in that section shall not be paid under this item.

Finance Committee - Agenda - 3/6/2019 - P355

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P355

fechnical Specitications FY¥2048 Paving Program

ITEM 604.19 - CATCH BASIN AND PIPE
A. SCOPE

This work includes furnishing and installing a catch basin and up to ten feet of pipe at locations
as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P354

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P354

Technical Specifications r¥Y2019 Paving Program

Contractor shall record the square yards of cold planed area for each street. Payment is
contingent upon submittal of quantities in a per street format.

This item will be measured by the Square Yard. Payment for this item shall be at the contract
unit price per Square Yard. This payment shall also include all materials, labor, equipment, and
all else needed to complete the work under this item.

11

Pagination

  • Previous page ‹‹
  • Page 738
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact