[ztem # Item Description Estimated Quantity Unit Unit Price Total Price|
20 REMOVE EXISTING PIPE BY EXCAVATION OUTSIDE OF 25.00 LF $100.06 $2,500.00
AN ADJACENT TO PROPOSED PIPE TRENCH
2Q REMOVE TOP 3VF OF EXIST STRUCTURE, FILL WITH 5.00 EACH $745.00 $3,725.00
GRAVEL, RESTORE ROAD
ar REMOVE ABANDONED LATERAL, FILL WITH GRAVEL, 20.00 EACH $1,650.00 $33,000.00
RESTORE ROAD
25(12M) ROOT CUTTING , 12" PIPE - MEDIUM ROOTS 1,00 LF $475.00 $475.00
25(18M) ROOT CUTTING 18” PIPE - MEDIUM ROOTS 1.00 LF $475.00 $475.00
3A CATCH BASIN (INSTALL OR REPLACE) 60.00 EACH $3,150.00 $189,000.00
3B ADJUST SMH FRAME AND COVER OR CB FRAME AND 6,00 EACH $150.00 $900.00
GRATE
3c REPLACE 24" CB FRAME AND GRATE 5.00 EACH $460.00 $2,300.00
3D REPLACE 30" MH FRAME AND COVER 5.00 EACH $500.00 $2,500.00
4h TEST PITS 880.00 CY $2,00 $880.00
SA CALCIUM CHLORIDE 34,000.00 LB $0.01 $340.00
58 SILT SACK 100.00 EACH $56.00 $5,600.00
68 CRUSHED GRAVEL 5,800.00 CY $36.00 $208,800.00
6B(1) vn (ROADWAY GRAVELS PRIOR TO BASE 14,500.00 SY $1.75 $25,375.00
6c BINDER (BASE) COURSE MATERIAL HOT SIT 3,000.00 TON $90.18 $270,540.00
PAVEMENT
6D TOP COURSE MATERIAL HOT SITUMINOUS PAVEMENT 970.00 TON $87.34 $84,719.80
6E TEMPORARY BITUMINOUS PAVEMENT 1,210.00 TON $63.00 $76,230.00
6F(1) COMMON EXCAVATION FOR ROADWAY GRAVEL, 8,000.00 CY $12.50 $100,000.00
PAVEMENT AND INCREASE OF CURB REVEAL
6G SAWED BITUMINOUS PAVEMENT 10,500.00 LF $2.00 $21,000.00
6H COLD PLANNING 250.00 SY $13.10 $3,275.00
6! REMOVE AND RESET GRANITE CURBING 2,300.00 LF $25.00 $57,500.00
a) INSTALL VERTICAL GRANITE CURBING 10.00 LF $42.00 $420.00
6K REMOVE AND REPLACE 4" PC CONCRETE SIDEWALK 710.00 SY $48.00 $34,080.00
6K(1) REMOVE AND REPLACE 6" PC CONCRETE DRIVEWAY 30.00 SY $65.00 $1,950.00
6L REMOVE AND REPLACE 2" BITUMINOUS CONCRETE 180.00 SY $34,00 $6,120.00
SIDEWALK
6m HOT BITUMINOUS PAVEMENT HAND METHOD 70.00 TON $120.00 $8,400.00
6N DETECTABLE WARNING AT WHEELCHAIR RAMP 30.00 EACH $1,250.00 $37,500.00
60 REMOVE AND RESET BRICK SIDEWALK 150.00 SY $44.00 $6,600.00
6Q ASBESTOS PIPE REMOVAL (ALL DIAMETERS) 30.00 LF $80.00 $2,400.00
6S REMOVAL OF 6" THICK CONCRETE UNDER PAVEMENT 40.00 SY $25.00 $1,000.00
7A MOBILIZATION 1.00 LS $145,000.00 $145,000.00
8A POLICE OFFICERS 3.00 AL $92,000.00 $92,600.00
8B FLAGMEN 1.00 AL $72,000.00 $72,000.00
8c MAINTENANCE OF TRAFFIC 1.00 LS $150,000.00 $150,000.00
8D RAISED TEMP, PAVEMENT MARKERS DOUBLE FACED 140.00 EACH $5.00 $700.00
8E 4" RETROREFLECTIVE WHITE PAINTED LINES 2,300.06 LF $0.25 $575.00
8F 4" DOUBLE RETROREFLECTIVE YELLOW PAINTED 1,100.00 LF $0.50 $550.00
LINES
8G 12” RETROREFLECTIVE WHITE THERMO LINES 3,330.00 LF $5.00 $16,650.00
aI SIGNAL DETECTOR LOOPS 1,00 EACH $2,200.00 $2,200.00
8) REMOVE AND RESET STOP SIGN 1.00 EACH $25.00 $25,00
oA ASPHALT CEMENT COST ADJUSTMENT 1.00 AL $18,000.00 $28,000.00
98 NIGHT CREW 140.00 HR $1.00 $140.00
oC ASBESTOS MATERIAL REMOVAL DISPOSAL 1.00 AL $25,000.00 $25,000.00
10 DYE TESTING CONNECTIONS 90.00 EACH $25.00 $2,250.00
u CONTINGENCY FOR RAILROAD COORDINATION ON 1.00 AL $20,000.00 $20,000.00
TEMPLE STREET
1A CONTINGENCY FOR CONTAMINATED SOIL 1.00 AL $20,000.00 $20,000.00
EXCAVATION AND DISPOSAL
12(12)} PRE CONSTRUCTION SEWER VIDEOS FOR 100.00 LF $3.00 $300.00
REPLACEMENT OF 12” PIPE INCLUDES ALL
PRECLEANING
1215) PRE CONSTRUCTION SEWER VIDEOS FOR 566.00 LF $4.00 $2,240.00
REPLACEMENT OF 15" PIPE, INCLUDES ALL
PRECLEANING
12(24) PRE CONSTRUCTION SEWER VIDEOS FOR 550.00 LF $4.00 $2,200.00