Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/2/2021 - P37

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P37

=

}

i
“i | ji ) &

Finance Committee - Agenda - 6/2/2021 - P36

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P36

=

Mobile Outreach Services

o LEAD TESTING AT142
2 : 2 ITs WHAT WE DG!

CF:

emt ease

Finance Committee - Agenda - 6/2/2021 - P35

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P35

Finance Committee - Agenda - 6/2/2021 - P34

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P34

Legend
? 14 Court St

! | A
eT Py 4 if, | é i |
i ae a |
| ee hoe
| | H hh | .
5 men | | i henge S ~
> - f == | | } the | / } /
° Boos pas | | | |
a ftaeese
'

CL JEPDM Area

EBEPDM Wall Coverage 1375.7 SQFT[_] wre
.) Shingle Roof 5420.9 SQFT|_|

Reeth
ee

aa a = “, t . = .) Tower Roof Shingles 421.1 SQFT[_| ad
att he a & —. Ari}

Finance Committee - Agenda - 6/2/2021 - P33

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P33

3.7

3.8

3.9

B. Seal work projecting through or mounted on roof with asphalt roofing cement
and make weather tight.

INSTALLATION- ASPHALT SHINGLES

A. Install shingles in accordance with manufacturer’s instructions for product
type and application specified.

FIELD QUALITY CONTROL
A. Field inspection will be performed under provisions of Section 01 40 00.

B. Visual inspection of the work will be provided by Owner. If conditions are
unacceptable, Owner will notify the Architect.

Finance Committee - Agenda - 6/2/2021 - P32

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P32

A. Follow shingle manufacturer's recommendations for acceptable roof
deck material

B. Broom clean deck surfaces under eave protection and underlayment
prior to their application

3.3. INSTALLATION — EAVE ICE DAM PROTECTION

A. Place eave edge and gable metal edge flashing tight with fascia boards.
Weather-lap joints 2 inches (50mm). Secure flange with nails spaced 8 inches (200
mm) on center.

Finance Committee - Agenda - 6/2/2021 - P31

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P31

1. CertainTeed WinterGuard Sand
2. CertainTeed WinterGuard HT
3. CertainTeed WinterGuard Granular

2.4

2.5

2.6

PART 3
3.1

3.2

FLASHING MATERIALS

A. Sheet Flashing: ASTM A 361/A361M; 26 Gauge (0.45 mm) steel with
minimum G115/Z350 galvanized coating

B. Sheet Flashing: ASTM B 209; 0.025 (0.63mm) thick aluminum, mill
finish.

C. Sheet Flashing: ASTM B 370; cold rolled copper; 16 ounces per square
foot (0.55mm), natural finish.

Finance Committee - Agenda - 6/2/2021 - P30

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P30

manufacturers’ conditions and instructions are met by contractor.

F. Refer to manufacturer’s warranty for adjustments for commercial applications.

PART 2 PRODUCTS
2.1 MANUFACTURERS

Acceptable Manufacturer: Provide products manufactured by the CertainTeed
Corporation. Contact Sales Support Group P.O. Box 860 Valley Forge, PA 19482
Toll Free 800-233-8990

A. Substitutions: Not permitted

B. Requests for substitutions will be considered in accordance with
provisions of Section 1600

2.2 ASPHALT FIBERGLASS SHINGLES

Finance Committee - Agenda - 6/2/2021 - P29

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P29

authorities having jurisdiction.

C. Deliver shingles to site in manufacturer’s unopened labeled bundles.

Promptly verify quantities and conditions. Immediately remove damaged
products from site.

1.7 PROJECT CONDITIONS

A. Anticipate and observe environmental conditions (temperature, humidity
and moisture) within limits recommended by manufacturer for optimum
results. Do not install products under environment conditions outside
manufacturer’s absolute limits.

B. Extra Material — Furnish under provision of section 01 70 00

Finance Committee - Agenda - 6/2/2021 - P28

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P28

2. ASTM D 3161/UL 997 Wind Resistance.
3. ASTM D 3462

E. Shop Drawings: Indicate specially configured metal flashing, jointing
methods and locations, fastening methods and locations and
installation details as required by project conditions indicated.

1.5 QUALITY ASSURANCE

Pagination

  • Previous page ‹‹
  • Page 270
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact