Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/6/2021 - P60

Finance Committee - Agenda - 10/6/2021 - P60

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
60
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

i - je NE. SR A (508) 221-7174

WWW.NESRAENG.COM

~~ ENGINEERING, LLC

@ 2 Mile Rail Trail, Swampscott, MA: Project involved DOT 25% design submission, includes biking lanes,
pedestrian accessibility, ADA/AAB compliance through, pedestrian bridge, Notice of Intent and DEP
permitting, Profiles, Grading Plans, Cross-Sections, Details etc. (Transportation Improvement Program TIP
funding; Cost 7M+; Under Construction)

@ Meadows Parks Phases | & Il, Everett, MA: Project involved Research, Survey, Community Outreach,
Schematic Design, 100% Design and Construction Documents, Bid Specifications, Bid Assistance,
Construction Administration, Daily Inspection Reports, Project Closeout and Follow up. (CPA funding; Cost
2.5M)

@ McDonald Playground, Waltham, MA: Project involved Research, Survey, Community Outreach,
Schematic Design, Soil Testing, 100% Design and Construction Documents, Bid Specifications, Bid
Assistance, Construction Administration, Daily Inspection Reports, and Project Completion October 2021.
(CDBG Grant $450,000, Davis-Bacon Funded Project; Cost 1M+)

® Thompson Playground, Waltham, MA: Project involved Research, Survey, Community Outreach,
Schematic Design, 100% Design and Construction Documents, Bid Specifications, Bid Assistance,
Construction Administration, and Project Completion October 2021. (CDBG Grant $450,000, Davis-Bacon
Funded Project; Cost 1M+)

Glendale Park, Everett, MA: Project involved Research, Survey, Community Outreach, Schematic Design,
100% Design and Construction Documents, Bid Specifications, Bid Assistance, Construction
Administration, Daily Inspection Reports, Project Closeout and Follow up. ($500,000 CDBG Grant, CPA
funding; Cost 2.5M)

e McElligot Playground, Westford MA: Project involved 100% PIP Replacement design and testing, site
inspections, As-Built drawing, and close-out package review. (Town funded; Cost 100k)

@ Day Park & Parking Lot, Everett, MA: Project involved the redesign of the parking lot, new playground
areas for toddlers and kids ages 5-12 as well as a new splash pad area. Nesra performed Utility Research,
Survey, Community Outreach, Schematic Design, 100% Design and Construction Documents, Bid
Specifications, Bid Assistance, Construction Administration, Daily Inspection Reports, Project Closeout and
Follow up. (City Funded; Cost 1.4M)

eWhittemore Elementary School Waltham, MA: Nesra worked closely with Green Acres to deliver an
amazing athletic facility catered to the children. At the front of the school, Nesra designed a small
synthetic soccer field, basketball/roller rink combination court and installed a modern playground at the
rear of the school. Nesra provided 100% Design, Permitting, Sidewalk and Parking Lot Design, Pre-bid and
Preconstruction Meeting, Weekly Meetings, As-Built drawing and Close-out Package Review. (City Funded;
Cost 500K)

® Tuanton Indoor Gym & Baseball Facility: Nesra was part of this amazing project consisting of a new indoor
gym facility consisting of a new building, basketball courts, lighting, bleachers, and hardwood flooring. As
part of subsequent phase, Nesra re-designed the High School’s baseball facility and dugouts and provided

Page Image
Finance Committee - Agenda - 10/6/2021 - P60

Footer menu

  • Contact