For the pneumatically assisted sliplining method(s) of pipe rehabilitation, the
Contractor shall submit the following information specific to the proposed
project.
1. Name(s) of all supervisory personnel to be directly involved with
each pneumatically assisted sliplining method of pipe renewal for
this project. Supervisory personnel shall have a minimum of two
years experience and two completed projects for the installation of
pneumatically assisted sliplining renewal pipe within the past five
years. Attach resumes of each person named. Resume information
shall include, as a minimum, the number of years in a supervisory
capacity and a list of projects worked on within the past five years,
describing the type of construction, project description, complexity,
contract amounts, and educational background.
2. Describe the pipe renewal method(s) proposed on this Contract,
including, but not limited to, the following:
a. Name, business, address, and telephone number of each
sliplining manufacturer of the pipe rehabilitation method
proposed; a description of each method; and any variances
that the Contractor may be proposing from the specified
methods.
b. Hours of operation, sequencing of work description, number
of shifts, number of crews, and expected time to complete
the work for each renewal method proposed.
C. Describe any surface activities that will be required and any
mitigative measures that will be used to reduce surface
impacts as part of each renewal method proposed.
d. Describe rehabilitation method, manufacturer, including
sequencing of operations, scheduling, time of completion,
hours of operation, surface impacts, access and staging
location(s), and other considerations that may be pertinent to
the proposed work.
3. The Contractor shall sign and date the information provided and
certify that to the extent of his knowledge, the information is true
and accurate, and that the supervisory personnel and method(s) of
pipe rehabilitation proposed will be directly involved with and used
on this project, respectively. Substitutions of personnel and/or
methods will not be allowed without written authorization of the
Engineer.
02769-2