Finance Committee - Agenda - 5/17/2017 - P410
Prior to construction of the sliplining repair, the Contractor shall submit
shop drawings, details, and descriptions to include construction methods and
equipment, process description, access locations, receiving manhole
locations, flow handling, bypass pumping, flow diversion, and or dewatering
methods and design calculations to assure that the work can be
accomplished as specified in this section. Pre- and post-construction video
documentation shall be provided to the Engineer as specified in pertinent
sections of the contract.