Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P854

Finance Committee - Agenda - 3/6/2019 - P854

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
854
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02370
EROSION CONTROL
PART 1 - GENERAL

1.01 WORK INCLUDED:
A. Provide temporary erosion control for the entire duration of project in accordance with

plans, specifications.
B.
1.02 RELATED WORK:
A. Section 02300: EARTHWORK
B. Section 02745: ROAD RESTORATION
C. Section 02920: LOAMING AND SEEDING

1.03 SITE CONDITION:

A. All soil erosion and sediment control measures to be in accordance with standards and
specifications thereof in "Stormwater Management, and Erosion and Sediment Control
Handbook for Urban and Developing Areas in New Hampshire," April 1997, prepared
by Rockingham County Conservation District for NHDES in cooperation with USDA-
SCS.

B. The work area shall be graded, shaped, and otherwise drained in such a manner as to
minimize soil erosion, siltation of drainage channels, damage to existing vegetation,
and damage to property outside the limits of the work area. Silt fences, hay bales
and/or detention basins will be necessary to accomplish this end.

PART 2 —- PRODUCTS
2.01 MATERIALS:

A. SILTSACK®:

Sediment control devices at catch basins shall be SILTSACK® as manufactured by
Terrafix Geosynthetics, Inc., or approved equal.

B. Stabilized Construction Entrance:

2019 Sewer Replacement Project Erosion Control
Nashua, NH 02300-1

Page Image
Finance Committee - Agenda - 3/6/2019 - P854

Footer menu

  • Contact