  2. Finance Committee - Agenda - 6/3/2020 - P103

Finance Committee - Agenda - 6/3/2020 - P103

By dnadmin on Mon, 11/07/2022 - 13:29
Document Date
Fri, 05/29/2020 - 15:04
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/03/2020 - 00:00
Page Number
103
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060320…

B CONTRACTOR shall mark up one set of paper prints to show the As-built conditions. They shall include all the
information shown on the Contract Drawings and a record of all deviations, modifications, or changes from those
Drawings, however minor, which were incorporated in the Work, all additional work not appearing on the Contract
Drawings and all changes which are made after final inspection of the Contract Work. These As-built marked prints
shall be kept current and available on the job site at all times. All changes from the Contract Drawings which are made
in the Work or additional information which might be uncovered in the course of construction shall be accurately and
neatly recorded as they occur by means of details and notes. No construction work shall be concealed until it has been
inspected, approved, and recorded. The As-built marked prints will be jointly inspected for accuracy and completeness
by the ENGINEER'S representative and a responsible representative of the CONTRACTOR prior to submission of the
monthly pay estimate. Failure to keep the As-built marked prints on a current basis shall be sufficient justification to
suspend pay estimates. The drawings shall show the following information, but not be limited to:

1. The location of any utility lines or other installations of any kind or description known to exist within the
construction area. The location includes dimensions of permanent features.

2. The location and identification of all surface installations within 100 feet of the construction work.
3. The location and dimensions of any changes within the building or structure.
4. Correct grade or alignment of roads, structures, or utilities if any changes were made from Contract Drawings.
5. Correct elevations if changes were made in site grading.
6. Changes in details or design or additional information obtained from working drawings specified to be prepared
or furnished by the CONTRACTOR including but not limited to fabrication, erection, installation plans and
placing details, pipe sizes, insulation material, dimensions or equipment foundations, etc.
7. The topography and grades of all drainage installed or affected as a part of the Work.
&. All changes or modifications which result from the final inspection.
The As-built marked prints shall be delivered to the ENGINEER at the time of final inspection for ENGINEER's
review and approval. All approval and acceptance of As-built drawings shall be accomplished before final payment is
made to the CONTRACTOR.
6.13 Safety and Protection
A. CONTRACTOR shall be solely responsible for initiating, maintaining and supervising all safety precautions and
programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety of, and
shall provide the necessary protection to prevent damage, injury or loss to:
1, All persons on the Site or who may be affected by the Work;
2. All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and
3. Other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways,
structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course
of construction.
B. CONTRACTOR shall comply with all applicable Laws and Regulations relating to the safety of persons or
property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all

necessary safeguards for such safety and protection. CONTRACTOR shall notify OWNER of adjacent property and of
Underground Facilities and other utility Owner’s when prosecution of the Work may affect them, and shall cooperate

GC - 27 of 53