Technical Speciiicationss PY 2019 Paving Prograrn
ITEM 609.01 - GRANITE CURBING
A. SCOPE
This work shall consist of constructing curb as shown on the plans or as ordered by the Engineer.
Work includes furnishing, Placing, and cleanup work associated with the installation of the curb.
Curb shall be installed on a Properly graded, compacted bed of crushed gravel subgrade.
B. MATERIALS AND CONSTRUCTION
Cc. MEASUREMENT AND PAYMENT
Granite curb will be measured by the linear foot to the nearest 0.1 foot, from end to end along the
lower edge of the exposed face of the curbing and shall include al] required excavation and base
course material.
in place, and shall include full compensation for material, labor, equipment, and all else needed
to complete the work under this item.