Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P119

Finance Committee - Agenda - 5/17/2017 - P119

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
119
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

Drawing Sheet 15. At Taylor St, for the 8” storm drain replacement:

Catch Basin Rim Elev: 181.95
Invert Elev: 178.52

Note: Upon further review, the 8” clay storm drain connects directly to the

18” clay sewer main at Main St at approximate invert depth of approx. 5.5’

Drawing Sheet 15. At 375 Main St, for the 12 LF section of drain pipe replacement:

Catch Basin Rim Elev: 187.59
Invert Elev: 184.99

Depth to invert of 12” main (of unknown material) is approximately 5’.

Drawing Sheet 17. Mulberry St

Walnut St Manhole Rim Elev: 154.03
Invert Elev: 138.23

Chestnut St Manhole Rim Elev: 154.18
Invert Elev: 142.18

Catch Basin at 78 Chestnut St Rim Elev: 153.85
Invert Elev: 150.16

Sewer service replacement (general clarification): Typical replacement up to the ROW line.

Item 1p Manhole Invert Lining and Item 1p(1) Manhole Invert Rebuild:

Page 2 of 3

Page Image
Finance Committee - Agenda - 5/17/2017 - P119

Footer menu

  • Contact