Finance Committee - Agenda - 3/6/2019 - P863

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P863

SECTION 02530
BUILDING CONNECTIONS AND DROP CONNECTIONS
PART 1 - GENERAL
1.01 §©=WORK INCLUDED:

A. This Section covers furnishing of all materials and labor to construct building sewer
connections and drop connections as indicated on the Drawings, and as herein specified.

B. _ Final location of building connections shall be determined in the field by the Engineer.
1.02 RELATED WORK:
A. Section 02300, EARTHWORK
Section 02631, PRECAST MANHOLES AND CATCH BASINS
C. Section 02085, POLYVINYL CHLORIDE GRAVITY PIPE AND FITTINGS

Finance Committee - Agenda - 3/6/2019 - P862

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P862

PART 3 - EXECUTION

3.01 INSTALLATION:
A. _ Tracer tape shall be installed directly above the pipe or conduit it is to identify,
approximately 12 inches below the proposed ground surface.

The Contractor shall follow the manufacturer's recommendations for installation of the
tape, as approved by the Engineer.

END OF SECTION

Tracer Tape

2019 Sewer Replacement Project
02518-2

Nashua, NH

Finance Committee - Agenda - 3/6/2019 - P861

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P861

SECTION 02518

TRACER TAPE

PART 1 -GENERAL
1.01 WORK INCLUDED:

This section covers the furnishing, handling and installation of tracer tape, as called for on the
drawings.

1.02 SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF GENERAL
SPECIFICATIONS, SUBMIT THE FOLLOWING:

A. — Six sets of manufacturer's literature on the materials, colors and printing specified herein,
shall be submitted to the Engineer for review.

PART 2 - PRODUCTS

2.01 |. ACCEPTABLE MANUFACTURERS:

Finance Committee - Agenda - 3/6/2019 - P860

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P860

D. Where the Owner is paying directly for Uniformed Officers, the Contractor shall be
responsible for payment of the wages paid to the Uniformed Police Officers if the Contractor
fails to cancel the services of the Uniformed Officers in accordance with 2.01.B and
2.01.C above.

Finance Committee - Agenda - 3/6/2019 - P859

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P859

SECTION 02451

FLAGGERS AND UNIFORMED OFFICERS FOR TRAFFIC CONTROL

PART 1 - GENERAL
1.01 WORK INCLUDED:

A. _ This Section covers the provisions for furnishing Flaggers and Uniformed Police Officers
for Maintenance of Traffic as described in Section 01110 CONTROL OF WORK AND
MATERIALS, to direct traffic through or around work as shown on the plans or as ordered by the

Engineer.
1.02 DESCRIPTION:
A. The Contractor shall coordinate with the Engineer to determine the number of Flaggers

Finance Committee - Agenda - 3/6/2019 - P858

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P858

measuring target (or the sealing packer) in front of the television shall be used as an exact
measurement reference point, and the meter reading shall show this exact location of the
measurement reference point.

E. Electronic video equipment shall be capable of displaying and recording, at a minimum,
the following data for each pipe joint:

1. Project Identification

2. Date recorded

3. Footage counter

4. Sewer reach identification (street location, start MH and second MH)

3.03 DOCUMENTATION:

Finance Committee - Agenda - 3/6/2019 - P857

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P857

PART2-PRODUCTS

2.01

A.

B.

EQUIPMENT:
DVD (Read only) video system shall be used which utilizes standard DVD recording discs.

Finance Committee - Agenda - 3/6/2019 - P856

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P856

SECTION 02441

CLEANING AND TELEVISION INSPECTION OF PIPELINES

PART 1 - GENERAL
1.01 WORK INCLUDED:

A. The Contractor shall furnish all materials, tools, labor and equipment necessary to clean the
pipeline of debris, and visually inspect by means of a closed-circuit television (CCTV) of
sewers as requested by the Engineer as hereinafter specified.

102 RELATED WORK:

A. Section 01330, SUBMITTALS

B. Section 01331, DOCUMENTATION
103 QUALITY ASSURANCE:

Finance Committee - Agenda - 3/6/2019 - P855

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P855

Stabilized construction entrance shall conform to the plans and requirements of the
“Erosion and Sediment Control Design Handbook for Developing Areas of New
Hampshire.”

PART 3 —- EXECUTION
3.01 SILTSACKs® AND STABILIZED CONSTRUCTION ENTRANCE:

A. All SILTSACKs® shall be installed in accordance in all catch basins that receive flow
from the disturbed area of the project.with the manufacturer’s recommendations.

Finance Committee - Agenda - 3/6/2019 - P854

By dnadmin on Mon, 11/07/2022 - 13:13
  • Read more about Finance Committee - Agenda - 3/6/2019 - P854

SECTION 02370
EROSION CONTROL
PART 1 - GENERAL

1.01 WORK INCLUDED:
A. Provide temporary erosion control for the entire duration of project in accordance with

plans, specifications.
B.
1.02 RELATED WORK:
A. Section 02300: EARTHWORK
B. Section 02745: ROAD RESTORATION
C. Section 02920: LOAMING AND SEEDING

1.03 SITE CONDITION: