  2. Finance Committee - Agenda - 6/2/2021 - P18

Finance Committee - Agenda - 6/2/2021 - P18

By dnadmin on Mon, 11/07/2022 - 13:39
Document Date
Thu, 05/27/2021 - 15:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/02/2021 - 00:00
Page Number
18
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060220…

1.09

1.10

C.

Bids must be submitted as required by the owner and governing bodies.

Any conditions which are not shown on the shop drawings should be indicated ona copy of the shop drawing
and included with bid submittal if necessary to clarify any conditions not shown.

TEMPORARY FACILITIES AND CONTROLS

A.

Temporary Utilities:

1. Water, power for construction purposes and lighting are/are not available at the site and will/will
not be made available to the roofing contractor.

2. Provide all hoses, valves and connections for water from source designated by the owner when made
available.
3. When available, electrical power should be extended as required from the source. Provide all

trailers, connections and fused disconnects.
Temporary Sanitary Facilities

Sanitary facilities will not be available at the job site. The roofing contractor shall be responsible for the
provision and maintenance of portable toilets or their equal.

Building Site:
1. The roofing contractor shall use reasonable care and responsibility to protect the building and site
against damages. The contractor shall be responsible for the correction of any damage incurred as

a result of the performance of the contract.

2. The roofing contractor shall remove all construction debris from the job site in a timely and legally
acceptable manner so as to not detract from the aesthetics or the functions of the building.

Security:

Obey the owner’s requirements for personnel identification, inspection and other security measures.

JOB SITE PROTECTION

A.

The roofing contractor shall adequately protect building, paved areas, service drives, lawn, shrubs, trees, etc.
from damage while performing the required work. Provide canvas, boards and sheet metal (properly secured)
as necessary for protection and remove protection material at completion. The contractor shall repair or be
responsible for costs to repair all property damaged during the roofing application.

During the roofing contractor’s performance of the work, the building owner will continue to occupy the
existing building. The contractor shall take precautions to prevent the spread of dust and debris, particularly
where such material may sift into the building. The roofing contractor shall provide labor and materials to
construct, maintain and remove necessary temporary enclosures to prevent dust or debris in the construction
area(s) from entering the remainder of the building.

Do not overload any portion of the building, either by use of or placement of equipment, storage of debris,
or storage of materials.

Protect against fire and flame spread. Maintain proper and adequate fire extinguishers.

Take precautions to prevent drains from clogging during the roofing application. Remove debris at the
completion of each day’s work and clean drains, if required. At completion, test drains to ensure the system