Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 3/6/2019 - P373

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P373

Technical Specifications rY2049 Paving Prograin

ITEM 632.80 - TEMPORARY PAVEMENT MARKERS
A. SCOPE

This work shall consist of furnishing, placing, and removing temporary pavement markers
(TPMs) at locations shown on the plans or as ordered by the Engineer in accordance with the
latest approved NHDOT Standard Specifications for Road and Bridge Construction, and the
latest approved MU’ TCD.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P372

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P372

Technical Specifications PY 2079 Paving Program

X-ing = 20.8 SF

of quantities in a per street format,

29

Finance Committee - Agenda - 3/6/2019 - P371

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P371

Technical Specifications FY201% Paving Program

ITEM 632 ~ RETROREFLECTIV E PAVEMENT MARKINGS
A. SCOPE

This work shall consist of furnishing and placing white or yellow retro reflective paint pavement
m

arkings and retro reflective thermoplastic pavement markings at locations shown on the plans
or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P370

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P370

Technical Specifications FY2019 Paving Program

C. MEASUREMENT AND PAYMENT

at

Finance Committee - Agenda - 3/6/2019 - P369

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P369

ITEM 619.1 - MAINTENANCE OF TRAFFIC
A. SCOPE

This work shall consist of providing and Maintaining safe and passable traffic accommodations
for public traffic and furnishing, erecting and maintaining necessary traffic signs, barricades,
lights, signals, delineators, concrete barriers, signs, and other traffic control warning devices
through the work zone. The contractor is responsible for Preparing a work area that is free of
parked vehicles or other obstructing objects. This includes, but is not limited to, erecting “no-

Finance Committee - Agenda - 3/6/2019 - P368

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P368

Technical Specifications FY2019 Paving Program

ITEM 618.7 - FLAGGERS
A. SCOPE

This work shall consist of furnishing qualified flaggers, as required to direct traffic through or
around the Work as ordered by the Engineer,

B. MATERIALS AND CONSTRUCTION

Payment will not be made for flaggers who are not equipped with appropriate equipment or who
do not follow standard practice in performing their duties.

wae

Finance Committee - Agenda - 3/6/2019 - P367

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P367

Techuical Speciiicatione FY¥2019 Paving Prograni

ITEM 618.6 - UNIFORMED OF FICERS
A. SCOPE

This work shall consist of furnishing uniformed officers, with or without vehicles, as required to
direct traffic through or around the Work as ordered by the Engineer,

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P366

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P366

Technics Specifications FY2019 Paving Program

ITEM 616.7 - LOCAL TRAFFIC LOOPS 6° X 50° (2-4-2 TURN)
A. SCOPE

This work consists of furnishing al] labor, materials and equipment necessary to install the
quadruple loop detectors as directed by the Engineer,

B. MATERIALS AND CONSTRUCTION

a. Installation shall be in accordance with the latest approved NHDOT Standard Details
and Specifications,

Finance Committee - Agenda - 3/6/2019 - P365

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P365

Technical SveCiticadone FY2049 Pavirg Progranin

ITEM 609.811 — BITUMINOUS CURBING
A. SCOPE

the Engineer. Work includes al] furnishing, placing, and cleanup work associated with the
installation of the curbing,

B. MATERIALS AND CONSTRUCTION

Contractor shall record the location and linear feet of bituminous curb installed for each street.
Payment is contingent upon submittal of quantities in a per street format.

aA

Finance Committee - Agenda - 3/6/2019 - P364

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P364

Technical Specifications FY2019 Paving Program

ITEM 609.5 —RESET GRANITE CURB
A. SCOPE

This work shall consist of removal, Stockpiling and resetting granite curb as shown on the
drawings or as directed by the Engineer. Furnishing and placing all materials required for
resetting granite curb shall be included.

B. MATERIALS AND CONSTRUCTION

Pagination

  • Previous page ‹‹
  • Page 737
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact