Finance Committee - Agenda - 3/6/2019 - P853
2. Contractor shall use extra care when compacting adjacent to pipes and
drainage structures. Backfill and compaction shali proceed along sides of
drainage structures so that the difference in top of fill level on any side of the
structure shall not exceed two feet (2') at any stage of construction.