Finance Committee - Agenda - 5/17/2017 - P120

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P120

See revised Bid Form showing Item 1p Manhole Invert Lining DELETED and Item 1p(1)
Manhole Invert Rebuild ADDED. There will be one (Each) unit of this added item in the
contract. This unit is located in the manhole at the intersection of Mulberry St and Walnut St.
Specification Section 02800:

Coating shall be epoxy, not polyurethane.

Change all of Section 3.05 to read as follows:

Finance Committee - Agenda - 5/17/2017 - P119

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P119

Drawing Sheet 15. At Taylor St, for the 8” storm drain replacement:

Catch Basin Rim Elev: 181.95
Invert Elev: 178.52

Note: Upon further review, the 8” clay storm drain connects directly to the

18” clay sewer main at Main St at approximate invert depth of approx. 5.5’

Drawing Sheet 15. At 375 Main St, for the 12 LF section of drain pipe replacement:

Catch Basin Rim Elev: 187.59
Invert Elev: 184.99

Depth to invert of 12” main (of unknown material) is approximately 5’.

Drawing Sheet 17. Mulberry St

Finance Committee - Agenda - 5/17/2017 - P118

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P118

2017 SEWER PROJECT

IFB0779-041217

Addendum 1

Streets with full-width pave vs trench/3’ overcut only (see attached list).

Gravel Road Base is NHDOT Spec 304.4 Crushed Stone (Fine).

Additional invert/depth information:

Drawing Sheet 14. At Stevens St, for the 13 LF section of 8” pipe replacement:

Catch Basin Rim Elev: 193.00
Invert Elev: 189.23

Manhole Rim Elev: 192.81
Invert Elev: 188.41

Drawing Sheet 14. At Montgomery Ave, for the 75 LF section of 8” pipe replacement:

Finance Committee - Agenda - 5/17/2017 - P117

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P117

THE CITY OF NASHUA sa beaitey

Financial Services
Purchasing Departateut
March 24, 2017
{FBO779-041217
2017 SEWER REPLACEMENT PROGRAM
ADDENDUM #1

Information included in this document becomes a part of the original IFB.

Please sign below to indicate receipt of this additional information and include this page with your bid

submittal.

Addendam #1 is being issued to revise the following Bid areas which have files attached:

Finance Committee - Agenda - 5/17/2017 - P116

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P116

DIVISION 1

INVITATION TO BID

Finance Committee - Agenda - 5/17/2017 - P115

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P115

Section Number

02

02085
02111

02252
02300
02324
02441

02451
02518
02530
02533

02534
02619
02631
02650
02650A
02745
02745A
02769

02800
02930

Description
SITE WORK

Polyvinyl Chloride Gravity Pipe and Fittings
Removal of Undocumented Asbestos from
Underground Utilities

Support of Excavation

Earthwork

Rock Excavation and Disposal

Cleaning, Television Inspection, and Testing of New
Pipelines

Finance Committee - Agenda - 5/17/2017 - P114

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P114

TABLE OF CONTENTS

DIVISION
1. INVITATION FOR BID 0... ccc eter cee trees teneeeteeneeteeeees
2. INFORMATION FOR BIDDERS ....000.0.0o occ eee eet tntetneeees

3. BID FORM, BID BOND, BID SCHEDULE, AND CONTRACTOR’S
QUALIFICATIONS 000i eect cee eee eentenieenesneeneneeneneens

Finance Committee - Agenda - 5/17/2017 - P113

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P113

2017 Sewer Replacement Program

Construction Specifications
and
Contract Documents

Prepared By:

Engineering Department
9 Riverside St
Nashua, NH 03062
Tel: (603) 589-3120
Fax: (603) 589-3169

Prepared For:

City of Nashua, New Hampshire
Division of Public Works
Engineering Department

March 2017

Finance Committee - Agenda - 5/17/2017 - P112

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P112

[ztem # Item Description Estimated Quantity Unit Unit Price Total Price|
20 REMOVE EXISTING PIPE BY EXCAVATION OUTSIDE OF 25.00 LF $100.06 $2,500.00
AN ADJACENT TO PROPOSED PIPE TRENCH
2Q REMOVE TOP 3VF OF EXIST STRUCTURE, FILL WITH 5.00 EACH $745.00 $3,725.00
GRAVEL, RESTORE ROAD
ar REMOVE ABANDONED LATERAL, FILL WITH GRAVEL, 20.00 EACH $1,650.00 $33,000.00
RESTORE ROAD
25(12M) ROOT CUTTING , 12" PIPE - MEDIUM ROOTS 1,00 LF $475.00 $475.00
25(18M) ROOT CUTTING 18” PIPE - MEDIUM ROOTS 1.00 LF $475.00 $475.00

Finance Committee - Agenda - 5/17/2017 - P111

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P111

DEFELICE CORPORATION

Phone: 978-452-6967