Finance Committee - Agenda - 3/17/2021 - P207

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P207

17.

18.

19.

Regardless of action that may be taken or not taken by the ENGINEER, the
CONTRACTOR shall be solely responsible for the appropriateness, reflectivity and
condition of all materials provided as well as placement and maintenance of traffic
control elements.

The CONTRACTOR shall submit a Traffic Control Plan prior to work on arterial
roadways. This Traffic Control Plan will describe how the CONTRACTOR proposes to:

Finance Committee - Agenda - 3/17/2021 - P206

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P206

15.

16.

Qualified Superintendent(s) shall be assigned for all crews. Contact information will be
provided for all Superintendents.

USE OF GROUNDS

Finance Committee - Agenda - 3/17/2021 - P205

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P205

11.

12.

13.

14.

ADJUSTMENT OF MANHOLES
Manholes shall be adjusted so that finished paving shall be flush with the manhole.

In the instance when manholes are set lower than adjacent pavement by an amount equal
to or greater than 2 inch measured with use of a straight edge, the ENGINEER will at
their sole discretion either require the structure to be readjusted at the CONTRACTOR’s
expense or not make any payment to the CONTRACTOR for the adjustment of the
structure.

Finance Committee - Agenda - 3/17/2021 - P204

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P204

10.

TIE-IN AT SIDE ROAD
Side road tie-in areas shall be milled to the same depth as specified for the roadway.

INTERIM MILESTONES FOR SUBSTANTIAL MPLETI
The following Substantial Completion Milestones shall be met:

50 percent of the total length of all roadways segments in the contract shall be substantial
complete by July 16, 2021.

85 percent of the total length of all roadways segments in the contract shall be substantial
complete by September 3, 2021.

Finance Committee - Agenda - 3/17/2021 - P203

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P203

4.

inch. Base and binder courses shall be 50 gyration with PG 64-28 and maximum
aggregate size of % inch.

The following course thicknesses shall be used:

1.5” Mill & Overlay
1.5” wearing course.

2” Mill & Overlay
2” wearing course.

Reclamation
1.5” wearing course over 2” binder course.

THER RKI TRACT AREA
Other City and utility work may be in progress within the project area during work in this
contract.

Finance Committee - Agenda - 3/17/2021 - P202

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P202

SUPPLEMENTARY CONDITIONS/PROSECUTION OF WORK

These Supplementary Conditions amend or supplement the Standard General Conditions of the
Construction Contract and other provisions of the Contract Documents as indicated below. All
provisions which are not so amended or supplemented remain in full force and effect.

1.

DESCRIPTION OF WORK

The contract work includes the limits on the various streets listed in the attached
summary. The specified pavement treatment is listed.

Finance Committee - Agenda - 3/17/2021 - P201

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P201

DIVISION 6

SUPPLEMENTARY CONDITIONS
PROSECUTION OF WORK

Finance Committee - Agenda - 3/17/2021 - P200

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P200

2. At least 5 days prior to the proposed closure, the CONTRACTOR shall submit a detour traffic plan for each
location being detoured.

3. The CONTRACTOR shall install standard traffic control devices in accordance with the Detour Signage plan
provided in the bid documents and the Manual on Uniform Traffic Control Devices (MUTCD.)

4. The detour signage shall be covered when the road closure is not in effect.

B. CONTRACTOR shall notify the following agencies of any traffic delays or road closures three days in advance of the
work:

Finance Committee - Agenda - 3/17/2021 - P199

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P199

ARTICLE 17 - MISCELLANEOUS

17.01 Giving Notice

A. Whenever any provision of the Contact Documents requires the giving of written notice, it will be deemed to have
been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation
for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.

17.02 Computation of Times

Finance Committee - Agenda - 3/17/2021 - P198

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P198

5. Not resume work after the effective date of a notice of termination unless and until receipt of a written notice
from the OWNER to resume performance.