Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P536

Finance Committee - Agenda - 6/7/2017 - P536

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
536
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

15400-2
PLUMBING — GENERAL

1.3 JOB CONDITIONS

A.

Scheduling Work: Install and test all plumbing to be cast into or buried under
concrete floor slabs prior to the placement of concrete.

1.4 SUBMITTALS

A.

B.

C.

Prior to ordering fixtures, equipment and appurtenances, submit shop drawings in
accordance with the General Conditions of the Construction Contract.

Submit to the Engineer: Copies of manufacturer's installation, maintenance and
operating instructions including parts lists for all equipment furnished as specified in
the General Conditions of the Construction Contract.

Submit a list of local supply houses for replacement parts for all equipment furnished.

15 DELIVERY, STORAGE & HANDLING

>

™mMOOW

Exercise care during loading, transporting, unloading and handling to prevent damage
of any nature to interior and exterior surfaces of equipment, fixtures, pipe and fittings.
Do not drop equipment and fixtures.

Store materials on the project site in enclosures or under protective coverings.
Assure that all materials are kept clean and dry.

Do not store materials directly on the ground.

Exercise care so as not to damage, crack, mar finish and to prevent damage of any
nature to fixtures.

1.6 SEISMIC CONTROL

A.

Not applicable.

PART 2 - PRODUCTS

2.1 MATERIALS

A.

B.

Provide materials that are new, suitable for intended use, and of type, style, and
quality specified and as shown on the Drawings.

Provide pipe, fittings, and devices that meet requirements of local plumbing codes
and be in accordance with applicable ASTM, ANSI, and Commercial Standard (CS)
standards.

2.2 BOLTS, ANCHOR BOLTS AND NUTS

A.

Furnish all necessary bolts, anchor bolts, nuts, washers, lock washers or locking nuts,
plates and bolt sleeves in accordance herewith. Anchor bolts shall have suitable
washers, lock washers and, where so required, their nuts shall be hexagonal.

All bolts, anchor bolts, nuts, washers, lock washers, plates, and bolt sleeves shall be

galvanized unless otherwise indicated below or specified elsewhere.

1. Galvanized steel in accordance with Division 5 unless otherwise indicated
below or specified elsewhere.

2. Stainless steel hardware (minimum of Type 304, unless otherwise indicated) is
required in all corrosive atmospheres, exterior areas, and/or areas with NEMA
4X or NEMA 7 rating.

3. Stainless steel hardware (minimum of Type 316, unless otherwise indicated) is
required in all submerged applications, including but not limited to the

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P536

Footer menu

  • Contact