Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 10/6/2021 - P69

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P69

e Franklin High School, Franklin, MA

¢ Gordon College, Wenham, MA

¢ §=Tilton School, Tilton, NH

e Palazola Playground, Gloucester, MA

¢ Manchester Field, Winchester, MA

¢ Bedford High School, Bedford, MA

« Proctor Academy Baseball, Andover, NH

¢ Proctor Academy Synthetic Turf Fields, Andover, NH

¢ Proctor Academy Ski Mountain Slope Certification, Andover, NH
¢ Marshal Simmons School, Track and Field, Burlington, MA
e Lexington High School, Lexington, MA

¢ Blanchard Road, Burlington, MA

Finance Committee - Agenda - 10/6/2021 - P68

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P68

« Proctor Academy Baseball Field Renovation Project, Andover, NH — Provided design and
construction administration for a new natural turf baseball field.

e Proctor Academy Ski Mountain Survey and Certification, Andover, NH — Provided surveying
and elevation certification for the main ski slope at Proctor Academy.

¢ Taunton High School Master Plan, Taunton, MA — Conducted a full campus master plan for
the renovations of the athletic facilities including the baseball field, softball fields, soccer
field, football field and parking lot.

Finance Committee - Agenda - 10/6/2021 - P67

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P67

Athletic Field and Site Improvements Project, Madeline English School, Everett, MA —
Responsible for the design, permitting and construction administration of a synthetic turf
multipurpose athletic field, renovation and expansion of existing playground, landscaping
improvements, pedestrian walkways and athletic field lighting. Challenges include
permitting for the Activity Use Limitation (AUL) site and management of contaminated soils.

Finance Committee - Agenda - 10/6/2021 - P66

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P66

Ronan McElligott Playground, Westford, MA — Design, bid assistance, and construction
administration services for the poured in place rubber surfacing replacement at McElligott
Playground.

Finance Committee - Agenda - 10/6/2021 - P65

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P65

Arsen Hambardzumian, P.E. (MA, RI, NH, ME, FL)

Principal
Overview

Finance Committee - Agenda - 10/6/2021 - P64

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P64

ae. NESRA spnpenes tector
EL ENGINEERING, LLC

Team Organization

City of Nashua
Mayor Jim Donchess

Arsen Hambardzumian, P.E.
Project Principal

|
Parks & Recreation
[

Finance Committee - Agenda - 10/6/2021 - P63

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P63

Team Organization & Staff Skill Set

Ar K NE. SRA W wiieulouecey
~~ ENGINEERING, LLC

Finance Committee - Agenda - 10/6/2021 - P62

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P62

Geotechnical m Environmental m Construction Materials m Facilities

Geotechnical
Design and construction of functional, cost-effective
structures require a thorough understanding of local soil,
rock, and groundwater conditions. Terracon provides a wide
range of services to support all phases of a project, from
feasibility level studies through completion of the
construction process.

Subsurface exploration and testing
Foundation analysis and design

Finance Committee - Agenda - 10/6/2021 - P61

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P61

je NE. SR A (508) 221-7174

WWW.NESRAENG.COM

> ENGINEERING, LLC

master planning services, permitting and regulatory assistance, consulting and peer review services, total
station laser surveying, and line striping layout. (City Funded; Cost 4M)

® North Attleboro High School Track, North Attleboro, MA: Nesra worked closely with the town of North
Attleborough to offer engineering services related to their 6 lane running track. Nesra provided 100%
Design, Existing Conditions Mapping, Permitting, Front End & Technical Specifications.

Finance Committee - Agenda - 10/6/2021 - P60

By dnadmin on Mon, 11/07/2022 - 13:36
  • Read more about Finance Committee - Agenda - 10/6/2021 - P60

i - je NE. SR A (508) 221-7174

WWW.NESRAENG.COM

~~ ENGINEERING, LLC

@ 2 Mile Rail Trail, Swampscott, MA: Project involved DOT 25% design submission, includes biking lanes,
pedestrian accessibility, ADA/AAB compliance through, pedestrian bridge, Notice of Intent and DEP
permitting, Profiles, Grading Plans, Cross-Sections, Details etc. (Transportation Improvement Program TIP
funding; Cost 7M+; Under Construction)

Pagination

  • Previous page ‹‹
  • Page 381
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact