Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P537

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P537

2.3

15400-3
PLUMBING — GENERAL

headworks, dewatering rooms, chemical rooms, clarifiers, aeration basins,
splitter structures, equalization or storage tanks, etc. For additional description
and definition of submerged surfaces refer to Specification Section 09900.

EQUIPMENT AND VALVE TAGS

A.

All new plumbing and HVAC (Mechanical Systems) equipment shall be identified

by a color coded equipment/valve tag, provided and installed by the Contractor.

Finance Committee - Agenda - 6/7/2017 - P536

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P536

15400-2
PLUMBING — GENERAL

1.3 JOB CONDITIONS

A.

Scheduling Work: Install and test all plumbing to be cast into or buried under
concrete floor slabs prior to the placement of concrete.

1.4 SUBMITTALS

A.

B.

C.

Prior to ordering fixtures, equipment and appurtenances, submit shop drawings in
accordance with the General Conditions of the Construction Contract.

Finance Committee - Agenda - 6/7/2017 - P535

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P535

15400-1

SECTION 15400

PLUMBING — GENERAL

PART 1 - GENERAL

1.1

1.2

DESCRIPTION

A.

Description: Perform the following items of work required to complete the work of

this Section, as shown on the DRAWINGS and specified herein:

Finance Committee - Agenda - 6/7/2017 - P534

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P534

3.2

15180-3
PIPE AND EQUIPMENT INSULATION

cover strips.

Insulation at sleeves:

1. ‘Insulation shall be continuous through all sleeves except where gas-tight seal
is indicated.

2. Provide aluminum cover on insulation where caulking is required.

3. Delete insulation at walls requiring a gas-tight seal.

Insulation at Hangers:

1. Insulation shall be continuous at hangers.

Finance Committee - Agenda - 6/7/2017 - P533

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P533

2.2

15180-2
PIPE AND EQUIPMENT INSULATION

3. Insulation shall have a maximum thermal conductivity of 0.27 Btu-in./h-ft2-
°F at a 75°F mean temperature when tested in accordance with ASTM C 177
or ASTM C 518, latest revision. Insulation shall have a maximum water vapor
transmission of 0.08 perm-inches when tested in accordance with ASTM E

96, Procedure A, latest revision.

4. Insulation Covering: Field applied PVC jacket with joining surfaces adhered

Finance Committee - Agenda - 6/7/2017 - P532

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P532

15180-1

SECTION 15180

PIPE AND EQUIPMENT INSULATION

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included: Provide and apply insulation to all interior piping and equipment in
accordance with Table 1.
B. Related Work Specified Elsewhere: "Plumbing - General" and "HVAC General"
are specified in this Division.

12 QUALITY ASSURANCE
A. Standards:
1. Fiberglass pipe insulation shall conform to ASTM C547.
2. All-service vapor retarder jacket shall conform to ASTM C1136.

Finance Committee - Agenda - 6/7/2017 - P531

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P531

15094-8
PREFABRICATED PIPE HANGERS, SUPPORTS AND BRACING

4. Do not remove the temporary clamps until the piping is correctly installed on
the permanent supports.

3.2 TESTING

A.
B.

All permanent pipe supports shall be installed prior to testing.

Demonstrate compliance with the requirements of this section with respect to
support, pitch, vibration, movement, and expansion and contraction during start-up
testing of the equipment and associated piping systems as indicated in Section
01800.

Finance Committee - Agenda - 6/7/2017 - P530

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P530

15094-7
PREFABRICATED PIPE HANGERS, SUPPORTS AND BRACING

Systems (Chemset Capsule Series); Power Fasteners (T308 Plus); or
equivalent.

2. Expansion anchors. Stainless steel AISI Type 316 for galvanized and
aluminum fabrications; cadmium plated for painted steel fabrications.
Manufactured by Hilti Fastening Systems (Kwik Bolt HI); Ramset Fastening
Systems (Tru Bolt Stud Anchor); Power Fasteners (Power Stud); or
equivalent.

PART 3 - EXECUTION

3.1

INSTALLATION

A.

B.

Finance Committee - Agenda - 6/7/2017 - P529

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P529

15094-6
PREFABRICATED PIPE HANGERS, SUPPORTS AND BRACING

Finance Committee - Agenda - 6/7/2017 - P528

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P528

E.

15094-5
PREFABRICATED PIPE HANGERS, SUPPORTS AND BRACING

i. Anvil International, Inc. (Fig 177)

ii. Carpenter & Patterson Inc. (Fig 142)

iit. Or equal

Pipe Clamp (Type F).:

i. Anvil International, Inc. (Fig 212, Fig 216 or Fig 295 Clamp w/
Fig 272 Eyerod)

ii. Carpenter & Patterson Inc. (Fig 175, Fig 298 or Fig 304 Clamp w/
Fig 93 Eyerod)

iit. Or equal

U-Bolt (Type S)

i. Anvil International, Inc. (Fig 137)

ii. Carpenter & Patterson Inc. (Fig 283)

iit. Or equal

Pagination

  • Previous page ‹‹
  • Page 1243
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact