Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P355

Finance Committee - Agenda - 3/6/2019 - P355

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
355
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

fechnical Specitications FY¥2048 Paving Program

ITEM 604.19 - CATCH BASIN AND PIPE
A. SCOPE

This work includes furnishing and installing a catch basin and up to ten feet of pipe at locations
as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor, equipment, and transportation necessary to
complete the work in accordance with the latest approved City of Nashua Standard
Specifications for Road Construction, or the latest approved NHDOT Standard Specifications for
Road and Bridge Construction. The most stringent specification shall apply unless otherwise
directed by the Engineer.

Catch basin shall be Type B — 4’ diameter.

Pipe shall be 12” PE (Type S).

Cc. MEASUREMENT AND PAYMENT

Payment for catch basin and pipe shall be at the contract unit price specified for each. This
payment shall include all materials, labor, equipment and all else needed to complete the work
under this item.

Connection of the pipe to an existing drainage structure as directed by the Engineer is incidental.

Setting frame and grate shall be incidental.

12

Page Image
Finance Committee - Agenda - 3/6/2019 - P355

Footer menu

  • Contact