Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P433

Finance Committee - Agenda - 6/7/2017 - P433

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
433
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

PART 1 - GENERAL

1.1 DESCRIPTION

OLO10A-1

SECTION O1010A
SUMMARY OF WORK

A. Work Included: Upgrading the City of Nashua, New Hampshire Headwork’s
Facilities at the main Wastewater Treatment Facility (WWTF). The major
proposed work under this Contract includes:

Construction of:

1.

a.

b.
C.

Se Os TART eo moe

mead

e

Sludge Processing Building Pump Room Air Handling Unit (SAHU-
1A),

Grit Building Supply Fan (GSF-1) and exhaust fans (GEF-1, GEF-2);
Control Building Dewatering Polymer Pump Room and Polymer Bulk
Storage Area Make-up Air Unit (CMUA-1);

Control Building Administration Offices Roof Top Unit (CRTU-1);
Control Building Administration Offices Exhaust Fan (CEF-15A);
Control Building Laboratory Roof Top Unit (CRTU-2);

Control Building Laboratory Hoods (CSF-2A, CSF-3A);

Control Building Laboratory Hood Storage Cabinet (SEF-10A);

Control Building Lobby Area Roof Top Unit (CRTU-3);

Control Building Lobby Area Offices Air Cooled Heat Pump (CHP-1);
Solids Handling Garage Bay duct work;

Control Building Electric Room Air Cooled Heat Pump (CHP-2);

Other appurtenances as shown on the Drawings and specified herein.

olition of:

Sludge Processing Building Pump Room Air Handling Unit (SAHU-1);
Grit Building Air Handling Unit (GAHU-1) and exhaust fans (GEF-1,
GEF-2);

Control Building Administration Offices Air Handling Unit (CAHU-2);
Control Building Laboratory Air Handling Unit (CAHU-3);

Control Building Boiler Room HVAC Unit;

Solids Handling Garage Bay duct work;

Duct work, fans, piping, lighting, ceilings, conduit, other appurtenances
as shown on the Drawings and specified herein.

Renovation of:

a.

Heating and ventilation units/ductwork in the Solids Handling Garage
Bay, Sludge Processing Building Pump Room, Grit Building, Control
Building not limited to the Dewatering Pump Room, Polymer Bulk
Storage Area, Administration Offices, Laboratory, Lobby Area, and
roof;

Architectural in the Control Building not limited to the Administration
Offices, Laboratory, Lobby Area and roof;

Structural in the Control Building not limited to the roof,

Electrical modifications to MCCs, lighting panels, and conduit/wiring to
facilitate the electrical needs for the HVAC equipment and lighting;

13089A

Page Image
Finance Committee - Agenda - 6/7/2017 - P433

Footer menu

  • Contact