Finance Committee - Agenda - 3/6/2019 - P353
Technical Specifications FY2018 Paving Program
ITEM 417.20- COLD PLANING TRANSITIONS
A. SCOPE
This work shall consist of the removal of existing bituminous pavement the depth and limits
shown on the plans or as directed by the Engineer. Cold planning transitions are required to tie in
overlays with existing pavement.
For roadways which are being reclaimed this item shall only be used to pay for cold planing at
driveway tie-ins as directed by the Engineer.