Finance Committee - Agenda - 6/3/2020 - P108

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P108

B. CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility OWNER
(and OWNER, if OWNER is performing the other work with OWNER’s employees) proper and safe access to the Site
and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such
other work and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents,
CONTRACTOR shall do ali cutting, fitting, and patching of the Work that may be required to properly connect or

Finance Committee - Agenda - 6/3/2020 - P107

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P107

2. Recommendation by ENGINEER or payment by OWNER OF ANY PROGRESS OR FINAL PAYMENT;

3. The issuance of a certificate of Substantial Completion by ENGINEER or any payment related thereof by
OWNER;

4. Use or occupancy of the Work or any part thereof by OWNER;
5. Any acceptance by OWNER or any failure to do so;

6. Any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of | acceptability
by ENGINEER;

Finance Committee - Agenda - 6/3/2020 - P106

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P106

such notice to be in a written communication separate from the submittal; and, in addition, shall cause a specific
notation to be made on each Shop Drawing and Sample submitted to ENGINEER for review and approval of each
such variation.

Finance Committee - Agenda - 6/3/2020 - P105

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P105

6.16 Emergencies

Finance Committee - Agenda - 6/3/2020 - P104

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P104

with them in the protection, removal, relocation, and replacement of their property. All damage, injury, or loss to any
property referred to in paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in whole or in part, by
CONTRACTOR, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any
of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by
CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or

Finance Committee - Agenda - 6/3/2020 - P103

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P103

B CONTRACTOR shall mark up one set of paper prints to show the As-built conditions. They shall include all the
information shown on the Contract Drawings and a record of all deviations, modifications, or changes from those
Drawings, however minor, which were incorporated in the Work, all additional work not appearing on the Contract
Drawings and all changes which are made after final inspection of the Contract Work. These As-built marked prints

Finance Committee - Agenda - 6/3/2020 - P102

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P102

6.10 TYaxes
A. CONTRACTOR shall pay all sales, consumer, use, and other similar taxes required to be paid by CONTRACTOR
in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance
of the Work

6.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas

Finance Committee - Agenda - 6/3/2020 - P101

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P101

CONTRACTOR does not make the request or does not provide the certificate before the expiration of the six-
month period, CONTRACTOR agrees that OWNER may order the CONTRACTOR to stop work, suspend the
contract, or terminate the contract.

H. To be deemed a responsive bid, the list of subcontractor form must be submitted even if no subcontractors
are required to be listed. Submittal is as follows:

1. Each bid submitted to any officer, department, board or commission for the construction of any public
work or improvement must include:

Finance Committee - Agenda - 6/3/2020 - P100

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P100

responsibility to make certain the Specifications and Drawings are in accordance with Laws and Regulations, but this
shall not relieve CONTRACTOR of CONTRACTOR’s obligations under paragraph 3.03.

Finance Committee - Agenda - 6/3/2020 - P99

By dnadmin on Mon, 11/07/2022 - 13:29
  • Read more about Finance Committee - Agenda - 6/3/2020 - P99

F. The divisions and sections of the Specifications and the identifications of any Drawings shall not control
CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by
any specific trade.