Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/2/2021 - P27

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P27

1.4

ASTM B 370 — Standard Specification for Copper Sheet and Strip for
Building Construction.

D. ASTM D 225 — Standard Specification for Asphalt Shingles (Organic
Felt) Surfaced with Mineral Granules.

E. ASTM D 226 — Standard Specification for Asphalt-Saturated Organic
Felt Used in Roofing and Waterproofing.

F, ASTM D 1970 — Standard Specification for Self-Adhering Polymer
Modified Bituminous Sheet Materials used as Steep Roofing
Underlayment for Ice Dam Protection.

Finance Committee - Agenda - 6/2/2021 - P26

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P26

SECTION 07 31 13

ASPHALT SHINGLE ROOFING SYSTEMS

Display hidden notes to specifier by using "Tools"/"Options"/"View'"/"Hidden Text".

PART 1 GENERAL
1.1. SECTION INCLUDES
A. Granule surfaced asphalt shingle roofing.

B. Moisture shedding underlayment, eaves, valley and ridge protection
C. Associated metal flashing

Finance Committee - Agenda - 6/2/2021 - P25

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P25

3.06

3.07

3.08

3.09

Flashing over the field splice intersection.

FLASHING

A. Wall and curb flashing shall be cured EPDM membrane. Continue the deck membrane as wall flashing
where practicable. Use Pressure-Sensitive Curb Wrap when possible to flash curb units.

B. Follow manufacturer’s typical flashing procedures for all wall, curb, and penetration flashing including metal
edging/coping and roof drain applications.

WALKWAYS

Finance Committee - Agenda - 6/2/2021 - P24

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P24

3.03

3.04

3.05

INSULATION PLACEMENT

A. Install insulation or membrane underlayment over the substrate with boards butted tightly together with no
joints or gaps greater than 1/4 inch. Stagger joints both horizontally and vertically if multiple layers are
provided.

MEMBRANE PLACEMENT AND BONDING

A. Unroll and position membrane without stretching. Allow the membrane to relax for approximately 1/2 hour
before bonding. Fold the sheet back onto itself so half the underside of the membrane is exposed.

Finance Committee - Agenda - 6/2/2021 - P23

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P23

between Carlisle 725TR and an approved substrate.

2.06 METAL EDGING AND MEMBRANE TERMINATIONS

A. General: All metal edgings shall be tested and meet ANSI/SPRI ES-1 standards and comply with

International Building Code. All metal work is to be supplied and warranted by the manufacturer.

B. SecurEdge One Supplied —

Finance Committee - Agenda - 6/2/2021 - P22

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P22

2.05

B.

4. InsulFast Fasteners: A threaded #12 fastener with #3 phillips drive used for insulation attachment into steel
or wood decks.

5. HP Term Bar Nail-Ins: A 1-1/4” long expansion anchor with a zinc plated steel drive pin used for fastening
the Carlisle Termination Bar or Seam Fastening Plates to concrete, brick, or block walls.

6. Seam Fastening Plate: a 2” diameter metal fastening plate used in conjunction with RUSS or EPDM
membrane for additional membrane securement.

Finance Committee - Agenda - 6/2/2021 - P21

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P21

limitation. The maximum wind speed coverage shall be peak gusts of 55 measured at 10 meters above ground
level. Certification is required with bid submittal indicating the manufacturer has reviewed and agreed to such
wind coverage.

B. Pro-rated System Warranties shall not be accepted.
PART 2 PRODUCTS
2.01 GENERAL

A. All components of the specified roofing system shall be products of Carlisle SynTec or accepted by Carlisle
SynTec as compatible.

Finance Committee - Agenda - 6/2/2021 - P20

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P20

superintendent on the job at all times roofing work is in progress.

There shall be no deviations made from this specification or the approved shop drawings without the prior
written approval of the specifier. Any deviation from the manufacturer’s installation procedures must be
supported by a written certification on the manufacturer’s letterhead and presented for the specifier’s
consideration.

Finance Committee - Agenda - 6/2/2021 - P19

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P19

1.11

1.12

1.13

is free running and drains are watertight. Remove strainers and plug drains in areas where work is in
progress. Install flags or other telltales on plugs. Remove plugs each night and screen drain.

F, Store moisture susceptible materials above ground and protect with waterproof coverings.

G. Remove all traces of piled bulk materials and return the job site to its original condition upon completion of
the work.

SAFETY

Finance Committee - Agenda - 6/2/2021 - P18

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P18

1.09

1.10

C.

Bids must be submitted as required by the owner and governing bodies.

Any conditions which are not shown on the shop drawings should be indicated ona copy of the shop drawing
and included with bid submittal if necessary to clarify any conditions not shown.

TEMPORARY FACILITIES AND CONTROLS

A.

Temporary Utilities:

1. Water, power for construction purposes and lighting are/are not available at the site and will/will
not be made available to the roofing contractor.

Pagination

  • Previous page ‹‹
  • Page 271
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact