Athletic Field and Site Improvements Project, Madeline English School, Everett, MA —
Responsible for the design, permitting and construction administration of a synthetic turf
multipurpose athletic field, renovation and expansion of existing playground, landscaping
improvements, pedestrian walkways and athletic field lighting. Challenges include
permitting for the Activity Use Limitation (AUL) site and management of contaminated soils.
Memorial Stadium, Everett, MA — Responsible for Design of Athletic Facility, including an in-
filled synthetic turf multipurpose field, sand-based volleyball court, track and field events
such as long jump and triple jump, perimeter jogging track, grandstands and athletic field
lighting.
Athletic Field Renovation Project, Burlington, MA — Responsible for the design, permitting
and construction administration of a natural turf athletic field at Burlington High School.
Improvements include a stone drainage layer under the root zone, amended root zone for
the sod and irrigation. Challenges include elevating site to prevent drainage issues, providing
underground storage for additional drainage improvements and wetland replication.
Colby Sawyer Track and Field Renovation Project, New London, NH — Provided surveying,
design, permitting and construction administration for an NCAA certified 400-meter track
and inset synthetic turf athletic field. Additional features include Javelin, Shot-Put, Discus,
Long Jump/Triple Jump solar scoreboard, and centerfield logo. Permitting include New
London Planning Board, New London Conservation Commission, New Hampshire
Department of Environmental Services (NHDES) Wetlands Dredge and Fill Permit, NHDES
Alteration of Terrain Permit and National Pollution Discharge Elimination Systems permit.
Master plan includes future bleachers and athletic field lighting.
Bentley University, Waltham, MA — Design, Permitting and Construction administration
services for Bentley University’s main stadium as well as adjacent turf field. Project
improvements include replacement of both synthetic turf fields, expansion of the athletic
area by approximately 22,000 S.F. New formalized donor recognition area with flag poles,
up-lighting, plantings and much more. Project is located within the100-ft wetland buffer and
as such required extensive permitting through the local Conservation Commission as well as
the Department of Environmental Protection. Throughout the construction Nesra provided
construction administration services, and completed the As-Built Plan as well as the
Certification of Compliance. Subsequent to this project, Nesra has been retained by Bentley
University to design and permit their Softball Facility.
Winchester Soccer Club Athletic Complex, Winchester, MA — Provided design improvements,
construction management and permitting assistance for a multi-million-dollar athletic
complex. Project consisted of an indoor synthetic turf field, outdoor synthetic turf field, a
natural grass field, parking lots, and site improvements. The indoor facility boasts a 70,000
square foot athletic field, elevated fitness area, offices, locker rooms, concessions and
restrooms; The outdoor facilities include lighting, scoreboards, ADA and emergency access
and other site amenities.
Anna Maria College, Paxton, MA — Provided master planning for a new baseball facility, an
indoor practice facility, as well as a synthetic turf multipurpose field replacement project.
The NCAA athletic field turf replacement project was completed in 2019 and the baseball
facility is slated for 2021.
Proctor Academy Main Athletic Complex Renovation Project, Andover, NH — Provided Design
for two in-filled synthetic turf multipurpose athletic fields, one natural turf softball field,
landscaping improvements, site amenities and athletic field lighting.